ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Abhilash Phase II

Registered No litigation declared Residential / Group Housing project

Abhilash Phase II

By SANJONA BUILDERS

RG-MH-83948 · RERA P51800033199 · Last updated on MahaRERA portal: 12 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 27 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 27 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
8 of 14Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Abhilash Phase II is a Residential / Group Housing project by SANJONA BUILDERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033199 on 9 Feb 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 27 months from the original filing. 6 of the 14 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAbhilash Phase II
  • TypeResidential / Group Housing
  • Location
    • SS - III 10th Chembur Road
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400071
  • Pincode400071
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800033199
  • ReraGenie IDRG-MH-83948

Builder

  • NameSANJONA BUILDERS
  • Entity typePartnership
  • PartnersAPURVA SUNIL GUPTA, SUNIL VIDYASAGAR GUPTA
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2022First promiseDec 2024Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Feb 2022
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed69 files

Current status

43%6 of 14 units booked
100.0%Work done, per cost certificate

Figures as on 12 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Abhilash Phase IINA5514014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Abhilash Phase II: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area384 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Chembur Abhilash Co Operative Hosuing Society LtdKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityBrihanmumbai Municipal Corporation
Permissible FSI1009.47
Proposed, not sanctioned1,009 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHE ANGELE EDUCATIONAL TRUST, 267,SULOCHANA SHETI MARG, SION WEST, MUMBAI- 400 002
Estimated costRs 4.40 cr
Cost incurredRs 4.40 cr
Work done100.0%
BuildingWingEstimatedIncurred
Abhilash Phase IINARs 4.31 crRs 4.31 cr
-NARs 8.80 lakhRs 8.80 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishaarad Architects
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantPranav Bhaskaran & Associates
PartnerRole in project
SANJONA BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA14012619448Dec 2024 → Mar 2027

Reason as filed by the promoterWe are writing to formally request an extension to the project completion timeline. The recent increase in the Floor Space Index (FSI) has led to a substantial expansion of the project's scope. To ensure that we continue to uphold the highest standards of quality and deliverables, additional time is essential. We are committed to completing the project efficiently and effectively, and we believe that this extension will enable us to meet all expectations without compromising on quality. Given the circumstances, we kindly request an extension until 31-03-2027 to complete the project and fulfil

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502735Sanjay P VohraSANJONA BUILDERS05/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Oct 2023

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 1.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 - Abhilash Phase II as on March 2026.pdf12 Aug 2026
Withdrawal Update Form 3File: Form 3 - Abhilash Phase II as on March 2026.pdf12 Aug 2026
Form 5 (FY 2024-2025)File: Form 5- Abhilash Phase II_For FY 2024-25.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1 - Abhilash Phase II as on Dec 2025.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1 - Abhilash Phase II as on Dec 2025.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1 - Abhilash Phase II as on March 2026.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 - Abhilash Phase II as on Sep 2025.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 - Abhilash Phase II as on Dec 2025.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 - Abhilash Phase II as on March 2026.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3 - Abhilash Phase II as on Sep 2025.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3 - Abhilash Phase II as on Dec 2025.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3 - Abhilash Phase II as on March 2026.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1 - Abhilash Phase II as on June 2025.pdf3 Jun 2026
Withdrawal Update Form 2File: Form 2 - Abhilash Phase II as on June 2025.pdf3 Jun 2026
Withdrawal Update Form 3File: Form 3 - Abhilash Phase II as on June 2025.pdf3 Jun 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Abhilash Phase 2 as on Dec 2024.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Abhilash Phase 2 as on Dec 2024.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Abhilash Phase II as on 30th September 2024_compressed.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Abhilash Phase 2 as on 30th Sept 2024.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Abhilash Phase 2 as on 25th June 2024.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Abhilash Phase 2 as on 25th June 2024.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Abhilash Phase 2 as on March 2024.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Abhilash Phase 2 as on March 2024.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Abhilash Phase 2 as on Dec 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Abhilash Phase II as on 31-12-2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhilash Phase 2 Sept 2023 - Form 2.pdf7 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Abhilash Phase II for FY 2022-23.pdf6 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Abhilash Phase II as on 30-09-2023.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 as on September 2023.pdf4 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC- Abhilash Phase II.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Abhilash Phase II as on June 2023.pdf5 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Abhilash Phase II as on Jun 2023.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Abhilash Phase II as on 30-06-2023.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Abhilash Phase II as on March 2023.pdf18 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Abhilash Phase II as on March 2023.pdf18 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Abhilash Phase II as on March 2023.pdf18 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- April 2022.pdf4 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- July 2022.pdf4 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- October 2022.pdf4 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- January 2023.pdf4 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- April 2023.pdf4 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhilash Phase II Dec 2022 - Form 2.pdf21 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Abhilash Phase II as on December 2022.pdf21 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Abhilash Phase -II March 2022.pdf17 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Abhilash Phase -II June 2022.pdf17 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Abhilash Phase -II September 2022.pdf17 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Abhilash Phase II as on March 2022_compressed.pdf17 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Abhilash Phase II as on June 2022_compressed.pdf17 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Abhilash Phase II as on September 2022_compressed.pdf17 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 362.pdf17 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Abhilash Phase-II.pdf1 Feb 2022
Copy of the legal title reportFile: Sanjona_RERA_Title-2-3.pdf14 Jan 2022
Declaration in FORM BFile: Promoter Borm B Abhilash.pdf14 Jan 2022
Proforma of Allotment letterFile: Agreement For Sale_Abhilash_140102022.pdf14 Jan 2022
Proforma of Allotment letterFile: Allotment Letter_Abhilash_14012022.pdf14 Jan 2022
Details of encumbrancesFile: ENCUMBRANCE LETTER.pdf13 Jan 2022
Declaration about Commencement CertificateFile: Circular 32 Format.pdf13 Jan 2022
CERSAI detailsFile: CERSAI -Sanjona -Abhilash Phase II.pdf13 Jan 2022
Building plan approvalFile: Sanjona plan_3-4.pdf5 Jan 2022
Building plan approvalFile: Sanjona plan_5-end.pdf5 Jan 2022
Layout approvalFile: Sanjona plan_1-1.pdf5 Jan 2022
Building plan approvalFile: Sanjona plan_2-2.pdf5 Jan 2022
PAN CardFile: 1 PAN Card.pdf5 Jan 2022
Copy of Layout Approval (in case of layout)File: Sanjona plan_1-1.pdf5 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanjona plan_2-2.pdf5 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanjona plan_3-4.pdf5 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanjona plan_5-end.pdf5 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed.pdf5 Jan 2022

How this compares with Mumbai Suburban

43%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 27 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Abhilash Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur6,700+ in Mumbai Suburban

2 kmAbhilash Phase IICompleted 156Lapsed / revoked 137Other 166Dot size: filed unitsN

Filed coordinates, straight-line distance. 459 registered projects within 2 km.

Builder: SANJONA BUILDERS

SANJONA BUILDERS has 2 registrations on MahaRERA, including ABHILASH and Abhilash Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Abhilash Phase II is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Abhilash Phase II?

The registered promoter entity is SANJONA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Abhilash Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Abhilash Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Abhilash Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Abhilash Phase II?

The professionals named in the filing: Architect: Vishaarad Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Abhilash Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Abhilash Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Abhilash Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.