Home / Browse projects / Satara, Maharashtra / Aapla Ghar Wai Phase I

Completed No litigation declared Residential / Group Housing project

Aapla Ghar Wai Phase I

By Maple Ellora Developers

RG-MH-11305 · RERA P52700007852 · Last updated on MahaRERA portal: 7 Jul 2026

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA
  • Completion date moved by 72 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedregistration recorded completed
18 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 98%
9 of 79Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

Aapla Ghar Wai Phase I is a Residential / Group Housing project by Maple Ellora Developers in Satara, Maharashtra, registered with MahaRERA as P52700007852 on 18 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2029. The completion date has moved by 72 months from the original filing. 70 of the 79 units on this registration are recorded sold or booked, and 18 of 44 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NameAapla Ghar Wai Phase I
  • TypeResidential / Group Housing
  • Location
    • wai
    • Songirwadi (Rural) (CT)
    • Satara
    • 412803
  • Pincode412803
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700007852
  • ReraGenie IDRG-MH-11305

Builder

  • NameMaple Ellora Developers
  • Entity typePartnership

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2029Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 30 Dec 2023)
  • Buildings4 building records
  • Documents filed121 files

Current status

89%70 of 79 units booked
96.3%Work done, per cost certificate

Figures as on 7 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ProposedNA00000
B4NA6544044
ProposedNA00000
B5NA6535035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 7 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 98%.

Proposed0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B499%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises96%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Proposed0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B5100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34
BuildingClosed/CoveredTotal
B41818
B51616

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,315 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2025
LandownerVillageDistrict
Bhosale Buttepatil AssociatesPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityTown Planning Branch Satara
Permissible FSI8089.73
Proposed, not sanctioned5,490 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLaukik Apartment Fergusson College Road, Bhandrakar Road, Pune 411004
Estimated costRs 8.76 cr
Cost incurredRs 8.44 cr
Work done96.35%
BuildingWingEstimatedIncurred
B4NARs 3.79 crRs 3.75 cr
B5NARs 3.21 crRs 3.21 cr
-NARs 1.76 crRs 1.48 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Hardikar and Assocites
ArchitectInsignis Architect
EngineerRajesh Chaudhari
EngineerMANGESH DESHMUKH
Chartered AccountantAgrawal Oswal And Associates
Chartered AccountantShweta Agrawal
PartnerRole in project
Maple Ellora Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700017980Dec 2023 → Dec 2024

Reason as filed by the promoterDue to covid and unavailability of material.

EXT52700024872Dec 2023 → Dec 2029

Reason as filed by the promoterDue to changes in UDCPR rules and regulations,

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC005000000011130SAVITA KISHOR SHINDE AND KISHOR GANPAT SHINDEMAPLE ELLORA DEVELOPERS08/03/2018
CC005000000033549VINAYAK ARVIND SHIRKEM/S. MAPLE ELLORA DEVELOPERS THROUGH ITS PARTNER MR. SACHIN ASHOK AGARWAL19/12/2019
CC005000000095952Leelabai PawarMaple ellora developers31/08/2021
CC12504633Amit SarodeMaple Ellora Developers26/12/2025
CC12504645Aniket KondeMaple Ellora Developers27/12/2025
CC12601449Harshal ShindeMaple Ellora Developers15/03/2026
CC12601589Vikas JamdarMaple Ellora Developers22/03/2026
CC12601920Rajashree BandalMaple Ellora Developers01/04/2026
CC12602170Sheetal KanunjeMaple Ellora Developers13/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Feb 2025

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5-25-26.pdf7 Jul 2026
Form 2A (FY 2025-2026)File: Apla Ghar Wai Form 2A.pdf21 Apr 2026
Withdrawal Update Form 1File: Apla Ghar Wai Architect Cert Q4.pdf20 Apr 2026
Withdrawal Update Form 2File: Apla Ghar Wai Engineer Cert Q4.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3 Q4 WAI.pdf20 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Wai Q3.pdf17 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate Wai.pdf17 Jan 2026
Withdrawal Update Form 3File: FORM 3 Q 3 APLA GHAR WAI.pdf17 Jan 2026
Withdrawal Update Form 1File: ARCHITECT CERTF AAPL GHAR WAI Q2.pdf4 Nov 2025
Withdrawal Update Form 2File: Eng Cerrt Aapla Ghar Wai 2.pdf4 Nov 2025
Withdrawal Update Form 3File: FORM 3-Q2-FY 2025-26.pdf4 Nov 2025
Withdrawal Update Form 1File: Arch certf wai.pdf25 Jul 2025
Withdrawal Update Form 2File: Engg Certificate Wai 30 june 25.pdf25 Jul 2025
Withdrawal Update Form 3File: FORM 3-Q1-25-26-wai.pdf25 Jul 2025
Form 5 (FY 2017-2018)File: 2017-18.pdf24 Jul 2025
Form 5 (FY 2022-2023)File: Wai 2022-23.pdf24 Jul 2025
Form 5 (FY 2024-2025)File: Wai 2024-25.pdf24 Jul 2025
Form 5 (FY 2018-2019)File: 2018-19.pdf23 Jul 2025
Form 5 (FY 2019-2020)File: 2019-20.pdf23 Jul 2025
Form 5 (FY 2020-2021)File: 2020-21.pdf23 Jul 2025
Form 5 (FY 2021-2022)File: 2021-22.pdf23 Jul 2025
Form 5 (FY 2023-2024)File: 2023-24.pdf23 Jul 2025
Form 2A (FY 2017-2018)File: Form 2A (28).pdf22 Jul 2025
Form 2A (FY 2018-2019)File: Form 2A (29).pdf22 Jul 2025
Form 2A (FY 2019-2020)File: Form 2A (30).pdf22 Jul 2025
Form 2A (FY 2020-2021)File: Form 2A (31).pdf22 Jul 2025
Form 2A (FY 2022-2023)File: Form 2A (33).pdf22 Jul 2025
Form 2A (FY 2021-2022)File: Form 2A (32).pdf22 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A (34).pdf22 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A (35).pdf22 Jul 2025
Form 1File: Architect certificate1.pdf21 Jul 2025
Form 2File: Engineer Certificate dec 24.pdf21 Jul 2025
Form 3File: Form 3 as on 31-12-2024.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf21 Jul 2025
PAN CardFile: MED-PAN CARD.pdf20 Feb 2025
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf20 Feb 2025
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf20 Feb 2025
Proforma of Agreement for saleFile: ATS.pdf20 Feb 2025
Declaration about Commencement CertificateFile: 00 Declaration about commencement Final.pdf19 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion wai B5.pdf17 Feb 2025
Declaration about Commencement CertificateFile: 00 Declaration about commencement 1.pdf17 Feb 2025
Certificates of CA (Form 3)File: Form 3 as on 31-12-2024.pdf15 Feb 2025
Layout approvalFile: 1 scan2238.pdf13 Feb 2025
Layout approvalFile: 1-5 scan2239.pdf13 Feb 2025
Building plan approvalFile: 2-5 scan2240.pdf13 Feb 2025
Building plan approvalFile: 3-5 scan2241.pdf13 Feb 2025
Building plan approvalFile: 4-5 scan2242.pdf13 Feb 2025
Building plan approvalFile: 5-5 scan2243.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: 1-5 scan2239.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: 1 scan2238.pdf13 Feb 2025
Declaration in FORM BFile: FORMB wai 2025 Final.pdf13 Feb 2025
Building Plan Approval (IOD)File: 2-5 scan2240.pdf13 Feb 2025
Building Plan Approval (IOD)File: 3-5 scan2241.pdf13 Feb 2025
Building Plan Approval (IOD)File: 4-5 scan2242.pdf13 Feb 2025
Building Plan Approval (IOD)File: 5-5 scan2243.pdf13 Feb 2025
Declaration about Commencement CertificateFile: Declaration About Commencement NEW.pdf13 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Navin sir.pdf13 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest sachin sir.pdf13 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate1.pdf12 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate dec 24 Different format.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf12 Feb 2025
Declaration about Commencement CertificateFile: Declaration About Commencement NEW.pdf12 Feb 2025
CERSAI detailsFile: CERSAI DECLARATION.pdf12 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Separate Bank Account.pdf12 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Navin sir.pdf12 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest sachin sir.pdf12 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Form 2A 31-12-2024.pdf12 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5new.pdf19 Dec 2024
Declaration in FORM BFile: Form BWAI sept2024.pdf23 Oct 2024
Certificates of CA (Form 3)File: FORM 3.pdf22 Oct 2024
Certificates of CA (Form 5)File: FORM 5.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold wai.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Form 2A.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form Wai sept 2024.pdf18 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate sept 2024.pdf18 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate MED.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate - maple elloraa.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD LIST.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance Maple Ellora Dev.pdf1 Jun 2024

How this compares with Satara

89%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one moved by 72 months
35%of Satara registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep Aapla Ghar Wai Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near wai1,100+ in Satara

2 kmAapla Ghar Wai Phase ICompleted 4Lapsed / revoked 7Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: Maple Ellora Developers

Maple Ellora Developers has 1 registration on MahaRERA, including Aapla Ghar Wai Phase I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if Aapla Ghar Wai Phase I is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aapla Ghar Wai Phase I?

The registered promoter entity is Maple Ellora Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aapla Ghar Wai Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Aapla Ghar Wai Phase I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Aapla Ghar Wai Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aapla Ghar Wai Phase I?

The professionals named in the filing: Architect: Sandeep Hardikar and Assocites; Architect: Insignis Architect; Engineer: Rajesh Chaudhari; Engineer: MANGESH DESHMUKH; Chartered Accountant: Agrawal Oswal And Associates; Chartered Accountant: Shweta Agrawal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aapla Ghar Wai Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aapla Ghar Wai Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aapla Ghar Wai Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.