Home / Browse projects / Aurangabad, Maharashtra / 36 Greens

Registered No litigation declared Residential / Group Housing project

36 Greens

By A.M.PATEL INFRA PVT LTD

RG-MH-21848 · RERA P51500050638 · Last updated on MahaRERA portal: 8 Jul 2026

Source: official MahaRERA filing

Red flags

  • Rs 20.00 crore secured on the land, in favour of STATE BANK OF INDIA
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Nov 2027Possession promisedno revision filed
0 of 77Construction stages doneacross 7 buildings; furthest along: Excavation, 90%
26 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

36 Greens is a Residential / Group Housing project by A.M.PATEL INFRA PVT LTD in Aurangabad, Maharashtra, registered with MahaRERA as P51500050638 on 21 Apr 2023. Possession is promised by 30 Nov 2027. 9 of the 35 units on this registration are recorded sold or booked, and 0 of 77 construction stages are filed complete.

At a glance

Project

  • Name36 Greens
  • TypeResidential / Group Housing
  • Location
    • PAITHAN ROAD
    • NEAR 30 GREENS
    • Golwadi
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500050638
  • ReraGenie IDRG-MH-21848

Builder

  • NameA.M.PATEL INFRA PVT LTD
  • Entity typeCompany
  • Managing DirectorBHAVEN BHASKARBHAI AMIN
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredApr 2023PromisedNov 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion30 Nov 2027
  • Revised completionNone
  • Buildings7 building records
  • Documents filed129 files

Current status

26%9 of 35 units booked
14.3%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TYPE BUILDING BUNG NO 1,2,3,4,5,6NA44606
B TYPE BUILDING 7,8,9,10,11,12NA44606
C TYPE BUILDING BUNG 13 14 15 16NA44404
D TYPE BUILDING BUNG NO 20NA44101
E TYPE BUILDING BUNG NO 17,18NA44202
F TYPE BUILDING BUNG NO 21,22,23,24,25,26NA44606
G TYPE BUILDING BUNG NO 27,28,29,30,31,32,33,34,35,36NA4410010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Excavation, at 90%.

A TYPE BUILDING BUNG NO 1,2,3,4,5,630%
ActivityProgress
Excavation50%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor50%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B TYPE BUILDING 7,8,9,10,11,1244%
ActivityProgress
Excavation90%
Basement (if any)90%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C TYPE BUILDING BUNG 13 14 15 160%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D TYPE BUILDING BUNG NO 200%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E TYPE BUILDING BUNG NO 17,1838%
ActivityProgress
Excavation70%
Basement (if any)80%
Podiums (if any)0%
Plinth70%
Stilt Floor70%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F TYPE BUILDING BUNG NO 21,22,23,24,25,2637%
ActivityProgress
Excavation70%
Basement (if any)70%
Podiums (if any)0%
Plinth70%
Stilt Floor70%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G TYPE BUILDING BUNG NO 27,28,29,30,31,32,33,34,35,3625%
ActivityProgress
Excavation50%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor50%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed177

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots177
Closed/Covered177
BuildingClosed/CoveredTotal
A TYPE BUILDING BUNG NO 1,2,3,4,5,63636
B TYPE BUILDING 7,8,9,10,11,123636
C TYPE BUILDING BUNG 13 14 15 161616
D TYPE BUILDING BUNG NO 2055
E TYPE BUILDING BUNG NO 17,1888
F TYPE BUILDING BUNG NO 21,22,23,24,25,263636
G TYPE BUILDING BUNG NO 27,28,29,30,31,32,33,34,35,364040

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area16,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSTATE BANK OF INDIA
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on8 Jul 2026

Approvals and building plan

Sanctioning authorityCIDCO CHH SAMBHAJI NAGAR
Permissible FSI14330.68
Proposed, not sanctioned14,235 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGARKHEDA ROAD AURANGABAD
Estimated costRs 56.84 cr
Cost incurredRs 8.11 cr
Work done14.26%
BuildingWingEstimatedIncurred
G TYPE BUILDING BUNG NO 27,28,29,30,31,32,33,34,35,36NARs 15.47 crRs 1.60 cr
A TYPE BUILDING BUNG NO 1,2,3,4,5,6NARs 9.39 crRs 1.09 cr
B TYPE BUILDING 7,8,9,10,11,12NARs 9.39 crRs 2.23 cr
F TYPE BUILDING BUNG NO 21,22,23,24,25,26NARs 9.26 crRs 2.61 cr
C TYPE BUILDING BUNG 13 14 15 16NARs 6.26 cr-
E TYPE BUILDING BUNG NO 17,18NARs 3.11 crRs 29.21 lakh
-NARs 2.41 crRs 1.27 lakh
D TYPE BUILDING BUNG NO 20NARs 1.55 crRs 27.63 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR MANOJ KALA
ArchitectMR SHOURYA PATEL
ArchitectMANOJ KALA
EngineerMR SUJIT PATARE
EngineerSAINATH SUKHDEV MHASKE
Chartered AccountantMR ABHIJEET PATIL
Chartered AccountantABHIJEET PATIL
Chartered AccountantV R AMIN AND ASSOCIATES
PartnerRole in project
A.M.PATEL INFRA PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2027

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q1 26 27.pdf8 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q1 26 27.pdf8 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q1 26 27.pdf8 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q1 26 27.pdf8 Jul 2026
Withdrawal Update Form 3File: June 2026.pdf8 Jul 2026
Withdrawal Update Form 3File: June 2026.pdf8 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q1 26 27.pdf7 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q1 26 27.pdf7 Jul 2026
Withdrawal Update Form 3File: June 2026.pdf7 Jul 2026
Withdrawal Update Form 1File: FORM 1Q3 25 26.pdf4 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q4 25 26.pdf4 Jul 2026
Withdrawal Update Form 3File: March 2026.pdf4 Jul 2026
Form 2A (FY 2023-2024)File: 2023.pdf4 Jul 2026
Form 2A (FY 2024-2025)File: 2024.pdf4 Jul 2026
Form 2A (FY 2025-2026)File: 2025.pdf4 Jul 2026
Form 2A (FY 2026-2027)File: 2026.pdf4 Jul 2026
Form 1File: FORM 1 Q1 23 24.pdf3 Jul 2026
Form 2File: FORM 2 Q1 23 24.pdf3 Jul 2026
Form 3File: FORM 3 RERA CERTIFICATE JUN 23.pdf3 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q1 23.pdf3 Jul 2026
Form 1File: FORM 1 Q1 23 24.pdf3 Jul 2026
Form 2File: FORM 2 Q1 23 24.pdf3 Jul 2026
Form 3File: FORM 3 RERA CERTIFICATE JUN 23.pdf3 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q1 23.pdf3 Jul 2026
Form 1File: FORM 1 Q2 23 24.pdf3 Jul 2026
Form 2File: FORM 2 Q2 23 24.pdf3 Jul 2026
Form 3File: FORM 3 RERA CERTIFICATE SEP 23.pdf3 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q2 23.pdf3 Jul 2026
Form 1File: FORM 1 Q3 23 24.pdf3 Jul 2026
Form 2File: FORM 2 Q3 23 24.pdf3 Jul 2026
Form 3File: FORM 3 RERA CERTIFICATE DEC 23.pdf3 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q3 23.pdf3 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q4 23.pdf3 Jul 2026
Form 1File: FORM 1 Q4 23 24.pdf3 Jul 2026
Form 2File: FORM 2 Q4 23 24.pdf3 Jul 2026
Form 3File: FORM 3 RERA CERTIFICATE MARCH 24.pdf3 Jul 2026
Form 1File: FORM 1 Q2 24 25.pdf3 Jul 2026
Form 2File: FORM 2 Q2 24 25.pdf3 Jul 2026
Form 3File: FORM 3 RERA CERTIFICATE JUN 24.pdf3 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q2 24.pdf3 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q3 24.pdf3 Jul 2026
Form 1File: FORM 1 Q3 24 25.pdf3 Jul 2026
Form 2File: FORM 2 Q3 24 25.pdf3 Jul 2026
Form 3File: FORM 3 RERA CERTIFICATE DEC 24.pdf3 Jul 2026
Form 1File: FORM 1 Q4 24 25.pdf3 Jul 2026
Form 2File: FORM 2 Q4 24 25.pdf3 Jul 2026
Form 3File: FORM 3 RERA CERTIFICATE MARCH 25.pdf3 Jul 2026
Disclosure of Sold and Booked InventoryFile: Q4 24.pdf3 Jul 2026
Withdrawal Update Form 1File: FORM 1Q3 25 26.pdf3 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q3 25 26.pdf3 Jul 2026
Withdrawal Update Form 3File: FORM 3 RERA CERTIFICATE DEC 25.pdf3 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q1 23 24.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q2 23 24.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q3 23 24.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q4 23 24.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q1 24 25.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q2 24 25.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q3 24 25.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q4 24 25.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q1 25 26.pdf2 Jul 2026
Withdrawal Update Form 1File: FORM 1 Q2 25 26.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q1 23 24.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q2 23 24.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q2 23 24.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q4 23 24.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q2 24 25.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q2 24 25.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q3 24 25.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q4 24 25.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q1 25 26.pdf2 Jul 2026
Withdrawal Update Form 2File: FORM 2 Q2 25 26.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3 RERA CERTIFICATE JUN 23.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3 RERA CERTIFICATE SEP 23.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3 RERA CERTIFICATE DEC 23.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3 RERA CERTIFICATE MARCH 24.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3 RERA CERTIFICATE JUN 24.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3 RERA CERTIFICATE SEP 24.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3 RERA CERTIFICATE DEC 24.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3 RERA CERTIFICATE MARCH 25.pdf2 Jul 2026
Withdrawal Update Form 3File: FORM 3 RERA CERTIFICATE JUN 25.pdf2 Jul 2026

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
180 and 51 greensgut no 39 satara parisar aurangabad--CompletedJan 2024Late, May 2025
180 and 51 GreensP51500004770Satara Aurangabad, Aurangabad237Aug 2017Certificate SignedJan 2024Registered original: Jul 2023Late, May 2025
108 Green Heights and 50 GreensGut no 41 Opposite Kamal Nayan Bajaj Hospital Beed By pass Road Village Satara Tq and Dist Aurangabad108-CompletedJan 2014Late, Jan 2015
30 Greens30 Greens gut no 33 and 35 Golwadi Paithan Road Aurangabad--CompletedOct 2012Late, Dec 2012

How this compares with Aurangabad

26%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep 36 Greens on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR 30 GREENS1,400+ in Aurangabad

2 km36 GreensCompleted 12Lapsed / revoked 8Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: A.M.PATEL INFRA PVT LTD

A.M.PATEL INFRA PVT LTD has 2 registrations on MahaRERA, including 180 and 51 Greens and 36 Greens. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if 36 Greens is delayed beyond 30 Nov 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 36 Greens?

The registered promoter entity is A.M.PATEL INFRA PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 36 Greens?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 36 Greens?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 36 Greens?

The professionals named in the filing: Architect: MR MANOJ KALA; Architect: MR SHOURYA PATEL; Architect: MANOJ KALA; Engineer: MR SUJIT PATARE; Engineer: SAINATH SUKHDEV MHASKE; Chartered Accountant: MR ABHIJEET PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 36 Greens?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 36 Greens. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 36 Greens to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.