ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ACE AURUM COMMERCIAL

Completed No litigation declared Commercial project

ACE AURUM COMMERCIAL

By AALIA HOMES

RG-MH-22123 · RERA P52100030450 · Last updated on MahaRERA portal: 3 Jan 2025

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

ACE AURUM COMMERCIAL is a Commercial project by AALIA HOMES in Pune, Maharashtra, registered with MahaRERA as P52100030450 on 25 Aug 2021. The registration is recorded completed; possession was promised by 31 Mar 2024.

At a glance

Project

  • NameACE AURUM COMMERCIAL
  • TypeCommercial
  • Location
    • 12 MTR SERVICE ROAD
    • MUMBAI-BANGLORE NATIONAL HIGHWAY
    • OPP. SENTOSA RESORT
    • NEAR MUKAI CHOWK RAVET
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030450
  • ReraGenie IDRG-MH-22123

Builder

  • NameAALIA HOMES
  • Entity typePartnership
  • PartnersSANJAY GOBINDRAM RAMCHANDANI, ANUP PARMANAND JHAMTANI, SAMEER RAJKUMAR JHAMTANI
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2021PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2021
  • Promised completion31 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

A BUILDING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered12
Open Space3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3112.06
Proposed, not sanctioned2,112 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchB WING G O SQUARE WAKAD PUNE 411057

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK:a architecture Ar. Hrishikesh Kulkarni
EngineerAvinash Kolewad
EngineerYOGESH PANDRI
EngineerKAILAS BADGUJAR
Chartered AccountantRAVI TALREJA & ASSOCIATES
PartnerRole in project
AALIA HOMES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019619Mar 2024 → Sep 2024

Reason as filed by the promoterWe have obtained the Completion Certificate for 18 units out of the total 28 units. Our project is completed in all manner, and we have applied for the final Occupancy Certificate for the remaining 10 units. However, due to continuous government holidays in the last month and election duties, there has been a delay in processing our application. To ensure compliance with all regulatory requirements and complete the necessary procedures for the remaining 10 units of our project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Aug 2024

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ALIA HOMES FORM 5 2023-24.pdf3 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Ace Aurum Commercial Form 4 and Declaration.pdf12 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A WING PART COMPLETION CERTIFICATE Dt 18012024.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: ACE AURUM COMMERCIAL.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACE AURUM COMMERCIAL BUILDING - A.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ace Aurum Commercial A Building.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACE AURUM COMMERCIAL.pdf17 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A WING Full COMPLETION CERTIFICATE 14062024.pdf9 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf24 Apr 2024
Disclosure of sold/ booked inventoryFile: ACE AURUM COMMERCIAL.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACE AURUM COMMERCIAL.pdf20 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ACE AURUM COMMERCIAL.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ace Aurum Commercial.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE AURUM COMMERCIAL.pdf19 Apr 2024
Declaration in FORM BFile: FORM B Rera Extension Affidavit.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Ace Aurum commercial.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ace Aurum commercial Form 1.pdf27 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACE Aurum Commercial form 3.pdf27 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ace Aurum Commercial Form 2.pdf25 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AALIA HOMES COMMERCIAL MARCH 2023.pdf30 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalia Commercial.pdf30 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A building Part OC.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ACE AURUM.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aalia Homes Commercial.pdf6 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalia Homes Commercial.pdf6 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aalia Homes.pdf14 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalia Commercial.pdf11 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_Aurum Commercial.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aalia Commercial.pdf14 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aalia Commercial1.pdf14 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACE AURUM Commercial.pdf9 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Aalia Commercial Form 5.pdf1 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ACE AURUM COMMERCIAL Sept 22.pdf18 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE AURUM COMMERCIAL Sept 22.pdf12 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACE AURUM COMMERCIAL Sept 22.pdf12 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aurum Commercial.pdf29 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACE AURUM COMMERCIAL.pdf20 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACE AURUM COMMERCIAL.pdf20 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Aalia Ace Aurum Commercial Mar 21 P52100030450.pdf2 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Ace Aurum Commercial cmprsd.pdf10 Mar 2022
Layout approvalFile: LAYOUT.pdf13 Aug 2021
Building plan approvalFile: A Bldg Plan.pdf13 Aug 2021
Copy of the legal title reportFile: Search Title Report.pdf13 Aug 2021
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf13 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: A Bldg Plan.pdf13 Aug 2021
Details of encumbrancesFile: Declaration for Encumbrances.pdf5 Aug 2021
Declaration about Commencement CertificateFile: Declaration on Commencement Certificate.pdf5 Aug 2021
Declaration in FORM BFile: Declaration Form B.pdf5 Aug 2021
Proforma of Allotment letterFile: ACE AURUM COMMERCIAL _ ATS (1).pdf5 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA form 3_Aurum Commercial_CA Certificate.pdf4 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate A wing.pdf2 Aug 2021
PAN CardFile: Pancard of Aalia Homes.pdf31 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf31 Jul 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ACE AURUM COMMERCIAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP. SENTOSA RESORT, NEAR MUKAI CHOWK RAVET13,700+ in Pune

2 kmACE AURUM COMMERCIALCompleted 162Lapsed / revoked 119Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: AALIA HOMES

AALIA HOMES has 2 registrations on MahaRERA, including ACE AURUM - II PHASE 01 and ACE AURUM COMMERCIAL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ACE AURUM COMMERCIAL is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ACE AURUM COMMERCIAL?

The registered promoter entity is AALIA HOMES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ACE AURUM COMMERCIAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ACE AURUM COMMERCIAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ACE AURUM COMMERCIAL?

The professionals named in the filing: Architect: VK:a architecture Ar. Hrishikesh Kulkarni; Engineer: Avinash Kolewad; Engineer: YOGESH PANDRI; Engineer: KAILAS BADGUJAR; Chartered Accountant: RAVI TALREJA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ACE AURUM COMMERCIAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ACE AURUM COMMERCIAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ACE AURUM COMMERCIAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.