Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 50%
26 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

26 AVENUE is a Others project by AVENUE GROUP in Pune, Maharashtra, registered with MahaRERA as P52100053271 on 23 Oct 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 0 of the 26 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • Name26 AVENUE
  • TypeOthers
  • Location
    • RAVET
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • RERA no.P52100053271
  • ReraGenie IDRG-MH-45908

Builder

  • NameAVENUE GROUP
  • Entity typePartnership
  • GSTIN27ABXFA9700F1Z4
  • PartnersPRACHI DEEPAK DERE, SUYOG SURYAKANT CHHAJED

Key dates

this monthRegisteredOct 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed64 files

Current status

0%0 of 26 units booked
55.0%Work done, per cost certificate

Figures as on 4 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
26 AVENUENA5520626

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.

26 AVENUE: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered15
Open Space9

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area564 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2024
LandownerVillageDistrict
MAHENDRA RAMESH SHIRUDENashik (M Corp.)Nashik
CHETAN RAMESH SHIRUDEPimpri Chinchawad (M Corp.)Pune
MALATI RAMESH SHIRUDEChalisgaonJalgaon
VAISHALI KAILAS YEVALEMalegaon (M Corp.)Nashik
SHUBHANGI KAILAS SHEWALKARDeolaNashik

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI2773.89
Proposed, not sanctioned942 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHINCHWAD PUNE 411033
Estimated costRs 6.12 cr
Cost incurredRs 3.37 cr
Work done55.02%
BuildingWingEstimatedIncurred
26 AVENUENARs 5.18 crRs 3.37 cr
-NARs 94.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAVENUE ARCHITECT
ArchitectPRADIP KHURSULE
EngineerSB STRUCTURAL CONSULTANT
EngineerPRADIP KHURSULE
Chartered AccountantNAVDEEP JINDAL AND ASSOCIATES
Chartered AccountantLADDHA AND JAIN
PartnerRole in project
AVENUE GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17112518345Dec 2025 → Dec 2026

Reason as filed by the promoterDUE TO TECHNICAL AND FINANCIAL ISSUES

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf4 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf4 Feb 2026
Form 1File: Architect Letter.pdf7 Nov 2025
Form 2File: Form 2_Engineer Cerificate.pdf7 Nov 2025
Form 3File: Form 3.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Sold & Unsold.pdf7 Nov 2025
Form 2A (FY 2025-2026)File: 19.07.2025_FORM2A_ENGINEER CERTIFICATE.pdf31 Oct 2025
Form 1File: Form 1.pdf29 Sep 2025
Form 2File: FORM2.pdf29 Sep 2025
Form 3File: Form 3.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory.pdf29 Sep 2025
Form 2A (FY 2023-2024)File: 19.04.2024_FORM2A_ENGINEER CERTIFICATE.pdf29 Sep 2025
Form 2A (FY 2024-2025)File: 19.04.2025_FORM2A_ENGINEER CERTIFICATE.pdf29 Sep 2025
Form 1File: Q3 2023 -2024 Form2_ENGINEER CERTIFICATE.pdf5 Jul 2025
Form 2File: Q3 __ 2324 __ Form 3 __Avenue Group.pdf5 Jul 2025
Form 35 Jul 2025
Form 1File: Q4 2023 - 2024 Form2_ Engineer Certificate.pdf5 Jul 2025
Form 2File: Q4 __ 2324 __ Form 3 __Avenue Group.pdf5 Jul 2025
Form 35 Jul 2025
Form 1File: Q1 - 2024 - 2025 FORM2_ENGINEER CERTIFICATE.pdf5 Jul 2025
Form 2File: Q1 __ 2425 __ Form 3 __Avenue Group.pdf5 Jul 2025
Form 35 Jul 2025
Form 1File: Q2 2024 - 2025 Form_1_Architect Letter.pdf5 Jul 2025
Form 2File: Q2 2024 - 2025 FORM2_ENGINEER CERTIFICATE.pdf5 Jul 2025
Form 3File: Q2 __ 2425 __ Form 3 __Avenue Group.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q4 -2024 - 2025Disclosure of soldunsold inventory_26 Avenue.pdf5 Jul 2025
Form 1File: Q3 2024 - 2025 Form1_Architect letter.pdf5 Jul 2025
Form 2File: Q3 - 2024 - 2025 FORM2_ENGINEER CERTIFICATE.pdf5 Jul 2025
Form 3File: Q3 __ 2425 __ Form 3 __Avenue Group.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q4 -2024 - 2025Disclosure of soldunsold inventory_26 Avenue.pdf5 Jul 2025
Form 1File: Q4 2024 - 2025 Form1_Architect letter.pdf5 Jul 2025
Form 2File: Q4 - 2024 - 2025 FORM2_ENGINEER CERTIFICATE.pdf5 Jul 2025
Form 3File: Q4 __ 2425 __ Form 3 __Avenue Group.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q4 -2024 - 2025Disclosure of soldunsold inventory_26 Avenue.pdf5 Jul 2025
Form 5 (FY 2023-2024)File: 23-24 __ Form 5 __Avenue Group.pdf5 Jul 2025
Form 5 (FY 2024-2025)File: 24-25 __ Form 5 __Avenue Group.pdf5 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Audit Report Avenue Group 23-24.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory avenue group .pdf17 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Letter_RERA.pdf17 Dec 2024
Disclosure of Sold and Booked InventoryFile: Q3 2023 -2024 Architect Letter.pdf4 Oct 2024
Disclosure of Sold and Booked InventoryFile: Q4 2023 - 2024 Form_1_Architect Letter.pdf4 Oct 2024
Disclosure of Sold and Booked InventoryFile: Q1 2024 - 2025 Form_1_Architect Letter.pdf4 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANTS CERTIFICATE with sign compressed.pdf14 Oct 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER Revised_compressed.pdf29 Aug 2023
Copy of the legal title reportFile: 26 AVENUE.pdf28 Aug 2023
Proforma of Agreement for saleFile: DRAFT AGREEMENT - BY LEGAL REALTY LLP - FOR RERA REGISTRATION.pdf28 Aug 2023
CERSAI detailsFile: CERSAI RECEIPT.pdf12 Aug 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE - LEGAL AND FINANCE.pdf9 Aug 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE - LEGAL AND FINANCE.pdf9 Aug 2023
Declaration in FORM BFile: FORM B OF PROMOTER.pdf9 Aug 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT - AGREEMENT TO SALE - NEW.pdf9 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf28 Jul 2023
Layout approvalFile: PLAN 1.pdf24 Jul 2023
Building plan approvalFile: PLAN 2.pdf24 Jul 2023
PAN CardFile: PAN CARD.pdf24 Jul 2023
Copy of Layout Approval (in case of layout)File: PLAN 1.pdf24 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf24 Jul 2023
Declaration about Commencement CertificateFile: DECLARATION OF CC.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf21 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST.pdf21 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPERATE BANK ACCOUNT DETAILS.pdf21 Jul 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT OF ALLOTMENT.pdf21 Jul 2023

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 26 AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAVET13,700+ in Pune

Builder: AVENUE GROUP

AVENUE GROUP has 1 registration on MahaRERA, including 26 AVENUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 26 AVENUE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 26 AVENUE?

The registered promoter entity is AVENUE GROUP, a partnership as per the filing. Its GSTIN 27ABXFA9700F1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 26 AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 26 AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 26 AVENUE?

The professionals named in the filing: Architect: AVENUE ARCHITECT; Architect: PRADIP KHURSULE; Engineer: SB STRUCTURAL CONSULTANT; Engineer: PRADIP KHURSULE; Chartered Accountant: NAVDEEP JINDAL AND ASSOCIATES; Chartered Accountant: LADDHA AND JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 26 AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 26 AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 26 AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.