ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / AARAMBH

Registration lapsed No litigation declared Others project

AARAMBH

By TDM DEVELOPERS LLP

RG-MH-22859 · RERA P99000025157 · Last updated on MahaRERA portal: 24 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 33 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jan 2024Possession promised33 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

AARAMBH is a Others project by TDM DEVELOPERS LLP in Palghar, Maharashtra, registered with MahaRERA as P99000025157 on 19 Mar 2020. Possession was promised by 1 Jan 2024 and is now 33 months past that date.

At a glance

Project

  • NameAARAMBH
  • TypeOthers
  • Location
    • Gut No. 380 / 27
    • Near JP International School
    • Mahim
    • Mahim
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000025157
  • ReraGenie IDRG-MH-22859

Builder

  • NameTDM DEVELOPERS LLP
  • Entity typePartnership
  • PartnersTARUN MANGAL PRASAD SINGH, DHANANJAY RAMDAS MOTE, MITHUN JAGDISH NAIK

Key dates

33 months past promisethis monthRegisteredMar 2020PromisedJan 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Mar 2020
  • Promised completion1 Jan 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AARAMBHNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

AARAMBH: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered1
Open Space30

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area427 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI512.0
Proposed, not sanctioned512 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFALCON CREST, LINK ROAD, NEAR AURA HOTEL, YOGINAGAR, BORIVALI WEST, MUMBAI 400091

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
TDM DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Dec 2024

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: TDM Revised Form B.pdf24 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 and OC.pdf25 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Project Aarambh.pdf25 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest In Other Real Estate Organizations 1.pdf20 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf20 Dec 2024
Details of encumbrances concerned to FinanceFile: Declaration for encumbrances and deviation.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 FY 23-24.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 FY 23-24.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 FY 23-24.pdf12 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: form 4 tdm.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 23-24 Q4.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 23-24 Q3.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 23-24 Q2.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q1 FY 23-24.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 23-24 Q4.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q1 FY 23-24.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 23-24 Q2.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Q 3.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Q 4.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Q2.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Q1 FY 23-24.pdf12 Dec 2024
Deviation Report with respect to Allotment letterFile: Declaration for encumbrances and deviation.pdf12 Dec 2024
Details of encumbrances concerned to LegalFile: Declaration for encumbrances and deviation.pdf12 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Declaration for encumbrances and deviation.pdf12 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23.pdf12 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - Q4 FY 22-23.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 22-23 architects certificate.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 22-23.pdf7 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 FY 22-23.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate SS Wagh.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Engineer Certificate.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Q4 - Sold Unsold Declaration.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Q3.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final Form 5 Signed.pdf31 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1Compressed.pdf30 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2Compressed.pdf30 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration Q1 FY22.pdf30 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration.pdf30 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3Compressed.pdf30 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration RERA.pdf30 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM2A _4TH QUARTER-March 2022.pdf17 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 FY 22-23 TDM Developers.pdf17 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Final Form 5 Signed.pdf17 Nov 2022
Proforma of Agreement for saleFile: 1 Proforma of Agreement.pdf3 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 Engineer Certificate.pdf30 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Form 2 Final.pdf30 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 Form 2 Final.pdf30 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A _4TH QUARTER-March 2022.pdf30 Jun 2022
Disclosure of sold/ booked inventoryFile: Q4 Sold Unsold Declaration.pdf30 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FINAL architects certificate_for rera of completion of work Dec 2021.pdf31 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A _3rd QUARTER - DECEMBER_2021.pdf31 Mar 2022
Disclosure of sold/ booked inventoryFile: FINAL DISCOLSURE OF SOLD UNSOLD RERA - Dec 21.pdf31 Mar 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A _2ND QUARTER-2021 (1).pdf31 Dec 2021
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD UNSOLD RERA Sept.pdf31 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report_200227074854_For_Debtor_Based_Search_31_12_2021_18_20_45_010.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY CHECK_FORM2A _1st QUARTER.pdf30 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY CHECK_FORM2A _2ND QUARTER.pdf30 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY CHECK_FORM2A _3rd QUARTER.pdf30 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Q1 FY 2021-22.pdf30 Sep 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Disclosure FY 2021-22 Q1.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 TDM FY 20-21.pdf30 Sep 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf3 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QC Certificate.pdf28 Jun 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration.pdf28 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Signed RERA Audit Report.pdf6 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY CHECK_FORM2A _1st QUARTER.pdf4 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY CHECK_FORM2A _2ND QUARTER.pdf4 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY CHECK_FORM2A _3rd QUARTER.pdf4 Mar 2021
Declaration in FORM BFile: Form B and Authorisation.pdf7 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate.pdf7 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 TDM Registration.pdf7 Mar 2020
OtherFile: authorisation in one name.pdf7 Mar 2020
OtherFile: Certificate of LLP Incorporation.PDF7 Mar 2020
Copy of the legal title reportFile: Title and Search 2.pdf5 Mar 2020
Details of encumbrancesFile: encumbrance certificate.pdf5 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf5 Mar 2020

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARAMBH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near JP International School,Mahim3,200+ in Palghar

2 kmAARAMBHCompleted 22Lapsed / revoked 23Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: TDM DEVELOPERS LLP

TDM DEVELOPERS LLP has 1 registration on MahaRERA, including AARAMBH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that AARAMBH shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AARAMBH is delayed beyond 1 Jan 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARAMBH?

The registered promoter entity is TDM DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARAMBH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARAMBH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in AARAMBH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARAMBH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARAMBH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.