Home / Browse projects / Thane, Maharashtra / Ace Enclave

Registered No litigation declared Residential / Group Housing project

Ace Enclave

By Ace Signature Homes LLP

RG-MH-69448 · RERA P51700046536 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
90 of 249Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

Ace Enclave is a Residential / Group Housing project by Ace Signature Homes LLP in Thane, Maharashtra, registered with MahaRERA as P51700046536 on 10 Aug 2022. Possession is promised by 31 Dec 2026. 159 of the 249 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAce Enclave
  • TypeResidential / Group Housing
  • Location
    • Mogharpada Village Road
    • Mogharpada
    • Thane (M Corp.)
    • Thane
    • 400615
  • Pincode400615
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700046536
  • ReraGenie IDRG-MH-69448

Builder

  • NameAce Signature Homes LLP
  • Entity typePartnership
  • Partnermanish dhiraj dedhia
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Aug 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed51 files

Current status

64%159 of 249 units booked
89.3%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ace EnclaveNA23212490249

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Ace Enclave: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed228

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots228
Closed/Covered54
Open Space174

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Apr 2026
LandownerVillageDistrict
Navnath tureThane (M Corp.)Thane
sakharam namdev thakurThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI12181.16
Proposed, not sanctioned11,181 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAnmol House, Ghantali Road, Thane 400602
Estimated costRs 42.00 cr
Cost incurredRs 37.50 cr
Work done89.29%
BuildingWingEstimatedIncurred
Ace EnclaveNARs 40.50 crRs 36.81 cr
-NARs 1.50 crRs 68.50 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTen Folds architect & consultants
EngineerRC Tipnis
Chartered AccountantAR CHHEDA & associates
PartnerRole in project
Ace Signature Homes LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602635RAMPAL SHIVMANGAL VERMAAce Signature Homes LLP06/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf11 May 2026
Withdrawal Update Form 1File: Form 1.pdf11 May 2026
Withdrawal Update Form 1File: Form 1.pdf11 May 2026
Withdrawal Update Form 1File: Form 1.pdf11 May 2026
Withdrawal Update Form 1File: Form 1.pdf11 May 2026
Withdrawal Update Form 1File: Form 1.pdf11 May 2026
Withdrawal Update Form 1File: Form 1.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE Sep25.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE Sep25.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE Sep25.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE Sep25.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE June25.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE Dec25.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE Dec25.pdf11 May 2026
Withdrawal Update Form 3File: Ace Enclave Form3 Sep25.pdf11 May 2026
Withdrawal Update Form 3File: Ace Enclave Form3 Sep25.pdf11 May 2026
Withdrawal Update Form 3File: Ace Enclave Form3 Sep25.pdf11 May 2026
Withdrawal Update Form 3File: Ace Enclave Form3 Sep25.pdf11 May 2026
Withdrawal Update Form 3File: Ace Enclave Form3 June25.pdf11 May 2026
Withdrawal Update Form 3File: Ace Enclave Form3 Dec25.pdf11 May 2026
Withdrawal Update Form 3File: Ace Enclave Form3 Dec25.pdf11 May 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ace_Enclave_New_CA_Certificate_Form 3.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ace_Enclave_New_CA_Certificate_Form_compressed (1).pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER’S CERTIFICATE (2).pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ace_Enclave_New_CA_Certificate_Form.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER’S CERTIFICATE.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Enclave_FORM 5 MAHARERA.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER’S CERTIFICATE.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ace_Enclave_New_CA_Certificate_Form.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Feb 2023
Proforma of Allotment letterFile: Enclave final agreement 1.pdf6 Aug 2022
Deviation Report with respect to model copy of AgreementFile: FINAL deviation in AFS.pdf6 Aug 2022
Deviation Report with respect to Allotment letterFile: DocScanner 27-Jul-2022 7-49 pm.pdf29 Jul 2022
Proforma of Allotment letterFile: Allotment letter Final.pdf27 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf27 Jul 2022
Details of encumbrances concerned to FinanceFile: NO ENCUMERANCE TO Finance.pdf22 Jul 2022
Details of encumbrances concerned to LegalFile: NO Encumberance Certifica.pdf22 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Form 3.pdf22 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200242653011_For_Asset_Based_Search_20_07_2022_16_28_19_597.pdf20 Jul 2022
Declaration in FORM BFile: Form B.pdf15 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate Form 1.pdf15 Jul 2022
Declaration about Commencement CertificateFile: Declaration Of CC.pdf13 Jul 2022
Layout approvalFile: Layout.pdf5 Jul 2022
Building plan approvalFile: Building Plan.pdf5 Jul 2022
PAN CardFile: ACE SIGNATURE HOMES LLP-PAN.pdf5 Jul 2022
Copy of the legal title reportFile: Title Certificate.pdf5 Jul 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf5 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf5 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200239976764_For_Asset_Based_Search_17_06_2022_15_34_29_280.pdf5 Jul 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Ace CourtyardP51700033813Mogharpada, ThaneMar 2022CompletedMar 2024Mar 2024

How this compares with Thane

64%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ace Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mogharpada7,600+ in Thane

2 kmAce EnclaveCompleted 71Lapsed / revoked 19Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 138 registered projects within 2 km.

Builder: Ace Signature Homes LLP

Ace Signature Homes LLP has 2 registrations on MahaRERA, including Ace Courtyard and Ace Enclave. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Ace Enclave is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ace Enclave?

The registered promoter entity is Ace Signature Homes LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ace Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Ace Enclave?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Ace Enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ace Enclave?

The professionals named in the filing: Architect: Ten Folds architect & consultants; Engineer: RC Tipnis; Chartered Accountant: AR CHHEDA & associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ace Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ace Enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ace Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.