Completed No litigation declared Residential / Group Housing project

27 East

By Rashi Developers

RG-MH-28976 · RERA P51700028466 · Last updated on MahaRERA portal: 19 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

27 East is a Residential / Group Housing project by Rashi Developers in Thane, Maharashtra, registered with MahaRERA as P51700028466 on 2 Mar 2021. The registration is recorded completed; possession was promised by 30 Jun 2025.

At a glance

Project

  • Name27 East
  • TypeResidential / Group Housing
  • Location
    • Manpada Road
    • Sagaon
    • Kalyan
    • Thane
    • 421204
  • Pincode421204
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700028466
  • ReraGenie IDRG-MH-28976

Builder

  • NameRashi Developers
  • Entity typePartnership
  • PartnersVivek Chandraprakash Singhania, Ashish Chandraprakash Singhania
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2021PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Mar 2021
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
27 EastNA300000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

27 East: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises23%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 19 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Swimming PoolYes0%
Society OfficeYes0%
Fitness CenterYes0%

Parking filed86

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots86
Closed/Covered86

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,200 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5606.46
Proposed, not sanctioned5,606 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHotel Roa Road Building , Plot No 333, Lal Bahadur Shastri Marg, Ghatkopar West, Mumbai 400086

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThe Firm Architecture
EngineerShanghvi Associates Consultants Pvt Ltd
Chartered AccountantKETAN KATARIA AND ASSOCIATES
Chartered AccountantRAJENDRA R CHAPLOT
PartnerRole in project
Rashi Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Jun 2025

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupancy Certificate.pdf19 Jun 2025
Layout approvalFile: OC 1-5_11zon.pdf9 Mar 2025
Layout approvalFile: OC 2-5_11zon.pdf9 Mar 2025
Layout approvalFile: OC 3-5_11zon.pdf9 Mar 2025
Layout approvalFile: OC 4-5_11zon.pdf9 Mar 2025
Layout approvalFile: OC 5-5_11zon.pdf9 Mar 2025
Copy of Layout Approval (in case of layout)File: OC 1-5_11zon.pdf9 Mar 2025
Copy of Layout Approval (in case of layout)File: OC 2-5_11zon.pdf9 Mar 2025
Copy of Layout Approval (in case of layout)File: OC 3-5_11zon.pdf9 Mar 2025
Copy of Layout Approval (in case of layout)File: OC 4-5_11zon.pdf9 Mar 2025
Copy of Layout Approval (in case of layout)File: OC 5-5_11zon.pdf9 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 CA Certificate Q3 31-12-23.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3-CA Certificate-Q4-31-03-24.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3-CA Certificate-Q1-30-06-24.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3-CA Certificate-Q2-30-09-24.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-1 Architect Certificate Q1.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-1 Architect Certificate Q2.pdf8 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form - 4 Prop Resi Bldg on plot o - AS41-SA-21-CA-RERA-029 V1 R0.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2- Engineers Certificate-Q1.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2- Engineers Certificate-Q2.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2- Engineers Certificate.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2- Engineers Certificate-Q4.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate on Quality Assurance.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate on Quality Assurance.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate (Form 1) for RERA dt 010_240408_181731.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate (Form 1) for RERA dt 010_240408_181731.pdf17 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA-FORM-5.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form-1-Architect Certificate.pdf11 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2- Engineers Certificate.pdf11 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form - 3-Chartered Accountant Certificate.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1-Architect Certificate.pdf19 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2-Engineers Certificate.pdf19 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3-Chartered Accountant Certificate.pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form-1 Architect Certificate.pdf10 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2- Engineers Certificate.pdf10 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form - 3-Chartered Accountant Certificate_compressed.pdf10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form-1 Architect Certificate.pdf11 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form-2 Engineer Certificate.pdf4 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form - 3-Chartered Accountant Certi.pdf4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA FORM 5.pdf4 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form-1 Architect Certificate.pdf22 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Rera Certificate.pdf22 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form - 3-Chartered Accountant Certificate.pdf22 Nov 2022
Layout approvalFile: 1-Plan Scan copy the firm_Revised.pdf14 Sep 2022
Layout approvalFile: 2-Plan Scan copy the firm_Revised.pdf14 Sep 2022
Layout approvalFile: 3-Plan Scan copy the firm_Revised.pdf14 Sep 2022
Layout approvalFile: 4-Plan Scan copy the firm_Revised.pdf14 Sep 2022
Copy of Layout Approval (in case of layout)File: 1-Plan Scan copy the firm_Revised.pdf14 Sep 2022
Copy of Layout Approval (in case of layout)File: 2-Plan Scan copy the firm_Revised.pdf14 Sep 2022
Copy of Layout Approval (in case of layout)File: 3-Plan Scan copy the firm_Revised.pdf14 Sep 2022
Copy of Layout Approval (in case of layout)File: 4-Plan Scan copy the firm_Revised.pdf14 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Revised CC Rashi Developers.pdf14 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 Architect Certificate -Rashi Developers.pdf14 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate.pdf14 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate.pdf14 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 From Independent Chartered Accountant.pdf14 Sep 2022
Other - TechnicalFile: Self Decoration for Project.pdf14 Sep 2022
Other - TechnicalFile: Application for correction.pdf14 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3(FromIndependentCharteredAccountant).pdf29 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3(FromIndependentCharteredAccountant).pdf29 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1ArchitectReraCertificate.pdf28 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1ArchitectCertificate.pdf28 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2EngineerRERACertificate.pdf28 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2EngineerRERACertificate.pdf28 Apr 2022
Details of encumbrancesFile: Encumberance-Declaration-RERA-SBI.PDF8 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf10 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch rashi.pdf30 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: rera certificateform2aaug2021.pdf29 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rashi form 2 (2).pdf25 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rashi Developers_compressed.pdf25 Oct 2021
Disclosure of sold/ booked inventoryFile: RERA Disclosure-Sept-2021-qtr.PDF18 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rashi Form 2.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dt 30 06 2021 for RERA _compressed.pdf21 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rashi certificat compressed.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A RASHI_compressed.pdf19 Aug 2021
Details of encumbrancesFile: Rashi Developers 2.PDF12 Aug 2021
Details of encumbrancesFile: Rashi Developers EC.PDF11 Aug 2021
Declaration about Commencement CertificateFile: Declaration-RERA-06-08-2021.PDF11 Aug 2021
Disclosure of sold/ booked inventoryFile: Rashi MIS.PDF10 Aug 2021

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 27 East on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sagaon7,600+ in Thane

2 km27 EastCompleted 75Lapsed / revoked 68Other 123Dot size: filed unitsN

Filed coordinates, straight-line distance. 266 registered projects within 2 km.

Builder: Rashi Developers

Rashi Developers has 2 registrations on MahaRERA, including Rashi Tower and 27 East. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if 27 East is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 27 East?

The registered promoter entity is Rashi Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 27 East?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 27 East?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 27 East?

The professionals named in the filing: Architect: The Firm Architecture; Engineer: Shanghvi Associates Consultants Pvt Ltd; Chartered Accountant: KETAN KATARIA AND ASSOCIATES; Chartered Accountant: RAJENDRA R CHAPLOT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 27 East?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 27 East. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 27 East to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.