ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / 7 VERVE

Registered No litigation declared Residential / Group Housing project

7 VERVE

By Maruti Developers

RG-MH-80705 · RERA P52100054733 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
12 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 95%
0 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

7 VERVE is a Residential / Group Housing project by Maruti Developers in Pune, Maharashtra, registered with MahaRERA as P52100054733 on 6 Feb 2024. Possession is promised by 31 Dec 2028. 112 of the 112 units on this registration are recorded sold or booked, and 12 of 44 construction stages are filed complete.

At a glance

Project

  • Name7 VERVE
  • TypeResidential / Group Housing
  • Location
    • -
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054733
  • ReraGenie IDRG-MH-80705

Builder

  • NameMaruti Developers
  • Entity typePartnership
  • PartnersAmit Sunil Israni, Sunil Radhakrishan Israni
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed85 files

Current status

100%112 of 112 units booked
93.7%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA8728028
Building BNA8728028
Building CNA8728028
Building DNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 95%.

Building A65%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Building B65%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Building C65%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Building D65%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed230

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots230
Closed/Covered230
BuildingClosed/CoveredTotal
Building A5858
Building B5757
Building C5757
Building D5858

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,382 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI10655.58
Proposed, not sanctioned10,368 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Thermax Chowk, Chinchwad, Pune 411019
Estimated costRs 29.74 cr
Cost incurredRs 27.86 cr
Work done93.67%
BuildingWingEstimatedIncurred
Building ANARs 6.61 crRs 6.28 cr
Building BNARs 6.61 crRs 6.28 cr
Building CNARs 6.61 crRs 6.28 cr
Building DNARs 6.61 crRs 6.21 cr
-NARs 3.30 crRs 2.81 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR. AMIT EKAMBE ( SANS ARCHITECTS)
EngineerALOK KULKARNI SETU ENGINEERING
EngineerHanumant Nikalje
Chartered AccountantSCT & CO
Chartered AccountantMilani Gattani & Co.
PartnerRole in project
Maruti Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf18 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf18 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf18 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf23 Dec 2025
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf23 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25..pdf22 Dec 2025
Withdrawal Update Form 1File: Form 1 Q2.pdf30 Oct 2025
Withdrawal Update Form 2File: Form 2 Q2.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3 Q2.pdf30 Oct 2025
Withdrawal Update Form 1File: Form 1 Q1.pdf28 Oct 2025
Withdrawal Update Form 1File: Form 1 Q2.pdf28 Oct 2025
Withdrawal Update Form 2File: Form 2 Q1.pdf28 Oct 2025
Withdrawal Update Form 2File: Form 2 Q2.pdf28 Oct 2025
Withdrawal Update Form 3File: Form 3 Q1.pdf28 Oct 2025
Withdrawal Update Form 3File: Form 3 Q2.pdf28 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf26 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Verve Architect_compressed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 7Verve_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Verve Engineer_compressed.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Promoters Disclosure_compressed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Verve Form 1 Architect Certificate_compressed.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 7 Verve_compressed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Verve Form 2 Engineer Certficate_compressed.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure_compressed.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 -23-24-MARUTI-7 VERVE.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosures_compressed.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Jul 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf9 Jul 2024
Layout approvalFile: Revised -New Layout Plan - 1 of 2_compressed.pdf8 Jul 2024
Building plan approvalFile: Revised -New Layout Plan - 2 of 2_compressed.pdf8 Jul 2024
Copy of Layout Approval (in case of layout)File: Revised -New Layout Plan - 1 of 2_compressed.pdf8 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised -New Layout Plan - 2 of 2_compressed.pdf8 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised - New -CC.pdf8 Jul 2024
Building plan approvalFile: 1 of 2_compressed.pdf3 Jul 2024
Building plan approvalFile: 1 of 2_compressed.pdf3 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 of 2_compressed.pdf3 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 of 2_compressed.pdf3 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 of 2_compressed.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 7 Verve_compressed.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 7 Verve_compressed.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 7 VERVE.pdf20 Apr 2024
Details of encumbrances concerned to FinanceFile: 7 Verve Encumbrance combined.pdf31 Jan 2024
Details of encumbrances concerned to LegalFile: 7 Verve Encumbrance combined.pdf31 Jan 2024
Other - TechnicalFile: CC Confirmation from PCMC.pdf31 Jan 2024
CERSAI detailsFile: CERSAI Declaration.pdf29 Jan 2024
Other - TechnicalFile: Annexure A - Order 50 Declaration.pdf23 Jan 2024
Declaration in FORM BFile: FORM B Promotor New compressed.pdf22 Jan 2024
Proforma of Agreement for saleFile: Agreement To Sale compressed.pdf22 Jan 2024
Proforma of Allotment letterFile: Allotment Letter New compressed.pdf22 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter.pdf22 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviatian of Agreement To Sale compressed.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate compressed.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate compressed.pdf20 Jan 2024
Copy of the legal title reportFile: Legal Title Report 1-compressed.pdf16 Jan 2024
Copy of the legal title reportFile: Legal Title Report - 2 compressed.pdf16 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf16 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf16 Jan 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf16 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest ASI.pdf16 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest SRI.pdf16 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account.pdf16 Jan 2024
Layout approvalFile: 1-5.pdf12 Jan 2024
Building plan approvalFile: 2-5.pdf12 Jan 2024
Building plan approvalFile: 3-5.pdf12 Jan 2024
Building plan approvalFile: 4-5.pdf12 Jan 2024
Building plan approvalFile: 5-5.pdf12 Jan 2024
PAN CardFile: Maruti Developers PAN.pdf12 Jan 2024
Copy of Layout Approval (in case of layout)File: 1-5.pdf12 Jan 2024

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 7 VERVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

2 km7 VERVECompleted 108Lapsed / revoked 43Other 94Dot size: filed unitsN

Filed coordinates, straight-line distance. 245 registered projects within 2 km.

Builder: Maruti Developers

Maruti Developers has 3 registrations on MahaRERA, including 7 VERVE and SAI MAJESTIC PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 7 VERVE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 7 VERVE?

The registered promoter entity is Maruti Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 7 VERVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 7 VERVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 7 VERVE?

The professionals named in the filing: Architect: AR. AMIT EKAMBE ( SANS ARCHITECTS); Engineer: ALOK KULKARNI SETU ENGINEERING; Engineer: Hanumant Nikalje; Chartered Accountant: SCT & CO; Chartered Accountant: Milani Gattani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 7 VERVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 7 VERVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 7 VERVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.