Home / Browse projects / Pune, Maharashtra / 41 EVOKE BLDG C
41 EVOKE BLDG C
RG-MH-22217 · RERA P52100032580 · Last updated on MahaRERA portal: 4 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
41 EVOKE BLDG C is a Commercial project by KRISALA ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100032580 on 14 Jan 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 52 of the 97 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- Name41 EVOKE BLDG C
- TypeCommercial
- Location
- KOHALI GAS
- RAVET
- Haveli
- Pune
- 412101
- Pincode412101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100032580
- ReraGenie IDRG-MH-22217
Builder
- NameKRISALA ASSOCIATES
- Entity typePartnership
- PartnersSAGAR OMPRAKASH AGARWAL, NITIN SURENDRA MITTAL, TULSIDAS RATANSHIBHAI PATEL, RAKESH PHULCHAND SONIGARA, BHUSHAN RAMKARAN GUPTA, KAMAL RAMKARAN GUPTA, AADESH RAKESH SONIGARA
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Jan 2022
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed98 files
Current status
Figures as on 4 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C BUILDING | NA | 14 | 12 | 0 | 97 | 97 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.
C BUILDING: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 4 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 100% |
Land and ownership10
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SMITA PRAMOD DUDHALE | Pimpri Chinchawad (M Corp.) | Pune |
| PRAMILA DHANANJAY JADHAV | Pimpri Chinchawad (M Corp.) | Pune |
| KIRAN DHANANJAY JADHAV | Pune (M Corp.) | Pune |
| KALYANI SAGAR BHILARE | Pimpri Chinchawad (M Corp.) | Pune |
| DILIP TULSHIDAS KAWADE | Ravet | Pune |
| DATTATRAY DILIP KAWADE | Ravet | Pune |
| ANUP DLILP KAWADE | Ravet | Pune |
| SAGAR DILIP KAWADE | Ravet | Pune |
| SURYAKANT NAGANATH SURYAWANSHI | Latur (M Cl) | Latur |
| Hiraman Dattatray Kalbhor | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C BUILDING | NA | Rs 7.29 cr | Rs 4.46 cr |
| - | NA | Rs 1.82 cr | Rs 1.12 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CUBIX ARCHITECTS ASSOCIATES |
| Architect | Hrishikesh Kulkarni |
| Engineer | PANKAJ VISHNU KOLATE |
| Engineer | Mayur Rokde |
| Chartered Accountant | Agarwal Sarawgi and Associate |
| Chartered Accountant | Patel & Sharma |
| Partner | Role in project |
|---|---|
| KRISALA ASSOCIATES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project is facing delays due to a severe labour shortage, resulting in the unavailability of skilled workers. Additionally, the contractor's performance has been adversely affected, leading to inefficiencies and compromised work quality. Given these challenges, requesting an extension becomes imperative to ensure the project's successful completion while maintaining the desired standards and mitigating the impact of unforeseen workforce constraints
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 40/2022/2022 | District Court Pune | Pending |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000167590 | Hiraman Dattatray Kalbhor | M/s. Krishala Associates Through its Partner and Authorized signatory Mr. Aakash Omprakash Agarwal | 16/09/2022 |
| CC12504275 | Kishorkumar Narhari Kadam | KRISALA ASSOCIATES | 03/12/2025 |
| CC12504357 | Kishor Narhari Kadam | KRISALA ASSOCIATES | 08/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 EVOKE C.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - 41 Evoke C.pdf | 4 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A_11zon.pdf | 29 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2_11zon.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: form 1 evoke c.pdf | 14 Oct 2025 |
| Withdrawal Update Form 2File: form 2 evoke c June 2025.pdf | 14 Oct 2025 |
| Withdrawal Update Form 3File: form 3 evoke c_11zon.pdf | 14 Oct 2025 |
| Form 5 (FY 2024-2025)File: Final signed Form 5.pdf | 7 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 evoke c.pdf | 21 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 evoke c_11zon.pdf | 21 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 evoke c June 2025.pdf | 21 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory evoke c June 2025.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 evoke C.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Evoke C Mar 25.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EVOKE C 31032025.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: inventory evoke c.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EVOKE FORM 3_compressed.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EVOKE C FORM 2 dec 24 (1).pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: EVOKE C SOLD UNSOLD dec24.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 evoke C 31-12-24.pdf | 29 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A - 41 EVOKE C.pdf | 16 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B - EVOKE C.pdf | 16 Dec 2024 |
| Declaration in FORM BFile: FORM B - 41 EVOKE C_compressed.pdf | 11 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EVOKE C 30092024 2 2.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EVOKE C 30092024.pdf | 23 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY EVOKE C 30092024.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 EVOKE C 30092024.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 EVOKE C 2023-24.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 30062024.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 30062024.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Evoke C 30-06-24.pdf | 29 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Evoke C 30-06-24.pdf | 27 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 41 Evoke C Form 3 Krisala Associates C Bldg.pdf | 27 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 EVOKE C 30062024.pdf | 25 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 41 Evoke C Wing -Mar 24.pdf | 20 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: 3Evoke C.pdf | 12 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Evoke C _Apr 24.pdf | 8 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 41 Evoke C Building-2021-22.pdf | 6 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C Bldg Evoke_compressed.pdf | 28 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form_2A_Evoke_C_March_23-Ok.pdf | 22 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 09 31-03-2024_0001.pdf | 18 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 30-06-2023_0001.pdf | 18 May 2024 |
| Details of encumbrancesFile: 41 EVOKE LEGAL C.pdf | 16 May 2024 |
| Disclosure of sold/ booked inventoryFile: 01 31-03-2022.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: 02 30-06-2022.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: 03 31-12-2022.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: 04 30-09-2022.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: 05 31-03-2023.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: 06 30-06-2023.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: 07 30-09-2023.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: 08 31-12-2023.pdf | 14 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 41 Evoke C bldg 22-23.pdf | 14 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 31-03-2022_0001.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 30-06-2022_0001.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 30-09-2022_0001.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 31-12-2022_0001.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 31-03-2023_0001.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 07 30-09-2023.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 08 31-12-2023_0001.pdf | 9 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 RERA Form 3 41 Evoke C Bldg 31032022.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 RERA Form 3 41 Evoke C Bldg 30062022.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 RERA Form 3 41 Evoke C Bldg 30092022.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 RERA Form 3 41 Evoke C Bldg 31122022.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 RERA Form 3 41 Evoke C Bldg 31032023.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062023.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092023.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122023.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 31-03-2022_0001.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 30-06-2022_0001.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 30-09-2022_0001.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 31-12-2022_0001.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05 31-03-2023_0001.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06 30-06-2023_0001.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 07 30-09-2023_0001.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 08 31-12-2023_0001.pdf | 22 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 41 EVOKE C BUILDING F Y 21-22.pdf | 27 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form_2A_Evoke_C.pdf | 25 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep 41 EVOKE BLDG C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAVET13,700+ in Pune
Filed coordinates, straight-line distance. 89 registered projects within 2 km.
Godrej Park Greens
Godrej Skyline Developers Limited
FOREST GROVE AT GODREJ PARK GREENS
Godrej Skyline Developers Limited
Om Mangalam Samruddhi
NDG Homes LLP
PCMC EWS KIWALE
Pimpri Chinchwad Municipal Corporation
Godrej Nurture
Godrej Skyline Developers Limited
My Home Sanctuary Phase I
MAMURDI DEVELOPERS LLP
Builder: KRISALA ASSOCIATES
KRISALA ASSOCIATES has 2 registrations on MahaRERA, including 41 EVOKE and 41 EVOKE BLDG C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that 41 EVOKE BLDG C shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if 41 EVOKE BLDG C is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 41 EVOKE BLDG C?
The registered promoter entity is KRISALA ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 41 EVOKE BLDG C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against 41 EVOKE BLDG C?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for 41 EVOKE BLDG C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 41 EVOKE BLDG C?
The professionals named in the filing: Architect: CUBIX ARCHITECTS ASSOCIATES; Architect: Hrishikesh Kulkarni; Engineer: PANKAJ VISHNU KOLATE; Engineer: Mayur Rokde; Chartered Accountant: Agarwal Sarawgi and Associate; Chartered Accountant: Patel & Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 41 EVOKE BLDG C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback