Home / Browse projects / Dhule, Maharashtra / SHREE GAJANAN HEIGHTS
SHREE GAJANAN HEIGHTS
RG-MH-14821 · RERA P49800034502 · Last updated on MahaRERA portal: 6 Oct 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Dhule registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GAJANAN HEIGHTS is a Residential / Group Housing project by SACHIN DEVELOPERS - - in Dhule, Maharashtra, registered with MahaRERA as P49800034502 on 11 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.
At a glance
Project
- NameSHREE GAJANAN HEIGHTS
- TypeResidential / Group Housing
- Location
- DEOPUR DHULE
- DHULE
- 424002
- Pincode424002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49800034502
- ReraGenie IDRG-MH-14821
Builder
- NameSACHIN DEVELOPERS - -
- Entity typeIndividual
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Apr 2022
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed129 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE GAJANAN HEIGHT | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SHREE GAJANAN HEIGHT: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed9
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SACHIN DEVELOPERS | Dhule (M Corp.) | Dhule |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MIHIR BHAVSAR |
| Engineer | ABHAY BHADLIKAR |
| Chartered Accountant | SHANKAR RIZWANI |
| Partner | Role in project |
|---|---|
| SACHIN DEVELOPERS - - | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Oct 2024
Documents filed129
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Muncipal complition certificate.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer 05 jully 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 13 mar 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 29 june 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 29 sep 2023.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 30 apr 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 30 apr 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 30 dec 24.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Architect 13 mar 23.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 05 jully 24.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 1 apr 2023.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 02 oct 2023.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 05 apr 2024.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer 05 jan 24.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer 05 jully 2023.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 31 march 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 30 jun 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 30 sep 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 31 dec 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA 31 mar 2024.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 30 jun 2024.pdf | 6 Oct 2024 |
| Other - TechnicalFile: Muncipal complition certificate.pdf | 6 Oct 2024 |
| Foreclosure of the ProjectFile: Muncipal complition certificate.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 29 jun 24.pdf | 6 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Muncipal complition certificate.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer 05 jully 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 13 mar 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 29 june 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 29 sep 2023.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 30 apr 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 30 apr 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 30 dec 24.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Architect 13 mar 23.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 05 jully 24.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 1 apr 2023.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 02 oct 2023.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 05 apr 2024.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer 05 jan 24.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer 05 jully 2023.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 31 march 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 30 jun 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 30 sep 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 31 dec 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA 31 mar 2024.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 30 jun 2024.pdf | 6 Oct 2024 |
| Other - TechnicalFile: Muncipal complition certificate.pdf | 6 Oct 2024 |
| Foreclosure of the ProjectFile: Muncipal complition certificate.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 29 jun 24.pdf | 6 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Muncipal complition certificate.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer 05 jully 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 13 mar 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 29 june 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 29 sep 2023.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 30 apr 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 30 apr 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 30 dec 24.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Architect 13 mar 23.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 05 jully 24.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 1 apr 2023.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 02 oct 2023.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer 05 apr 2024.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer 05 jan 24.pdf | 6 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer 05 jully 2023.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 31 march 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 30 jun 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 30 sep 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 31 dec 23.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA 31 mar 2024.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA 30 jun 2024.pdf | 6 Oct 2024 |
| Other - TechnicalFile: Muncipal complition certificate.pdf | 6 Oct 2024 |
| Foreclosure of the ProjectFile: Muncipal complition certificate.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 29 jun 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 13 mar 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 29 june 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 29 sep 2023.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 30 apr 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 30 apr 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 30 dec 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect 29 jun 24.pdf | 6 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Muncipal complition certificate.pdf | 6 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dhule
Computed across the 71 Dhule projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 129 filed documents as one ZIP, foldered, with a manifest
Keep SHREE GAJANAN HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHULE71 in Dhule
Filed coordinates, straight-line distance. 18 registered projects within 2 km.
SHIVAM PLAZA
ALKA VASANTRAO WANKHEDE
Bhalchandra Regency
Om Shiv Infra
Nakshatram Athashri
Divine Infrastructure
Dreams Anuram
Dream House Builders And Developers
Dream's GTP
New Dream House Builders and Developers
NAKSHATRA AVENUE
DHARMNITI CONSTRUCTION PRIVATE LIMITED
See every Dhule project, with the district possession charts
Builder: SACHIN DEVELOPERS - -
SACHIN DEVELOPERS - - has 2 registrations on MahaRERA, including SHREE GAJANAN HEIGHTS and CHAANDRAI GALAXY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Dhule district page.
Frequently asked questions
What are my rights if SHREE GAJANAN HEIGHTS is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GAJANAN HEIGHTS?
The registered promoter entity is SACHIN DEVELOPERS - -, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GAJANAN HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE GAJANAN HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GAJANAN HEIGHTS?
The professionals named in the filing: Architect: MIHIR BHAVSAR; Engineer: ABHAY BHADLIKAR; Chartered Accountant: SHANKAR RIZWANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GAJANAN HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.