Home / Browse projects / Dhule, Maharashtra / CHANDRAVEL3
CHANDRAVEL3
By PIYUSH LIFESPACES PRIVATE LIMITED
RG-MH-00763 · RERA P49800001074 · Last updated on MahaRERA portal: 15 Apr 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 17 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Dhule registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHANDRAVEL3 is a Residential / Group Housing project by PIYUSH LIFESPACES PRIVATE LIMITED in Dhule, Maharashtra, registered with MahaRERA as P49800001074 on 26 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2019.
At a glance
Project
- NameCHANDRAVEL3
- TypeResidential / Group Housing
- Location
- Nakane Road
- chandravel 2
- Walwadi (CT)
- Dhule
- 424001
- Pincode424001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49800001074
- ReraGenie IDRG-MH-00763
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 Jul 2017
- Promised completion31 Dec 2019
- Revised completionNone
- Buildings1 building record
- Documents filed89 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CHANDRAVEL 3 | NA | 42 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
CHANDRAVEL 3: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities17
As on 15 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| SITE DEVELOPMENT OF COMPLETE PROJECT | Yes | 100% |
| COMPOUND WALL AND GATES | Yes | 100% |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| JAYESH RAMJIBHAI JETHWA | Dhule (M Corp.) | Dhule |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJENDRA SWARUPCHAND CHHAJED |
| Engineer | MILIND SHYAMSUNDER RATHI |
| Engineer | RAJENDRA SWARUPCHAND CHHAGED |
| Chartered Accountant | ANIL MADHUSUDAN GUJRATI |
| Chartered Accountant | SHRIRAM KESHAV DESHPANDE |
| Partner | Role in project |
|---|---|
| PIYUSH LIFESPACES PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Aug 2019
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of ConveyanceFile: CW3 STATUS OF CONVEYANCE 14 APRIL 2025.pdf | 15 Apr 2025 |
| Status of ConveyanceFile: CW3 STATUS OF CONVEYANCE APRIL 25.pdf | 11 Apr 2025 |
| Status of ConveyanceFile: CW3 STATUS OF CONV.pdf | 13 Jan 2025 |
| Status of ConveyanceFile: CW3 Status Of Conveyance October 2024.pdf | 11 Oct 2024 |
| Status of ConveyanceFile: CW3 Status Of Conveyance October 2024.pdf | 11 Oct 2024 |
| Status of ConveyanceFile: STATUS OF CONVE CW3 JUNE 24.pdf | 6 Jul 2024 |
| Status of ConveyanceFile: Status of Conveyance as of 31ST MARCH 2024.pdf | 1 Apr 2024 |
| Status of ConveyanceFile: STATUS OF CONVEYANCE CW 3 DECEMBER 2023.pdf | 10 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: 1 B Details of encumbrances concerned to legal Sept CW 3 2023.pdf | 20 Oct 2023 |
| Details of encumbrances concerned to LegalFile: 1 B Details of encumbrances concerned to legal Sept CW 3 2023.pdf | 20 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate OrganisationCW 3 Sep 2023.pdf | 20 Oct 2023 |
| Proforma of Agreement for saleFile: Declaration Regarding Proforma Of Agreement For sale CW3 Sept 2023.pdf | 20 Oct 2023 |
| Status of ConveyanceFile: CW 3 Disclosure of Booked and Sold Inventory Sep2023.pdf | 20 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A separate bank account CW 3 sept 2023.pdf | 20 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: Declaration Regarding Deviation Report with respect to Allotment letter CW 3 Sept 2023.pdf | 20 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement cw3 sept23.pdf | 20 Oct 2023 |
| Status of ConveyanceFile: STATUS OF CONVEYANCE CW3 16 1 2023 (1).pdf | 17 Jan 2023 |
| Status of ConveyanceFile: STATUS OF CONVEYANCE 31 12 2021.pdf | 2 Jun 2022 |
| OtherFile: STATUS OF CONVEYANCE 31 12 2021.pdf | 18 Jan 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200228142390_For_Asset_Based_Search_15_01_2022 Chandravel 3.pdf | 15 Jan 2022 |
| Declaration about Commencement CertificateFile: CW3 FORM D.pdf | 6 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: DECLARATION ABOUT FORM 2A CW3.pdf | 6 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY CW3.pdf | 6 Sep 2021 |
| Status of ConveyanceFile: STATUS OF CONVEYANCE 31 08 2021.pdf | 6 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19 20.pdf | 21 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20 21.pdf | 21 Jul 2021 |
| Status of ConveyanceFile: STATUS OF CONVEYANCE 31 03 21.pdf | 3 Apr 2021 |
| Status of ConveyanceFile: STATUS OF CONVEYANCE 30 11 20.pdf | 7 Dec 2020 |
| Details of Restarting of Construction work post lockdownFile: letter.pdf | 11 Sep 2020 |
| Status of ConveyanceFile: STATUS OF CONVEYANCE 31 08 20.pdf | 11 Sep 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: society registration certificate cw3.pdf | 10 Jun 2020 |
| Status of ConveyanceFile: conveyance list.pdf | 4 Jun 2020 |
| Status of ConveyanceFile: conveyance list.pdf | 15 Feb 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SELF DECL SOCIETY CW3.pdf | 24 Dec 2019 |
| Status of ConveyanceFile: cw3 status of convayance15 11 2019.pdf | 16 Nov 2019 |
| Certificates of CA (Form 5)File: Form5 cw3 2019.pdf | 7 Nov 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5 cw3 2019.pdf | 7 Nov 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM H ARCHITECTS FORM FOR COMPLETION OCCUPANCY CERTIFICATE.pdf | 18 Aug 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A CW3.pdf | 17 Aug 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCU FINAL.pdf | 16 Aug 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION FINAL.pdf | 16 Aug 2019 |
| Architect’s Certificate on Completion of Project (Form 4)File: scan copy oF archicts certificate (form 4) 31 12 17.pdf | 16 Aug 2019 |
| Status of ConveyanceFile: convayance status 16 8 19.pdf | 16 Aug 2019 |
| Status of ConveyanceFile: cw3 convayance status 17 05 19.pdf | 17 May 2019 |
| Status of ConveyanceFile: status of convayance 18 2 19.pdf | 1 Mar 2019 |
| Status of ConveyanceFile: cw 3 status of convayyance 19 11 2018.pdf | 19 Nov 2018 |
| Certificates of CA (Form 5)File: FORM5 CA CERTI PDF.pdf | 22 Sep 2018 |
| OtherFile: Bank NOC- cw-3.pdf | 14 Sep 2018 |
| Status of ConveyanceFile: RERA UPDATE 21 August 2018.pdf | 22 Aug 2018 |
| Status of ConveyanceFile: status of conveyance 21 05 18.pdf | 21 May 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: scan copy of architect certificae 31 12 17.pdf | 16 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: scan copy of engg certificate 31 12 17.pdf | 16 Feb 2018 |
| Certificates of CA (Form 3)File: scan copy of ca certificate 31 12 17.pdf | 16 Feb 2018 |
| OtherFile: COMPLETION FINAL.pdf | 16 Feb 2018 |
| OtherFile: OCCU FINAL.pdf | 16 Feb 2018 |
| OtherFile: ENGG COMPLETION CERTI FINAL.pdf | 16 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate 31 10 17.pdf | 28 Nov 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg certificate 31 10 2017.pdf | 28 Nov 2017 |
| Certificates of CA (Form 3)File: CA certificate 31 10 2017.pdf | 28 Nov 2017 |
| Declaration in FORM BFile: JETHAWA SIR NOTARY.pdf | 25 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHI CERTI.pdf | 19 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 19 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 19 Jul 2017 |
| Layout approvalFile: SCAN LAYOUT CW3 .pdf | 13 Jul 2017 |
| Building plan approvalFile: Plot No 1234.pdf | 13 Jul 2017 |
| Building plan approvalFile: Plot No 6.pdf | 13 Jul 2017 |
| Building plan approvalFile: Plot No 789.pdf | 13 Jul 2017 |
| Building plan approvalFile: Plot No 10.pdf | 13 Jul 2017 |
| Building plan approvalFile: Plot No 11.pdf | 13 Jul 2017 |
| Building plan approvalFile: Plot No 12131415.pdf | 13 Jul 2017 |
| Building plan approvalFile: Plot No 16171819.pdf | 13 Jul 2017 |
| Building plan approvalFile: Plot No 20.pdf | 13 Jul 2017 |
| Building plan approvalFile: Plot No 789.pdf | 13 Jul 2017 |
| PAN CardFile: PLPL PAN.pdf | 13 Jul 2017 |
| Copy of the legal title reportFile: TITLE CLEARANCE CERTI FINAL.pdf | 13 Jul 2017 |
| Details of encumbrancesFile: Encumberance cerificate.pdf | 13 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: SCAN LAYOUT CW3 .pdf | 13 Jul 2017 |
| Building Plan Approval (IOD)File: Plot No 1234.pdf | 13 Jul 2017 |
| Building Plan Approval (IOD)File: Plot No 6.pdf | 13 Jul 2017 |
| Building Plan Approval (IOD)File: Plot No 789.pdf | 13 Jul 2017 |
Promoter's earlier projects17
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| KUSUMVEL | SAKRI ROAD DHULE | 17 | Completed | Mar 2017 | Mar 2013 |
| JASMINE | JAIHIND COLONY DEOPUR DHULE | 10 | Completed | Mar 2017 | Jan 2017 |
| AMRUTVEL PHASE 2 | VIMALNATH NAGAR DHULE | 4 | Completed | Sep 2016 | Feb 2016 |
| CHANDRAVEL PHASE 2 | NEAR CHANDRAVEL PHASE 1 NAKANE ROAD DEOPUR DHULE | 25 | Completed | Dec 2015 | Jun 2015 |
| AMALTAS | WADIBHOKAR ROAD DEOPUR DHULE | 9 | Completed | Mar 2015 | Dec 2014 |
| MADHUPUSHPA | JAMNAGIRI ROAD DHULE | 12 | Completed | Dec 2014 | Sep 2014 |
| SONKALI | VIDYAWARDHINI COLONY SAKRI ROAD DHULE | 12 | Completed | Sep 2014 | Jun 2014 |
| MADHUKAMINI | LIC COLONY DHULE | 9 | Completed | Sep 2014 | Jun 2014 |
| BAKUL | TAGORE COLONY DEOPUR DHULE | 9 | Completed | Jun 2014 | Jun 2014 |
| AMRUTVEL | VIMALNATH NAGAR DHULE | 8 | Completed | Jun 2014 | Mar 2014 |
| JAI JUI | WADIBHOKAR ROAD DEOPUR DHULE | 2 | Completed | Jun 2013 | Mar 2013 |
| CHAFEKALI | WADIBHOKAR ROAD DEOPUR DHULE | 2 | Completed | Jun 2013 | Mar 2013 |
| MADHULATA | VAIBHAV NAGAR JAMNAGIRI ROAD DHULE | 5 | Completed | Sep 2012 | Mar 2012 |
| MADHUMANDAR | VAIBHAV NAGAR JAMNAGIRI ROAD DHULE | 8 | Completed | Jun 2012 | Mar 2012 |
| FULRANI | Nutan Krushi Colony Sakri road Dhule | 5 | Completed | Mar 2012 | Jan 2012 |
| RAJNIGANDHA | Mahatmaji Nagar Sakri road Dhule | 5 | Completed | Jun 2011 | Mar 2011 |
| CHANDRAVEL | Nakane Road Deopur Dhule | 15 | Completed | Dec 2010 | Nov 2010 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dhule
Computed across the 71 Dhule projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
Keep CHANDRAVEL3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near chandravel 271 in Dhule
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
MARUTI NANDAN BUSINESS HUB
SANJAY NANDKISHOR AGRAWAL
ASHTAVINAYAK NAGAR
ASHTAVINAYAK LAND DEVELOPERS
VRUNDAVAN PLAZA
VRUNDAVAN BUILDCON
SURYA RESIDENCY
M/s Concept Builder And Developers
KALINDI APARTMENT
SHRIRANG DEVELOPERS
PADMASHREE RESIDENCY VI
PARAG SUBHASH AHIRE
See every Dhule project, with the district possession charts
Builder: PIYUSH LIFESPACES PRIVATE LIMITED
PIYUSH LIFESPACES PRIVATE LIMITED has 3 registrations on MahaRERA, including CHANDRAVEL3 and BRAHMAKAMAL. Its filings disclose 18 earlier MahaRERA projects: declares 18 of 18 past projects completed on time. Read the full track record. See more projects on the Dhule district page.
Frequently asked questions
What are my rights if CHANDRAVEL3 is delayed beyond 31 Dec 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHANDRAVEL3?
The registered promoter entity is PIYUSH LIFESPACES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHANDRAVEL3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CHANDRAVEL3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHANDRAVEL3?
The professionals named in the filing: Architect: RAJENDRA SWARUPCHAND CHHAJED; Engineer: MILIND SHYAMSUNDER RATHI; Engineer: RAJENDRA SWARUPCHAND CHHAGED; Chartered Accountant: ANIL MADHUSUDAN GUJRATI; Chartered Accountant: SHRIRAM KESHAV DESHPANDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHANDRAVEL3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback