Home / Browse projects / Dhule, Maharashtra / Anandvan

Registered No litigation declared Residential / Group Housing project

Anandvan

By Raka Agrawal Builders

RG-MH-23309 · RERA P49800078617 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Dhule registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
223 of 1056Construction stages doneacross 96 buildings; furthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Anandvan is a Residential / Group Housing project by Raka Agrawal Builders in Dhule, Maharashtra, registered with MahaRERA as P49800078617 on 27 Dec 2024. Possession is promised by 31 Mar 2030.

At a glance

Project

  • NameAnandvan
  • TypeResidential / Group Housing
  • Location
    • Awdhan Tikhi Road
    • Awdhan
    • Awadhan (CT)
    • Dhule
    • 424001
  • Pincode424001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P49800078617
  • ReraGenie IDRG-MH-23309

Builder

  • NameRaka Agrawal Builders
  • Entity typePartnership
  • PartnersSushil Pukhraj Raka, Bharat Ghanshyam Agrawal

Key dates

this monthRegisteredDec 2024PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2024
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings96 building records
  • Documents filed80 files

Current status

33.8%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
56NA20000
57NA20000
58NA20000
59NA20000
60NA20000
61NA20000
62NA20000
63NA20000
64NA20000
65NA20000
66NA20000
67NA20000
68NA20000
69NA20000
70NA20000
71NA20000
72NA20000
73NA20000
74NA20000
75NA20000
76NA20000
77NA20000
78NA20000
79NA20000
80NA20000
81NA20000
82NA20000
83NA20000
84NA20000
85NA20000
86NA20000
87NA20000
88NA20000
89NA20000
90NA20000
91NA20000
92NA20000
93NA20000
94NA20000
95NA20000
96NA20000
1NA20000
2NA20000
3NA20000
4NA20000
5NA20000
6NA20000
7NA20000
8NA20000
9NA20000
10NA20000
11NA20000
12NA20000
13NA20000
14NA20000
15NA20000
16NA20000
17NA20000
18NA20000
19NA20000
20NA20000
21NA20000
22NA20000
23NA20000
24NA20000
25NA20000
26NA20000
27NA20000
28NA20000
29NA20000
30NA20000
31NA20000
32NA20000
33NA20000
34NA20000
35NA20000
36NA20000
37NA20000
38NA20000
39NA20000
40NA20000
41NA20000
42NA20000
43NA20000
44NA20000
45NA20000
46NA20000
47NA20000
48NA20000
49NA20000
50NA20000
51NA20000
52NA20000
53NA20000
54NA20000
55NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 96 buildings; the table lists the first 20.

223 of 1056 construction stages are filed complete across 96 buildings. The stage furthest along is Internal walls, at 80%.

5641%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
5741%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
5841%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
5941%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
6041%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
6141%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
6241%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
6341%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
6441%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
6541%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
660%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
670%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
680%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
690%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
700%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
7144%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
7244%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
7344%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
7444%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
7544%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed96

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots96
Open Space96
BuildingOpen SpaceTotal
5611
5711
5811
5911
6011
6111
6211
6311
6411
6511
6611
6711
6811
6911
7011
7111
7211
7311
7411
7511
7611
7711
7811
7911
8011
8111
8211
8311
8411
8511
8611
8711
8811
8911
9011
9111
9211
9311
9411
9511
9611
111
211
311
411
511
611
711
811
911
1011
1111
1211
1311
1411
1511
1611
1711
1811
1911
2011
2111
2211
2311
2411
2511
2611
2711
2811
2911
3011
3111
3211
3311
3411
3511
3611
3711
3811
3911
4011
4111
4211
4311
4411
4511
4611
4711
4811
4911
5011
5111
5211
5311
5411
5511

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,000 sq m
Land owned byThe promoter
Named landownersNone
Declared on24 May 2025

Approvals and building plan

Sanctioning authorityDhule Municipal Corporation
Permissible FSI4593.03
Proposed, not sanctioned4,593 sq m
Buildings approved96
Buildings sanctioned96

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCTS.NO.1461A, SHRI.DATTABARI BHAVAN,MAHARANAPRATAP CHOUK,NEAR SWASTIK CINEMA,, DHULE – 424 001
Estimated costRs 883.74 cr
Cost incurredRs 298.61 cr
Work done33.79%
BuildingWingEstimatedIncurred
56NARs 12.27 crRs 4.15 cr
57NARs 12.27 crRs 4.15 cr
58NARs 12.27 crRs 4.15 cr
59NARs 12.27 crRs 4.15 cr
60NARs 12.27 crRs 4.15 cr
61NARs 12.27 crRs 4.15 cr
62NARs 12.27 crRs 4.15 cr
63NARs 12.27 crRs 4.15 cr
64NARs 12.27 crRs 4.15 cr
65NARs 12.27 crRs 4.15 cr
71NARs 12.27 crRs 4.15 cr
72NARs 12.27 crRs 4.15 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandip Saindane
EngineerNikhil Wagh
Chartered AccountantSuraj Kantilal Bafana
PartnerRole in project
Raka Agrawal Builders-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECTS CERTFICATE.pdf9 May 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE.pdf9 May 2026
Withdrawal Update Form 3File: CA CERTIFICATE MAR 26.pdf9 May 2026
Form 2A (FY 2025-2026)File: Form 2A Signed FY 2526.pdf13 Apr 2026
Withdrawal Update Form 1File: ANANDVAN Form 1 Architect Certificate Dec 25.pdf28 Jan 2026
Withdrawal Update Form 2File: ANANDVAN Form 2 Engineer Certificate Dec 25.pdf28 Jan 2026
Withdrawal Update Form 3File: CA Certificate Dec 25 signed Qtr Signed Dec 25.pdf28 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Sept 25.pdf7 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Sept 25.pdf7 Dec 2025
Withdrawal Update Form 3File: CA Certificate Sept 25.pdf7 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Final 1.pdf26 Sep 2025
Withdrawal Update Form 1File: Architect Certificate.pdf24 Jul 2025
Withdrawal Update Form 1File: Architect Certificate.pdf24 Jul 2025
Withdrawal Update Form 1File: Architect Certificate.pdf24 Jul 2025
Withdrawal Update Form 1File: Architect Certificate.pdf24 Jul 2025
Withdrawal Update Form 1File: Architect Certificate.pdf24 Jul 2025
Withdrawal Update Form 1File: Architect Certificate.pdf24 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf24 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf24 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf24 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf24 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf24 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf24 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf24 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf24 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf24 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf24 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf24 Jul 2025
Withdrawal Update Form 3File: CA Certificate.pdf24 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf4 Jul 2025
Form 1File: ARCHITECT CERTIFICATE.pdf24 May 2025
Form 2File: ENGINEER'S CERTIFICATE.pdf24 May 2025
Form 3File: CA CERTIFICATE DEC 24.pdf24 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf24 May 2025
Form 1File: Architect Certificate.pdf24 May 2025
Form 2File: Engineer Certificate Signed.pdf24 May 2025
Form 3File: CA Certificate_compressed.pdf24 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory.pdf24 May 2025
Architect Certificate29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf29 Apr 2025
Engineer Certificate29 Apr 2025
Engineer Certificate Signed29 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE DEC 24.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf14 Feb 2025
Other - LegalFile: ANNEXURE _A_ Signed.pdf17 Dec 2024
Proforma of Agreement for saleFile: Proforma AFS Final.pdf4 Dec 2024
Copy of the legal title reportFile: Legal Title Report.pdf27 Nov 2024
Details of encumbrances concerned to FinanceFile: legal encumbrance report.pdf27 Nov 2024
Proforma of Allotment letterFile: Allotment Letter Final.pdf27 Nov 2024
Details of encumbrances concerned to LegalFile: legal encumbrance report.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CACERTIFICATERAB_FINAL.pdf10 Nov 2024
Other - LegalFile: 7_12_Merged.pdf10 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf6 Nov 2024
Other - LegalFile: Purchase Deed Raka Builder.pdf6 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: seperate bank account.pdf23 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FomatB-BankAccountConfirmation.pdf22 Oct 2024
Layout approvalFile: Amenities Plan_compressed.pdf14 Oct 2024
Copy of Layout Approval (in case of layout)File: Amenities Plan_compressed.pdf14 Oct 2024
Declaration in FORM BFile: Afedevit_241008_165329_compressed.pdf10 Oct 2024
Deviation Report with respect to Allotment letterFile: Allotment Deviation Report (1).pdf10 Oct 2024
Other - TechnicalFile: ANNEXURE “A”.pdf10 Oct 2024
Deviation Report with respect to model copy of AgreementFile: final deviation agreement to sale.pdf10 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Raka Agrawal Builders unsecured loan disclosure.pdf10 Oct 2024
Building plan approvalFile: C Type Bungalow.pdf8 Oct 2024
Building plan approvalFile: B Type Bungalow.pdf8 Oct 2024
Building plan approvalFile: A Type Bungalow.pdf8 Oct 2024
Layout approvalFile: Plan Layout_compressed.pdf8 Oct 2024
PAN CardFile: Raka Agrawal Builders PAN.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: Letter of ENCUMBRANCE.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: Plan Layout_compressed.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: A Type Bungalow.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: B Type Bungalow.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: C Type Bungalow.pdf8 Oct 2024
Declaration about Commencement CertificateFile: CC declatrationFormat D.pdf8 Oct 2024
CERSAI detailsFile: cersai search report.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: Letter of ENCUMBRANCE.pdf8 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE letter of both partners.pdf8 Oct 2024

How this compares with Dhule

21%of Dhule projects moved their completion datethis one has not
30%of Dhule registrations have lapsed or been cancelledthis one is on the register

Computed across the 71 Dhule projects on ReraGenie, from their own filings.

Keep Anandvan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Awdhan71 in Dhule

Builder: Raka Agrawal Builders

Raka Agrawal Builders has 1 registration on MahaRERA, including Anandvan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Dhule district page.

Frequently asked questions

What are my rights if Anandvan is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anandvan?

The registered promoter entity is Raka Agrawal Builders, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anandvan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anandvan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anandvan?

The professionals named in the filing: Architect: Sandip Saindane; Engineer: Nikhil Wagh; Chartered Accountant: Suraj Kantilal Bafana. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anandvan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anandvan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anandvan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.