Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 62 months
- 4 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sky Crest is a Residential / Group Housing project by Sky Property Developers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003517 on 5 Aug 2017. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 62 months from the original filing. 20 of the 49 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameSky Crest
- TypeResidential / Group Housing
- Location
- Liberty Garden
- Malad West
- Greater Mumbai (M Corp.) (Part) (802794)
- Mumbai
- Mumbai Suburban
- 400064
- Pincode400064
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800003517
- ReraGenie IDRG-MH-19773
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Aug 2017
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 31 Jan 2021)
- Buildings1 building record
- Documents filed137 files
Current status
Figures as on 28 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sky Crest | NA | 14 | 14 | 43 | 6 | 49 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Sky Crest: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed17
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Sky Crest | NA | Rs 3.54 cr | Rs 2.89 cr |
| - | NA | Rs 1.52 cr | Rs 1.24 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/s Sandeep Vichare & Associates |
| Architect | Bipin Nanaji More |
| Engineer | R . D. MAGDUM |
| Engineer | Chetan Tambewagh |
| Chartered Accountant | R A N K & Associates |
| Chartered Accountant | Khushalani & Co. |
| Chartered Accountant | M.s. R.A. Rajput & Co. |
| Partner | Role in project |
|---|---|
| Sky Property Developers Private Limited | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe under-construction project got delayed due to Change in size of flats, no of floors which led to revision in Concession plans of the building. We had applied for revised concession plans on 29.03.2020 however the same got approved on 21.07.2020 due to worldwide lockdown declared on account of Covid-19 from 22.03.2020. Later due to ambiguity in DCR Rules and payment schemes of the department, further application for revised IOD and CC was made on 15.12.2020. Even though the departments and authority had started their operations but the same was not as effective as before, which led to delay
Reason as filed by the promoterThe under-construction project got delayed due to Change in size of flats which led to revision in concession plans of the building. We had applied for revised concession plans on 24.03.2020 however the same got approved on 21 July, 2020 due to worldwide lockdown declared on account of Covid-19 from 22.03.2020. We are yet to apply for revised IOD and CC of the building since there is ambiguity in DCR Rules and payment schemes of the department. Even though the departments and authority has started working but the same will take time as the respective local authorities are not functioning as be
Reason as filed by the promoterWe do not have our name in PR Card and are facing below mentioned issues:- 1. For C.T.S No. 38, 38/1 to 38/7 The Property Register Card was held by Smt. Mathurabai Kishnadas Murapna for the above-mentioned C.T.S. By succession & inheritance, 23 legal heirs and representatives (as mentioned in the title report) have received rights in above mentioned land. The PRC has not been updated till date with the name of new Land owners. 2. For C.T.S No. 37 A The Property Register Card was held by 1). Nikanth Kashinath Kudtarkar; 2) Smt. Gajanan Kashinath Kudtarkar; 3). Sadanand Kashinath Kudtarkar; 4).
Reason as filed by the promoterThe delay in updating our entity's name in the property card has been due to administrative hurdles and procedural delays beyond our control. Despite our best efforts, the process has taken longer than anticipated, thereby affecting the progress of the project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed137
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Signed Form 2A FY 24_25.pdf | 28 May 2026 |
| Form 2A (FY 2025-2026)File: Signed Form 2A for FY 25 26_Sky Crest.pdf | 11 May 2026 |
| Withdrawal Update Form 1File: Sky Crest Form1 Q4 FY 25-26.pdf | 30 Apr 2026 |
| Withdrawal Update Form 2File: Sky Crest Form 1 Architect Certificate Q4 FY -2025-26.pdf | 30 Apr 2026 |
| Withdrawal Update Form 3File: Signed Sky Crest Form3 - Q4 FY 25-26.pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: Signed SKY CREST FORM-1.pdf | 12 Feb 2026 |
| Withdrawal Update Form 2File: SKY CREST-FY-2025-26-Q2-FORM-2.pdf | 12 Feb 2026 |
| Withdrawal Update Form 3File: SKY CREST FORM -3 Signed Q3.pdf | 12 Feb 2026 |
| Withdrawal Update Form 1File: SKY CREST-FY-2025-26-Q2-FORM-1.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: SKY CREST-FY-2025-26-Q2-FORM-2.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: Signed Final Withdrawal Application Form3.pdf | 4 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 CREST 24-25.pdf | 13 Nov 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 7 May 2025 |
| Certificates of CA (Form 3)File: Form 3_Compressed.pdf | 7 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: DOS.pdf | 7 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-ARCHITECT CERTIFICATE-SKY CREST 04-02-25.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Sky Crest_Form 3 as on 31122024 Signed_11zon.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 Engineers Certificate-Q3.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 Engineers Certificate-Q3.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory-Q3-2024-25.pdf | 31 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 ARCHITECT CERTIFICATE.pdf | 30 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 Engineers Certificate.pdf | 30 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of InventorySky Crest as on 30092024.pdf | 30 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 23-24_Sky Crest.pdf | 2 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Declaration-Sky Crest.pdf | 25 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Declaration-Sky Crest.pdf | 25 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory-Sky Crest.pdf | 25 Jul 2024 |
| Certificates of CA (Form 3)File: Self Declaration-Sky Crest.pdf | 25 Jul 2024 |
| Proforma of Agreement for saleFile: Revised AFS.pdf | 13 Jun 2024 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 13 Jun 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation report_Allotment letter.pdf | 13 Jun 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report_AFS.pdf | 13 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf | 10 Jun 2024 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf | 10 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATION LETTER.pdf | 10 Jun 2024 |
| Declaration about Commencement CertificateFile: Format D - Declaration on CC.pdf | 10 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold_All flats V2.pdf | 10 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A_Decl for Separate Bank account_70.pdf | 10 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Signed Format A_Decl for Separate Bank account.pdf | 10 Jun 2024 |
| Layout approvalFile: Layout and Block plan_v1.pdf | 7 Jun 2024 |
| Layout approvalFile: 1234-2.pdf | 7 Jun 2024 |
| Layout approvalFile: 1234-3.pdf | 7 Jun 2024 |
| Layout approvalFile: 1234-4.pdf | 7 Jun 2024 |
| Layout approvalFile: 1234-5.pdf | 7 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Layout and Block plan_v1.pdf | 7 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: 1234-2.pdf | 7 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: 1234-3.pdf | 7 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: 1234-4.pdf | 7 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: 1234-5.pdf | 7 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Signed Chandulal_Disc of interest in other organisation.pdf | 4 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Signed Amith_Disc of interest in other organisation.pdf | 4 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Signed Sunny_Disc of interest in other organisation.pdf | 4 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Signed Format A_Decl for Separate Bank account.pdf | 4 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Discl of sold unsold_Sky Crest.pdf | 16 May 2024 |
| Layout approvalFile: Layout_Location plan.pdf | 15 May 2024 |
| Layout approvalFile: 2nd to 12th floor plan.pdf | 15 May 2024 |
| Layout approvalFile: floor area calculation.pdf | 15 May 2024 |
| Layout approvalFile: Section Plan.pdf | 15 May 2024 |
| Copy of Layout Approval (in case of layout)File: Layout_Location plan.pdf | 15 May 2024 |
| Copy of Layout Approval (in case of layout)File: 2nd to 12th floor plan.pdf | 15 May 2024 |
| Copy of Layout Approval (in case of layout)File: floor area calculation.pdf | 15 May 2024 |
| Copy of Layout Approval (in case of layout)File: Section Plan.pdf | 15 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Sky Crest.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Crest form 2A-Q4.pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold.pdf | 4 May 2024 |
| Certificates of CA (Form 3)File: Form 3 Sky Crest Compressed.pdf | 30 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf | 29 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked.pdf | 29 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sky Crest - Self Declaration for not issuing new Forms1,2,3 signed.pdf | 31 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sky Crest - Self Declaration for not issuing new Forms1,2,3 signed.pdf | 31 Jan 2024 |
| Certificates of CA (Form 3)File: Sky Crest - Self Declaration for not issuing new Forms1,2,3 signed.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory-Q3-2023-24.pdf | 27 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory-Q3-2023-24.pdf | 27 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Q2 FY 23-24 (2).pdf | 26 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CREST 22-23.pdf | 26 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of soldBooked InventoryQ1202324.pdf | 28 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SKY PROPERTY DEVELOPERS PVT LTD FORM-2A_21-22.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SKY PROPERTY DEVELOPERS PVT LTD FORM-2A-22-23.pdf | 21 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SKY PROPERTY DEVELOPERS PVT LTD FORM-1-22-23.pdf | 17 Apr 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Sky Residency Loksadan CHS Phase 1 Up to G Plus 7pt.P51800003387 | Liberty Garden, Mumbai Suburban | Aug 2017 | Completed | Dec 2017 | Late, Jun 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 137 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sky Crest on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Malad West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 374 registered projects within 2 km.
Ruparel Stardom
AMI MODISPACES LLP
Chandak Treesourus
CHANDAK REALTORS PRIVATE LIMITED
ANCHORPOINT AVIARA
YUKTI INFRAPROJECTS LLP
AURIS ILARIA TOWER A
TRANSCON-SHETH CREATORS PRIVATE LIMITED
ADHRIT
MUNDARA DEVELOPERS
IRENE WING B PHASE 1
Sheth Creators and Sunvision Private Limit
See every Mumbai Suburban project, with the district possession charts
Builder: Sky Property Developers Private Limited
Sky Property Developers Private Limited has 2 registrations on MahaRERA, including Sky Crest and Sky Residency Loksadan CHS Phase 1 Up to G Plus 7pt.. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Sky Crest shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Sky Crest is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sky Crest?
The registered promoter entity is Sky Property Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sky Crest?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sky Crest?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sky Crest?
The professionals named in the filing: Architect: M/s Sandeep Vichare & Associates; Architect: Bipin Nanaji More; Engineer: R . D. MAGDUM; Engineer: Chetan Tambewagh; Chartered Accountant: R A N K & Associates; Chartered Accountant: Khushalani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sky Crest?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback