1 Hallmark Aveneu Phase II

By RajHeramb Properties

RG-MH-04856 · RERA P52100020694 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 48 months from the original
3 of 11Construction stages donefurthest along: Staircases, 75%
10 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

1 Hallmark Aveneu Phase II is a Residential / Group Housing project by RajHeramb Properties in Pune, Maharashtra, registered with MahaRERA as P52100020694 on 3 May 2019. Possession is promised by 30 Apr 2028. The completion date has moved by 48 months from the original filing. 37 of the 47 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • Name1 Hallmark Aveneu Phase II
  • TypeResidential / Group Housing
  • Location
    • BRT Road
    • Ravet
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020694
  • ReraGenie IDRG-MH-04856

Builder

  • NameRajHeramb Properties
  • Entity typeOthers
  • ProprietorPraviN Viswanath Patil Patil
  • Other registrations5 more →
  • Completed4 of 6
  • Declared earlier projects6 →

Key dates

this monthRegisteredMay 2019First promiseApr 2024Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2019
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 30 Apr 2024)
  • Buildings1 building record
  • Documents filed91 files

Current status

79%37 of 47 units booked
64.8%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA141347047

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.

A: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises29%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.39%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes-

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Closed/Covered28
Open Space19

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,418 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation (PCMC)
Permissible FSI3328.55
Proposed, not sanctioned3,329 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNDA Road, Bavdhan Pune 411021
Estimated costRs 14.79 cr
Cost incurredRs 9.57 cr
Work done64.75%
BuildingWingEstimatedIncurred
ANARs 10.62 crRs 8.05 cr
-NARs 4.17 crRs 1.52 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGem Associates
EngineerAKSHAY SANJAY PATIL
EngineerYOGESH NAIK
Chartered AccountantAbhishek Naikwadi
Chartered AccountantUGALE & ASSOCIATES
PartnerRole in project
RajHeramb Properties-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013124Apr 2024 → Apr 2026

Reason as filed by the promoterWORK IS 25% COMPLETED. ONLY 5 FLATS ARE SOLD AND WE HAVE TAKEN CONSENT FROM ALL 5 ALLOTTEES, NOW WE NEED TO SALE FURTHER FLATS FROM THE PROJECT FOR THAT WE REQAUIRE RERA CERTIFICATE TO BE EXTENDED TILL 30/04/2026.

EA27042620745Apr 2024 → Apr 2028

Reason as filed by the promoterThe construction of the project is 55.34% Completed. We need extension till 30/04/2028 to complete the remaining construction of the said project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf20 Jul 2026
Withdrawal Update Form 2File: FROM 2.pdf20 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf23 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf23 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1 31-12-2025.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2 31-12-2025.pdf21 Jan 2026
Withdrawal Update Form 3File: FORM 3 31-12-2025.pdf21 Jan 2026
Withdrawal Update Form 1File: 1 Hallmark Avenue ( Phase II) Architect Certificate July to September 2025.pdf30 Oct 2025
Withdrawal Update Form 2File: Hallmark Avenue II Form 2.pdf30 Oct 2025
Withdrawal Update Form 3File: Form 3 Hallmark Avenue II sept 25.pdf30 Oct 2025
Form 5 (FY 2024-2025)File: Hallmark Avenue Form 5 Sept 25.pdf16 Oct 2025
Form 1File: Architect Certificate April to June 2025.pdf2 Aug 2025
Form 2File: Engineers's Certificate April to June 2025.pdf2 Aug 2025
Form 3File: FORM 3 as on 1st April to 30th June 2025.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory April to June 2025.pdf2 Aug 2025
Form 5 (FY 2023-2024)File: FORM 5 FY 2023-24.pdf10 Jul 2025
Form 1File: Architect Certificate January to March 2025.pdf8 Jul 2025
Form 2File: Engineers's Certificate January to March 2025.pdf8 Jul 2025
Form 3File: FORM 3 as on 1st Jan to 31st March 2025.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory dated 31 03 2025.pdf8 Jul 2025
Form 1File: Architect Certificate JOctober to December 2024.pdf8 Jul 2025
Form 2File: Engineers's Certificate October to December 2024.pdf8 Jul 2025
Form 3File: FORM 3 as on 1st October to 31st December 2024.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory dated 31 12 2024.pdf8 Jul 2025
Form 1File: Architect Certificate July to September 2024.pdf8 Jul 2025
Form 2File: Engineers's Certificate July to September 2024.pdf8 Jul 2025
Form 3File: FORM 3 as on 1st July to 30th September 2024.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory dated 30 09 2024.pdf8 Jul 2025
Form 1File: Architect Certificate April to June 2024.pdf8 Jul 2025
Form 2File: Engineers's Certificate April to June 2024.pdf8 Jul 2025
Form 3File: FORM 3 as on 1st April to 30th June 2024.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory dated 30 06 2024.pdf8 Jul 2025
Form 1File: Architect Certificate January to March 2024.pdf8 Jul 2025
Form 2File: Engineers's Certificate January to March 2024.pdf8 Jul 2025
Form 3File: FORM 3 as on 1st Jan to 31st March 2024.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory dated 31 03 2024.pdf8 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Hallmark Avenue ( Phase II) Architect Certificate January to March 2023.pdf19 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Hallmark Avenue ( Phase II) Architect Certificate April to June 2023.pdf19 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Hallmark Avenue ( Phase II) Architect Certificate July to September 2023.pdf19 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Hallmark Avenue ( Phase II) Architect Certificate October to December 2023.pdf19 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Hallmark Avenue ( Phase II) Engineer Certificate January to March 2023.pdf19 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Hallmark Avenue ( Phase II) Engineer Certificate April to June 2023.pdf19 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Hallmark Avenue ( Phase II) Engineer Certificate July to September 2023.pdf19 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Hallmark Avenue ( Phase II) Engineer Certificate October to December 2023.pdf19 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 1 Hallmark Avenue ( Phase II) FORM 2A FY 2020-21.pdf19 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Hallmark Avenue ( Phase II) FORM 2A FY 2022-23.pdf19 Mar 2024
Certificates of CA (Form 3)File: 1 Hallmark Avenue ( Phase II) FORM 3 January to March 2023.pdf19 Mar 2024
Certificates of CA (Form 3)File: 1 Hallmark Avenue ( Phase II) FORM 3 April to June 2023.pdf19 Mar 2024
Certificates of CA (Form 3)File: 1 Hallmark Avenue ( Phase II) FORM 3 July to September 2023.pdf19 Mar 2024
Certificates of CA (Form 3)File: 1 Hallmark Avenue ( Phase II) FORM 3 Oct to Dec 2023.pdf19 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 1 Hallmark Avenue ( Phase II) FORM 5 FY 2023-23.pdf19 Mar 2024
Disclosure of sold/ booked inventoryFile: 1 Hallmark Avenue ( Phase II) Sold Unsold Inventory January to March 2023.pdf18 Mar 2024
Disclosure of sold/ booked inventoryFile: 1 Hallmark Avenue ( Phase II) Sold Unsold Inventory April to June 2023.pdf18 Mar 2024
Disclosure of sold/ booked inventoryFile: 1 Hallmark Avenue ( Phase II) Sold Unsold Inventory July to September 2023.pdf18 Mar 2024
Disclosure of sold/ booked inventoryFile: 1 Hallmark Avenue ( Phase II) Sold Unsold Inventory October to December 2023.pdf18 Mar 2024
Proforma of Agreement for saleFile: Ravet RERA Darft for A Building (1).pdf26 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Phase II_compressed.pdf7 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Hallmark Avenue Ravet Engineer Certificate Phase II as 30-06- 2022 - (1)_compressed.pdf7 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Phase II as 30-09- 2022.pdf7 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - _compressed.pdf7 Dec 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf7 Dec 2022
Certificates of CA (Form 3)File: FORM 3 dated 30-06-2022.pdf7 Dec 2022
Certificates of CA (Form 3)File: FORM 3 dated 30-09-2022_organized.pdf7 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 for FY 2019-20 - _compressed.pdf7 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 for FY 2020-21.pdf7 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 for FY 2021-22 - _compressed.pdf7 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RAVET A building Rera Architect Certificate.pdf6 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ravet A bldg Engineer.pdf6 Jul 2021
Certificates of CA (Form 3)File: RAVET A building Rera CA Certificate.pdf6 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Ravet Phase II.pdf14 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ravet Phase II Engineer Certificate.pdf14 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer 2A Ravet Phase II.pdf14 Feb 2020
Certificates of CA (Form 3)File: CA Certificate Ravet Phase II Dated 25 01 2020.pdf14 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Certificate Architect II Phase Ravet.pdf11 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate A Wing II Phase Ravet.pdf11 Dec 2019
Certificates of CA (Form 3)File: Rera Certificate CA II Phase A Wing Ravet.pdf11 Dec 2019
Certificates of CA (Form 3)File: CA A Building.pdf27 Apr 2019
Building plan approvalFile: Ravet IOD Layout.pdf24 Apr 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Regalia Residencyplot no 1 14 15 16 out of survey no 276 1 2 277 1 2 278 2 and survey no 275 Bavdhan Budruk tal mulshi dist pune119CompletedAug 2014Late, Jun 2015

How this compares with Pune

79%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 1 Hallmark Aveneu Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravet13,700+ in Pune

2 km1 Hallmark Aveneu Phase Completed 114Lapsed / revoked 47Other 106Dot size: filed unitsN

Filed coordinates, straight-line distance. 267 registered projects within 2 km.

Builder: RajHeramb Properties

RajHeramb Properties has 6 registrations on MahaRERA, including Regalia Residency and Venkatesh Imperia Phase I. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 1 Hallmark Aveneu Phase II is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 1 Hallmark Aveneu Phase II?

The registered promoter entity is RajHeramb Properties, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 1 Hallmark Aveneu Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 1 Hallmark Aveneu Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 1 Hallmark Aveneu Phase II?

The professionals named in the filing: Architect: Gem Associates; Engineer: AKSHAY SANJAY PATIL; Engineer: YOGESH NAIK; Chartered Accountant: Abhishek Naikwadi; Chartered Accountant: UGALE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 1 Hallmark Aveneu Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 1 Hallmark Aveneu Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 1 Hallmark Aveneu Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.