New projects and RERA data in Dhule district, Maharashtra

71 projects are registered in Dhule district: 627 units across them, 0 registered in the last 12 months. Sales and inventory trends accumulate from each future quarterly update; this page shows the first one.

71Projects covered
0Registered, last 12 months
627Units declared
457Units not yet booked
15Completion dates revised
0With declared litigation

Of the 71 covered registrations, 15 have revised their promised completion date and 0 declare litigation. The median project here is 30% booked as of the current data. Every figure comes from the projects' own MahaRERA filings.

Also free on ReraGenie: a monthly RERA report for the seven biggest markets in Maharashtra (Pune, Mumbai, Thane, Navi Mumbai, Nagpur, Nashik and Vasai-Virar): what registered that month, the possession pipeline and the busiest pincodes, from the filings. See the latest editions.

When Dhule projects promise possession

Promised possession year as filed by the builder with MahaRERA, split by what the registration says today. Of 71 projects with a promised date, 31 are recorded delivered, 18 are still on the register and 22 have a registration that has lapsed or been cancelled.

DeliveredOn the registerRegistration lapsed or cancelled

05101520today2018: 3 projects, delivered’182019: 4 projects, delivered’192020: 2 projects, delivered’202021: 2 projects, delivered2021: 2 projects, registration lapsed or cancelled’212022: 3 projects, delivered2022: 5 projects, registration lapsed or cancelled’222023: 8 projects, delivered2023: 5 projects, registration lapsed or cancelled’232024: 4 projects, delivered2024: 6 projects, registration lapsed or cancelled’242025: 3 projects, delivered2025: 3 projects, registration lapsed or cancelled’252026: 1 projects, delivered2026: 4 projects, on the register2026: 1 projects, registration lapsed or cancelled’262027: 1 projects, delivered2027: 7 projects, on the register’272028: 3 projects, on the register’282029: 1 projects, on the register’292030: 1 projects, on the register’302031: 2 projects, on the register’31

21 projects promise possession in 2026 or later. Facts as per filings on RERA website.

050100150200today’182019: 104 flats, delivered (only 1 of 4 projects filed a flat count)’19’20’212022: 17 flats, registration lapsed or cancelled (only 1 of 8 projects filed a flat count)’22’232024: 44 flats, registration lapsed or cancelled (only 2 of 10 projects filed a flat count)’242025: 18 flats, registration lapsed or cancelled (only 1 of 6 projects filed a flat count)’252026: 22 flats, delivered2026: 34 flats, on the register’262027: 107 flats, on the register’272028: 91 flats, on the register’28’29’302031: 190 flats, on the register’31

444 flats are promised in 2026 or later, across the 62% of those projects that file a flat count. Hatched years are ones where most builders never filed a count, so the bar understates real supply and cannot be compared with the years beside it. Facts as per filings on RERA website.

How far Dhule possession dates have moved

Builders may revise the possession date they filed at registration. Each bar is the year a project first promised, split by how far that date has since moved. 15 of 71 projects (21%) have moved at least once; the median move is 32 months and the longest is 96 months.

Kept the original dateMoved by under 2 yearsMoved by 2 years or more

05101520Originally due 2018: 3 projects kept the original date, 60% of the yearOriginally due 2018: 1 projects moved by under 2 years, 20% of the yearOriginally due 2018: 1 projects moved by 2 years or more, 20% of the year’18Originally due 2019: 3 projects kept the original date, 50% of the yearOriginally due 2019: 3 projects moved by 2 years or more, 50% of the year’19Originally due 2020: 1 projects kept the original date, 25% of the yearOriginally due 2020: 1 projects moved by under 2 years, 25% of the yearOriginally due 2020: 2 projects moved by 2 years or more, 50% of the year’20Originally due 2021: 3 projects kept the original date, 75% of the yearOriginally due 2021: 1 projects moved by 2 years or more, 25% of the year’21Originally due 2022: 7 projects kept the original date, 88% of the yearOriginally due 2022: 1 projects moved by under 2 years, 12% of the year’22Originally due 2023: 10 projects kept the original date, 91% of the yearOriginally due 2023: 1 projects moved by 2 years or more, 9% of the year’23Originally due 2024: 9 projects kept the original date, 90% of the yearOriginally due 2024: 1 projects moved by 2 years or more, 10% of the year’24Originally due 2025: 6 projects kept the original date, 86% of the yearOriginally due 2025: 1 projects moved by under 2 years, 14% of the year’25Originally due 2026: 4 projects kept the original date, 80% of the yearOriginally due 2026: 1 projects moved by under 2 years, 20% of the year’26Originally due 2027: 5 projects kept the original date, 100% of the year’27Originally due 2028: 3 projects kept the original date, 75% of the yearOriginally due 2028: 1 projects moved by 2 years or more, 25% of the year’28Originally due 2030: 1 projects kept the original date, 100% of the year’30Originally due 2031: 1 projects kept the original date, 100% of the year’31

Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

050100150200’18Originally due 2019: 104 flats kept the original date, 50% of the year (only 2 of 6 projects filed a flat count)Originally due 2019: 12 flats moved by 2 years or more, 50% of the year (only 2 of 6 projects filed a flat count)’19Originally due 2020: 22 flats moved by 2 years or more, 50% of the year (only 1 of 4 projects filed a flat count)’20’21Originally due 2022: 17 flats kept the original date, 88% of the year (only 1 of 8 projects filed a flat count)’22Originally due 2023: 21 flats moved by 2 years or more, 9% of the year (only 1 of 11 projects filed a flat count)’23Originally due 2024: 44 flats kept the original date, 90% of the year (only 2 of 10 projects filed a flat count)’24Originally due 2025: 18 flats kept the original date, 86% of the year (only 2 of 7 projects filed a flat count)Originally due 2025: 20 flats moved by under 2 years, 14% of the year (only 2 of 7 projects filed a flat count)’25Originally due 2026: 14 flats kept the original date, 80% of the year (only 2 of 5 projects filed a flat count)Originally due 2026: 22 flats moved by under 2 years, 20% of the year (only 2 of 5 projects filed a flat count)’26Originally due 2027: 52 flats kept the original date, 100% of the year (only 2 of 5 projects filed a flat count)’27Originally due 2028: 91 flats kept the original date, 75% of the yearOriginally due 2028: 50 flats moved by 2 years or more, 25% of the year’28’30Originally due 2031: 140 flats kept the original date, 100% of the year’31

Hatched years are ones where most builders never filed a flat count, so the bar understates the real total. Read down a bar to see how much of that year's cohort held its promise. Facts as per filings on RERA website.

Permissions and land in Dhule

Who sanctions building in Dhule

17 of the 71 registrations on this page name the body that sanctioned their building plan. The rest leave that box empty, which is a gap in the filing and not a project without permission: the commencement certificate is filed as a separate document and is on the file for most projects. The body named here is where a commencement or occupancy certificate is verified.

Sanctioning authorityProjects
Dhule Municipal Corporation16
DHULE MINICIPAL CORPORATION1

One body is often filed under several spellings, and those are counted together. Acronyms that could mean two different bodies are not: PMC is Pune or Pimpri Chinchwad depending who typed it, so it is counted as filed.

Whose name the land is in

Every one of the 71 registrations on this page answers this: on 38 the promoter is the only owner named; on 32 the promoter is an owner with other names on the file, which is what a joint development looks like on paper; on 1 the promoter is not an owner. Where other names are on the file, ask which of them signs your agreement for sale. A landowner who is not a party to it is a question for your lawyer before you pay, not a defect in the project.

Where in Dhule: projects by taluka

71 of the 71 registrations on this page name their taluka.

TalukaProjectsShare
Dhule6693%
Shirpur34%
1 other taluka23%

Projects in Dhule

Showing 1 to 60 of 71 projects.

Largest first, by the unit count in the filing.

ProjectDeveloperUnitsBookedRegisteredStatus
MARUTI NANDAN BUSINESS HUBAT DHULE, 424001SANJAY NANDKISHOR AGRAWAL1400%1 Sep 2025Registered
ASHTAVINAYAK NAGARDHULE, 424001ASHTAVINAYAK LAND DEVELOPERS10483%16 Mar 2018Completed
SHIVAM PLAZAVILLAGE DEOPUR, 424002ALKA VASANTRAO WANKHEDE500%20 Aug 2024Registered
Bhalchandra RegencyNakane road, 424002Om Shiv Infra4713%4 Jun 2025Registered
Nakshatram AthashriNear Sai Mandir, Deopur, 424002Divine Infrastructure4028%6 May 2025Registered
Dreams AnuramDhule, 424002Dream House Builders And Developers320%20 Apr 2022Registration lapsed
Dream's GTPGTP Colony, 424002New Dream House Builders and Developers2433%3 Jul 2025Registered
NAKSHATRA AVENUEDEOPUR, 424002DHARMNITI CONSTRUCTION PRIVATE LIMITED2232%15 Dec 2022Registered
VRUNDAVAN PLAZAInfront of Lokmanya Hospital, 424001VRUNDAVAN BUILDCON2286%31 Aug 2017Completed
Suman ApartmentDeopur, Dhule, 424002Siddhivinayak Engineer and Contractors210%28 Apr 2022Registered
KRUSHNA KUNJ HEIGHTSNEAR AGRA ROAD GTP STOP AREA DEOPUR DHULE, 424002JAI SHREEKRISHNA DREAM HOMES BUILDERS AND DEVELOPERS2045%19 Jan 2023Registered
Narmada HeightsDeopur, 424002APS Developers2010%13 Aug 2025Registered
G K ARCADEWALWADI DEOPUR DHULE, 424002GOPAL KASHINATH KELE HUF1811%1 Apr 2023Registration lapsed
SURYA RESIDENCYwalwadi, 424001M/s Concept Builder And Developers170%6 Dec 2020Registration lapsed
Narayani ApartmentNear Dolly House, Deopur, 424002Chaudhari and Badgujar Associates1436%9 May 2025Registered
KALINDI APARTMENTDhule (M Corp.), 424001SHRIRANG DEVELOPERS1233%31 Aug 2017Registered
PADMASHREE RESIDENCY VISTATION ROAD, 424001PARAG SUBHASH AHIRE1250%3 Feb 2020Registration lapsed
PADMASHREE RESIDENCY VIIMAUJE DEOPUR SHIWAR, 424002PARAG SUBHASH AHIRE1242%12 Apr 2023Registered
AAI HINGLAJ RESIDENCYDEOPUR, 424005AAI HINGLAJ RESIDENCY--5 Jul 2019Registration lapsed
AJINKYATARA RESIDENCYPRASHANT NAGAR PARISAR, 424005KRUSHNA AAVISHKAR REALTIES--14 Mar 2022Registered
AnandvanAwdhan, 424001Raka Agrawal Builders--27 Dec 2024Registered
BHALCHANDRASUYOG NAGAR, 424002HARVISH DEVELOPER--11 Apr 2025Registered
BRAHMAKAMALDEOPUR, 424002PIYUSH LIFESPACES PRIVATE LIMITED--5 Sep 2019Completed
CHANDRAVEL3chandravel 2, 424001PIYUSH LIFESPACES PRIVATE LIMITED--26 Jul 2017Completed
COnstruction of 256EWS T/s and 64 Shops under PMAY scheme no S.No.471,477,478 Chalisgaon Road,DhulePawan nagar, 424001NASHIK HOUSING & AREA DEVELOPMENT BOARD--5 Mar 2019Completed
Eknath HeightsDhule (M Corp.), 422002Lifestyle Realties--7 Nov 2017Completed
G K MARKET PHASE 1WALWADI SHIVAR, 424002GOPAL KASHINATH KELE--15 Jun 2022Completed
GOKUL APARTMENTDhule (M Corp.), 424001PUNDLIK GOKUL SUTAR--1 Sep 2017Completed
GOVARDHAN HEIGHTSSAMRAT NAGAR, 424001JAI SHREEKRISHNA DREAM HOMES BUILDERS AND DEVELOPERS--5 Jul 2019Completed
GURURAJ APARTMENTDEOPUR, 424002NILESH PRAKASH JADHAV--31 Dec 2020Completed
H K VILLHA APARTMENTDHULE, 424002H K CONSTRUCTION--27 Jul 2018Registration lapsed
Hasti TowerDondaicha-Warwade(M Cl), 425408Kumar Developers--7 Oct 2017Completed
HIRADEEP APARTMENTJAY HIND COLONY, 424002PARAG SUBHASH AHIRE--12 Nov 2018Registration lapsed
INDRAMANGAL APARTMENTMAHAVIR VIHAR, 425405M/S NAVJEEVAN DEVELOPERS AND INFRASTRUCTURE SERVICES--15 Mar 2023Registration lapsed
JAAIJAIHIND COLONY, 424002PIYUSH LIFESPACES PVT LTD DHULE--29 Nov 2021Completed
JAI KISHAN PARKDHULE, 425406V K INFRASTRUCTURE & CO--23 Jan 2018Registration lapsed
Kai. Abasaheb R R Patil Vyapari SankulDhule (M Corp.), 424002BORSE BROTHERS ENGINEERS AND CONTRACTORS PVT LTD--17 Aug 2017Completed
Krishna KunjaDeopur, Dhule, 424001Chetan Vidyadhar Pathak--14 Feb 2023Registration lapsed
MANGALMURTI RESIDENCYDHULE, 424001SUMIT SANJAY KORAKE--16 Sep 2019Registration lapsed
NAKSHATRAMWALWADI VILLAGE, 424002DIVINE INFRASTRUCTURE--15 Feb 2023Completed
NIRMAL HEIGHTSJAI HIND COLONY DEOPUR DHULE, 424002VARSHA VASANT PATIL--29 May 2021Completed
PADMASHREE RESIDENCY IIIDEOPUR, 424002PARAG SUBHASH AHIRE--12 Nov 2018Registration lapsed
PADMASHREE RESIDENCY IVDEOPUR, 424002PARAG SUBHASH AHIRE--24 Sep 2019Registration lapsed
PADMASHREE RESIDENCY VDEOPUR, 424002PARAG SUBHASH AHIRE--29 Jan 2020Registration lapsed
POOJA APPARTMETSDHULE, 424001ISHWAR DNYANDEO LADE--24 Nov 2020Registration lapsed
PRATIKRAJ APRTMENTDHULE, 424001AVINASH PUNDLIK THORAT--15 Jan 2018Registration lapsed
PREMLATAMouje Dhule, 424001BHANDARI REALTY AND INFRASTRUCTURE COMPANY--29 Jul 2024Registration lapsed
Radha Krishna Nagri Phase 1A/P Karvand, Taluka Shirpur, District Dhule, 425405Smyle Housing Development Pvt. Ltd.--7 Nov 2024Registered
RADHA NAGARMOUZA- WALWADI, 424001ASHOK RAMNIWAS AGRAWAL--27 Jun 2023Completed
RAKA PARKWalwadi (CT), 424005ADINATH INFRASTRUCTURE--22 Aug 2017Completed
RAMKRISHNA APARTMENTSHRIRAM COLONY, 424002RAJENDRA VASANTRAO KHANKARI--14 Mar 2022Completed
REVISED TO PROPOSED 400 EWS AND 288 MIG HOUSING AT SITE NO.1A SURVEY NO.60 MAUJJA.WARWADESHIRPUR WARWADE, 425405SHIRPUR WARWADE MUNICIPLE COUNCIL--24 Jul 2023Registered
ROHINI APERTMENTDhule (M Corp.), 424001YOGIRAJ SHIVAJIRAO MARATHE--1 Sep 2017Completed
SAMATA TOWERDEOPUR, 424002SAMATA PROPERTIES--17 Feb 2025Registered
Santkrupa SankulKESHAR NAGAR, 424002Chandrakant Kashinath Kele--31 Aug 2017Completed
SHIV PRERNA APARTMENTMAHINDALE SHIVAR, 424001NAYAN JAGDISH TANEJA--14 Jan 2020Registration lapsed
SHREE GAJANAN HEIGHTSDHULE, 424002SACHIN DEVELOPERS - ---11 Apr 2022Completed
SHRI CHATRAPATI SHIVAJI MAHARAJ VYAPARI SANKOOLDhule (M Corp.), 424001BORSE BROTHERS ENGINEERS AND CONTRACTORS PRIVATE LIMITED--19 Aug 2017Completed
SHRI KRISHNA APARTMENTDhule, 424004PRASHANT DEVELOPERS--24 Aug 2017Completed
SHRI KRISHNA VRINDAVANDEOPUR, 424005SOHAM CONSTRUCTION--10 Feb 2022Registration lapsed
Planning a launch in Dhule? The area market report packs one pincode's whole filed market into one document: every registration and what it has become, when the active stock promises to land, what the market absorbs, the operators and who finances them. A flat Rs 2,999 per pincode. Area report · Rs 2,999  Read a full sample

Developers active in Dhule

PARAG SUBHASH AHIRE (6), PIYUSH LIFESPACES PRIVATE LIMITED (3), RAJENDRA VASANTRAO KHANKARI (3), Divine Infrastructure (2), JAI SHREEKRISHNA DREAM HOMES BUILDERS AND DEVELOPERS (2), BORSE BROTHERS ENGINEERS AND CONTRACTORS PRIVATE LIMITED (2). Each link opens the promoter's track record built from their own filings.

Frequently asked questions

How do I shortlist among the Dhule projects listed above?

Compare each project against its neighbours, not against the brochure. The median project on this page is 30% booked, which is the benchmark to hold any single project against. A project selling much slower than the district may have a pricing or credibility problem; one selling much faster deserves a look at whether construction is keeping pace with collections. Then open the developer link to check their delivery record on other projects, and compare filed carpet areas rather than super built-up marketing areas.

What does a revised completion date on a Dhule project actually mean?

The promoter has moved their deadline with the regulator, usually under section 6, which allows an extension of up to one year for reasons beyond their control. It does not move the date in your agreement for sale: your section 18 claim for delay interest or refund runs from the possession date you signed for. Before booking a project with a revision on record, ask which approvals or works the new date depends on.

What stamp duty will I pay on a flat in Dhule district?

The rate depends on the local body: roughly 6 to 7 percent inside municipal corporations, 4 percent in municipal council areas and 3 percent in gram panchayat areas, with women buying in their sole name paying 1 percent less. The registration fee is 1 percent of value, capped at Rs 30,000. Duty is charged on the higher of your agreement value and the ready reckoner value. ReraGenie has a free Maharashtra stamp duty calculator under Tools.

What does it mean that some Dhule registrations have lapsed?

A RERA registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then, the registration lapses and the project stops being a registered project: the promoter may not legally market or sell in it, and the Authority can act under section 7 against a defaulting promoter. It does not cancel your agreement for sale or your section 18 rights if you have already booked, and it does not mean construction has stopped. Ask the promoter for the current registration position in writing, and verify it on the MahaRERA portal before you pay any further instalment.

What if a Dhule project shows strong sales but slow construction?

That shape means the promoter is collecting money faster than they are building, which is fine under a disciplined promoter and dangerous under a stretched one. The law helps: withdrawals from the project account need architect, engineer and CA certificates in proportion to progress. Check the promoter's delivery record, and watch the next quarterly filing (due within 20 days of each quarter end) to see whether the construction line moves.

Does something here look wrong, or is there a number you expected to find and did not? Every figure on this page is summed from the projects' own MahaRERA filings, and we read every report.

Report an errorShare feedback

Data from official MahaRERA filings.

Report an error or share feedback

About Dhule district. Every figure on this page is summed from the projects' own filings, so if a number looks wrong it helps to say which one.