Home / Browse projects / Dhule, Maharashtra / BRAHMAKAMAL

Completed No litigation declared Residential / Group Housing project

BRAHMAKAMAL

By PIYUSH LIFESPACES PRIVATE LIMITED

RG-MH-39823 · RERA P49800022200 · Last updated on MahaRERA portal: 15 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 9 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Dhule registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

BRAHMAKAMAL is a Residential / Group Housing project by PIYUSH LIFESPACES PRIVATE LIMITED in Dhule, Maharashtra, registered with MahaRERA as P49800022200 on 5 Sep 2019. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameBRAHMAKAMAL
  • TypeResidential / Group Housing
  • Location
    • JAIHIND COLONY
    • DEOPUR
    • Dhule (M Corp.)
    • Dhule
    • 424002
  • Pincode424002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49800022200
  • ReraGenie IDRG-MH-39823

Builder

  • NamePIYUSH LIFESPACES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorSHARAD SADASHIV DESALE
  • Managing DirectorSANJAY SADASHIV DESALE
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects18 →

Key dates

this monthRegisteredSep 2019PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Sep 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BRAHMAKAMALNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BRAHMAKAMAL: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities20

As on 15 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
SOLAR WATER HEATING SYSTEMYes100%
MAIN ENTRANCE GATES RAMP OUTSIDE OF ITYes100%
LIFT ELEVATORYes100%
INTERCOM SYSTEMYes100%
CCTVYes100%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area543 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
PIYUSH LIFESPACES PRIVATE LIMITEDDhule (M Corp.)Dhule
SMT SUNANDA VINAYAK PATILDhule (M Corp.)Dhule
MISS MANISHA SURESH VALVIVasai-Virar City (M Corp)Palghar
MR MANDAR VINAYAK PATILDhule (M Corp.)Dhule

Approvals and building plan

Permissible FSI960.84
Proposed, not sanctioned961 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLANE NO 04 PANDIT DINDAYAL UPADHYE MARG DHULE 424001

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR RAJENDRA SWARUPCHAND CHHAGED
ArchitectMR MILIND SHYAMSUNDER RATHI
EngineerMR ABHAY RAVINDRA BOBDE
EngineerMR RAJENDRA SWARUPCHAND CHHJED
Chartered AccountantMR ANIL MADHUSUDAN GUJRATI
Chartered AccountantMR SHRIRAM KESHAV DESHPANDE
PartnerRole in project
PIYUSH LIFESPACES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Jun 2022

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: BRAHMAKAMAL STATUS OF CONVEYANCE 14 APRIL 2025.pdf15 Apr 2025
Status of ConveyanceFile: BR STATUS OF CONVEYANCE APRIL 25.pdf11 Apr 2025
Status of ConveyanceFile: BRAHMAKAMAL STATUS OF CONV.pdf13 Jan 2025
Status of ConveyanceFile: BR Status Of Conveyance October 2024.pdf11 Oct 2024
Status of ConveyanceFile: BR Status Of Conveyance October 2024.pdf11 Oct 2024
Status of ConveyanceFile: Status of Conveyance BR June 24.pdf6 Jul 2024
Status of ConveyanceFile: Status Of Conveyance BR March 2024.pdf3 Apr 2024
Status of ConveyanceFile: STATUS OF CONVEYANCE BRAHMAKAMAL DECEMBER 2023.pdf10 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate Brahmakamal.pdf25 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Certificate BR Sept 23.pdf21 Oct 2023
Proforma of Agreement for saleFile: Declaration Regarding proforma of agreement for sale BR sept 23.pdf21 Oct 2023
Deviation Report with respect to Allotment letterFile: Declaration regarding Deviation report with respect to Allotment Letter.pdf21 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Declaration regarding deviation report with respect to model cooy if agreement to sale BR 21 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inven BR June23.pdf24 Jul 2023
Status of ConveyanceFile: Status of conveyance BR JUNE 23.pdf24 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory BR 22-04-23.pdf22 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory BR APRIL23.pdf22 Apr 2023
Status of ConveyanceFile: STATUS OF CONVEYANCE APRIL23.pdf22 Apr 2023
Details of encumbrances concerned to FinanceFile: 1 B BR 18 01 2023.pdf18 Jan 2023
Details of encumbrances concerned to LegalFile: 1 B BR 18 01 2023.pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A BR 2021 22.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSERE OF INTEREST IN OTHER REAL ESTATE ORGANISATION BR 18 01 2023.pdf18 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A BR 18 01 2023.pdf18 Jan 2023
Status of ConveyanceFile: STATUS OF CONVEYANCE BR 16 01 2023.pdf17 Jan 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 BR 1 June 2022.pdf2 Jun 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY BR.pdf1 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Brahmakamal Apartments.pdf1 Jun 2022
Status of ConveyanceFile: CONVEYANCE LIST 01 06 2022.pdf1 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A BR 201221.pdf19 Jan 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY BR.pdf19 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report BR shweta.pdf15 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200228141873_For_Asset_Based_Search_15_01_2022 Amol deshmukh BR.pdf15 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200228141959_For_Asset_Based_Search_15_01_2022 GEETANJALI KULKARNI BR15 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200228142020_For_Asset_Based_Search_15_01_2022 JAYWANT KULKARNI BR.pd15 Jan 2022
Details of encumbrancesFile: NON ENCUMBRANCE CERTIFICATE BR JJSB.pdf27 Oct 2021
Declaration about Commencement CertificateFile: Form D BR.pdf5 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold and Booked Inventory BR.pdf5 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A 20 07 21.pdf21 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 20 07 21.pdf21 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf21 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf21 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A.pdf7 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A.pdf7 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A.pdf7 Apr 2021
Details of encumbrancesFile: Declartion regarding encumberance.pdf3 Apr 2021
Details of encumbrancesFile: Declartion regarding encumberance.pdf3 Apr 2021
OtherFile: Decl deed after TDR compre.pdf7 Dec 2020
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A.pdf2 Dec 2020
Building plan approvalFile: After TDR SANCTION PLAN BR.pdf11 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: After TDR SANCTION PLAN BR.pdf11 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: After TDR commencement.pdf11 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A 31 08 2020.pdf31 Aug 2020
Details of Restarting of Construction work post lockdownFile: Restarting construction letter.pdf16 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A)File: form 2a.pdf10 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A FEB.pdf14 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A.pdf28 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL CA Certificate form 3.pdf2 Sep 2019
OtherFile: ANNEXURE A BR.pdf30 Aug 2019
Details of encumbrancesFile: Non Encumbrance certificate Bramhakamal.pdf25 Aug 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHI CERTI BR.pdf25 Aug 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTI BR.pdf25 Aug 2019
Proforma of Allotment letterFile: Agreement to sale BR.PDF15 Aug 2019
Declaration in FORM BFile: FORM B COMMON.pdf13 Aug 2019
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A 13 8 19.pdf13 Aug 2019
Layout approvalFile: LAY OUT JAIHIND BR PDF_compressed (1).pdf12 Aug 2019
Building plan approvalFile: N A ORDER BRAMHAKAMAL.pdf12 Aug 2019
Building plan approvalFile: SANCTION PLAN FIRST BR.pdf12 Aug 2019
Building plan approvalFile: SANCTION PLAN (REVISED).pdf12 Aug 2019
PAN CardFile: PLPL PAN.pdf12 Aug 2019
Copy of the legal title reportFile: TITLE CLEARANCE CERTIFICATE BR.pdf12 Aug 2019
Copy of Layout Approval (in case of layout)File: LAY OUT JAIHIND BR PDF_compressed (1).pdf12 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: N A ORDER BRAMHAKAMAL.pdf12 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN FIRST BR.pdf12 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN (REVISED).pdf12 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTI UP TO PLINTH BR.pdf12 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCENCEMENT AFTER PLINTH BR.pdf12 Aug 2019

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
CHANDRAVEL PHASE 3NAKANE ROAD DHULE42CompletedDec 2019Dec 2017
JASMINEJAIHIND COLONY DEOPUR DHULE10CompletedMar 2017Jan 2017
AMRUTVEL PHASE 2VIMALNATH NAGAR STATION ROAD DHULE4CompletedSep 2016Feb 2016
CHANDRAVEL PHASE 2NEAR CHANDRAVEL PHASE 1 VALWADI DHULE25CompletedDec 2015Jun 2015
AMALTASVINAYAK NAGAR DEOPUR DHULE9CompletedMar 2015Dec 2014
MADHUPUSHPABHAVSAR COLONY JAMNAGIRI ROAD DHULE12CompletedDec 2014Sep 2014
SONKALIVIDYAWARDHINI COLONY SAKRI ROAD DHULE12CompletedSep 2014Jun 2014
MADHUKAMINILIC COLONY JAMNAGIRI ROAD DHULE9CompletedSep 2014Jun 2014
BAKULTAGORE COLONY DEOPUR DHULE9CompletedJun 2014Jun 2014

How this compares with Dhule

21%of Dhule projects moved their completion datethis one has not
30%of Dhule registrations have lapsed or been cancelledthis one is completed

Computed across the 71 Dhule projects on ReraGenie, from their own filings.

Keep BRAHMAKAMAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEOPUR71 in Dhule

2 kmBRAHMAKAMALCompleted 8Lapsed / revoked 8Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: PIYUSH LIFESPACES PRIVATE LIMITED

PIYUSH LIFESPACES PRIVATE LIMITED has 3 registrations on MahaRERA, including CHANDRAVEL3 and BRAHMAKAMAL. Its filings disclose 18 earlier MahaRERA projects: declares 18 of 18 past projects completed on time. Read the full track record. See more projects on the Dhule district page.

Frequently asked questions

What are my rights if BRAHMAKAMAL is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BRAHMAKAMAL?

The registered promoter entity is PIYUSH LIFESPACES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BRAHMAKAMAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BRAHMAKAMAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BRAHMAKAMAL?

The professionals named in the filing: Architect: MR RAJENDRA SWARUPCHAND CHHAGED; Architect: MR MILIND SHYAMSUNDER RATHI; Engineer: MR ABHAY RAVINDRA BOBDE; Engineer: MR RAJENDRA SWARUPCHAND CHHJED; Chartered Accountant: MR ANIL MADHUSUDAN GUJRATI; Chartered Accountant: MR SHRIRAM KESHAV DESHPANDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BRAHMAKAMAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BRAHMAKAMAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BRAHMAKAMAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.