Home / Browse projects / Pune, Maharashtra / Aditya Vivaaz Project Three

Registered Litigation declared Residential / Group Housing project

Aditya Vivaaz Project Three

By ADITYA PROMOTERS

RG-MH-07445 · RERA P52100077137 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 10Construction stages donefurthest along: Podiums (if any), 85%
229 of 344Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

Aditya Vivaaz Project Three is a Residential / Group Housing project by ADITYA PROMOTERS in Pune, Maharashtra, registered with MahaRERA as P52100077137 on 23 Jul 2024. Possession is promised by 31 Dec 2028. 115 of the 344 units on this registration are recorded sold or booked, and 3 of 10 construction stages are filed complete.

At a glance

Project

  • NameAditya Vivaaz Project Three
  • TypeResidential / Group Housing
  • Location
    • SB PATIL ROAD
    • RAVET
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077137
  • ReraGenie IDRG-MH-07445

Builder

  • NameADITYA PROMOTERS
  • Entity typePartnership
  • PartnersLALITKUMR BHIKCHAND KATARIA, SHANTILAL BHIKCHAND KATARIA, SATISH BHIKCHAND KATARIA, PRAVINKUMAR BHIKCHAND KATARIA, SHOBHADEVI KEVALCHAND KATARIA
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed123 files

Current status

33%115 of 344 units booked
62.6%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A3A,B26223440344

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 10 construction stages are filed complete. The stage furthest along is Podiums (if any), at 85%.

A3 · wing A,B: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)85%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYesNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed669

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots669
Closed/Covered669

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,338 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation PCMC
Permissible FSI36948.48
Proposed, not sanctioned36,948 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHOP NO1 A WING SAISHWAR APTS CTS NO 580 NARAYAN PETH N C KELKAR ROAD PUNE 411030
Estimated costRs 132.00 cr
Cost incurredRs 82.60 cr
Work done62.58%
BuildingWingEstimatedIncurred
A3A,BRs 112.00 crRs 73.10 cr
-NARs 20.00 crRs 9.50 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSiddarth Harischandrakar
EngineerJW Consultants LLP Umesh Joshi
EngineerRaju Hagalambe
Chartered AccountantSiddhant Abhay Bora
PartnerRole in project
ADITYA PROMOTERS-

Litigation declared1

CaseCourtStatus
5334/2021DEPUTY DIRECTOR LAND RECORDS PUNEClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AP_FORM 1_2025-26 Q4.pdf27 Apr 2026
Withdrawal Update Form 1File: AP_FORM 1_2025-26 Q4.pdf27 Apr 2026
Withdrawal Update Form 2File: AP_FORM 2_2025-26 Q4.pdf27 Apr 2026
Withdrawal Update Form 2File: AP_FORM 2_2025-26 Q4.pdf27 Apr 2026
Withdrawal Update Form 3File: AP_FORM 3_2025-26 Q4.pdf27 Apr 2026
Withdrawal Update Form 3File: AP_FORM 3_2025-26 Q4.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 (1).pdf24 Jan 2026
Withdrawal Update Form 3File: SIGNED FORM-3 ADITYA PROMOTERS PH-3 (2)_compressed (1).pdf24 Jan 2026
Form 5 (FY 2024-2025)File: SIGNED FORM-5 AP PH-3.pdf5 Jan 2026
Building plan approvalFile: 1 OF 16_compressed.pdf4 Dec 2025
Building plan approvalFile: 2 OF 16.pdf4 Dec 2025
Building plan approvalFile: 3 OF 16.pdf4 Dec 2025
Building plan approvalFile: 4 OF 16_compressed.pdf4 Dec 2025
Building plan approvalFile: 5 OF 16_compressed.pdf4 Dec 2025
Building plan approvalFile: 6 OF 16.pdf4 Dec 2025
Building plan approvalFile: 7 OF 16.pdf4 Dec 2025
Building plan approvalFile: 8 OF 16.pdf4 Dec 2025
Building plan approvalFile: 9 OF 16_compressed.pdf4 Dec 2025
Building plan approvalFile: 10 OF 16_compressed.pdf4 Dec 2025
Building plan approvalFile: 11 OF 16_compressed.pdf4 Dec 2025
Building plan approvalFile: 12 OF 16_compressed.pdf4 Dec 2025
Building plan approvalFile: 13 OF 16_compressed.pdf4 Dec 2025
Building plan approvalFile: 14 OF 16.pdf4 Dec 2025
Building plan approvalFile: 15 OF 16.pdf4 Dec 2025
Building plan approvalFile: 16 OF 16.pdf4 Dec 2025
Withdrawal Update Form 1File: FORM 1SEPT 25.pdf28 Nov 2025
Withdrawal Update Form 2File: form 2 (5).pdf28 Nov 2025
Withdrawal Update Form 3File: SIGNED FORM-3_compressed.pdf28 Nov 2025
Withdrawal Update Form 1File: FORM 1SEPT 25.pdf25 Nov 2025
Withdrawal Update Form 2File: Form 2 sept-25.pdf25 Nov 2025
Withdrawal Update Form 3File: SIGNED FORM-3_compressed.pdf25 Nov 2025
Form 1File: Form 1.pdf28 Aug 2025
Form 2File: Form 2 (2).pdf28 Aug 2025
Form 3File: FORM-3 SCANNED.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf28 Aug 2025
Form 1File: FORM1 AP3 DEC24.pdf18 Aug 2025
Form 2File: ENGINNER CERTIFICATE 2.pdf18 Aug 2025
Form 3File: RERA FORM 3_compressed.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold booked Dec 24.pdf18 Aug 2025
Form 1File: FORM 1 AP3 MAR 25.pdf18 Aug 2025
Form 2File: FORM 2 AP3 MAR 25.pdf18 Aug 2025
Form 3File: FORM 3 AP3 MAR 25 (1).pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED MAR25.pdf18 Aug 2025
Form 1File: Form 1.pdf18 Aug 2025
Form 2File: form 2.pdf18 Aug 2025
Form 3File: SIGNED FORM 3 (2)_compressed.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: UNSOLD SEPT-24.pdf18 Aug 2025
Layout approvalFile: 1 OF 12 c.pdf22 Jul 2025
Building plan approvalFile: 2 OF 12 .pdf22 Jul 2025
Building plan approvalFile: 3 OF 12 C.pdf22 Jul 2025
Building plan approvalFile: 4 OF 12 _compressed.pdf22 Jul 2025
Building plan approvalFile: 5 OF 12 .pdf22 Jul 2025
Layout approvalFile: 6 OF 12 .pdf22 Jul 2025
Building plan approvalFile: 7 OF 12 .pdf22 Jul 2025
Building plan approvalFile: 8 OF 12 .pdf22 Jul 2025
Building plan approvalFile: 9 OF 12 C.pdf22 Jul 2025
Building plan approvalFile: 10 OF 12 .pdf22 Jul 2025
Building plan approvalFile: 11 OF 12 .pdf22 Jul 2025
Building plan approvalFile: 12 OF 12 .pdf22 Jul 2025
ORDER29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AP3 MAR 25.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AP3 MAR 25 (1).pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 AP3 DEC 24.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AP3 MAR 25.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD BOOKED MAR25.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A AP3 MAR 25.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 AP3 DEC24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3-.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold booked Dec 24.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf20 Jan 2025
Copy of the legal title reportFile: 2) LEGAL TITLE REPORT 081124.pdf30 Nov 2024
Copy of the legal title reportFile: 1) TITLE OPINION 081124.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A FOR QUALITY ASSURANCE.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3-compressed.pdf20 Oct 2024
Copy of the legal title reportFile: TITLE REPORT AP.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3.pdf4 Jul 2024
Proforma of Agreement for saleFile: 29 06 2024 ADITYA VIVAAZ AGREEMENT DRAFT.pdf4 Jul 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ADITYA VIVAAZ PROJECT TWOSR NO 92 PART RAVET PUNE102CompletedOct 2025Nov 2023
Aditya Vivaaz Project OneS B Patil School Road ravet108CompletedAug 2018Mar 2018
ADITYA GARDEN FLORAA83 PART WARJE PUNE176CompletedMay 2013Late, Sep 2013

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aditya Vivaaz Project Three on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVET13,700+ in Pune

2 kmAditya Vivaaz Project ThCompleted 84Lapsed / revoked 28Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 210 registered projects within 2 km.

Builder: ADITYA PROMOTERS

ADITYA PROMOTERS has 4 registrations on MahaRERA, including ADITYA VIVAAZ and Aditya Vivaaz Project Two. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Aditya Vivaaz Project Three is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aditya Vivaaz Project Three?

The registered promoter entity is ADITYA PROMOTERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aditya Vivaaz Project Three?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aditya Vivaaz Project Three?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aditya Vivaaz Project Three?

The professionals named in the filing: Architect: Siddarth Harischandrakar; Engineer: JW Consultants LLP Umesh Joshi; Engineer: Raju Hagalambe; Chartered Accountant: Siddhant Abhay Bora. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aditya Vivaaz Project Three?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aditya Vivaaz Project Three. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aditya Vivaaz Project Three to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.