Home / Browse projects / Dhule, Maharashtra / KRUSHNA KUNJ HEIGHTS
KRUSHNA KUNJ HEIGHTS
By JAI SHREEKRISHNA DREAM HOMES BUILDERS AND DEVELOPERS
RG-MH-79662 · RERA P49800048814 · Last updated on MahaRERA portal: 3 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Dhule registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KRUSHNA KUNJ HEIGHTS is a Residential / Group Housing project by JAI SHREEKRISHNA DREAM HOMES BUILDERS AND DEVELOPERS in Dhule, Maharashtra, registered with MahaRERA as P49800048814 on 19 Jan 2023. Possession was promised by 21 Sep 2026 and is now 1 months past that date. The completion date has moved by 12 months from the original filing. 9 of the 20 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameKRUSHNA KUNJ HEIGHTS
- TypeResidential / Group Housing
- Location
- CTS NO-4783
- PLOT NO-08
- SURVEY NO-40/2/B DEOPUR DHULE
- NEAR AGRA ROAD GTP STOP AREA DEOPUR DHULE
- Dhule (M Corp.)
- Dhule
- 424002
- Pincode424002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P49800048814
- ReraGenie IDRG-MH-79662
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Jan 2023
- Promised completion21 Sep 2026
- Revised completionRevised to 21 Sep 2026 (originally 21 Sep 2025)
- Buildings1 building record
- Documents filed114 files
Current status
Figures as on 3 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KRUSHNA KUNJ HEIGHTS | NA | 6 | 5 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
KRUSHNA KUNJ HEIGHTS: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed7
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| JAI SHREE KRISHNA DREAM HOMES BUILDERS AND DEVELOP | Dhule (M Corp.) | Dhule |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| KRUSHNA KUNJ HEIGHTS | NA | Rs 2.92 cr | Rs 2.69 cr |
| - | NA | Rs 13.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BHUPESH RAMKRUSHNA PATIL |
| Engineer | KALPESH BHAUSAHEB KACHAVE |
| Chartered Accountant | CA DIVYA P SABDRA |
| Chartered Accountant | P N Sabadra & associates |
| Chartered Accountant | RSPH & Associates |
| Partner | Role in project |
|---|---|
| JAI SHREEKRISHNA DREAM HOMES BUILDERS AND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to slow sale of flats, The construction cost was spend by developer
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Aug 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Aug 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Cirtificate.pdf | 3 Aug 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 3 Aug 2026 |
| Withdrawal Update Form 3File: CA June-2026.pdf | 3 Aug 2026 |
| Withdrawal Update Form 1File: Architect Certificate .pdf | 8 May 2026 |
| Withdrawal Update Form 2File: Engineer Certificate .pdf | 8 May 2026 |
| Withdrawal Update Form 3File: CA Certificate final.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: AR-Dec 25.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: ER - Dec 25.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: CA-Dec-25.pdf | 27 Feb 2026 |
| Form 5 (FY 2024-2025)File: JSK Rera Audit.pdf | 18 Dec 2025 |
| Withdrawal Update Form 1File: Architect Cirtificate Sep 2025.pdf | 27 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Cirtificate.pdf | 27 Nov 2025 |
| Withdrawal Update Form 3File: CA Cirtificate sept 25 final.pdf | 27 Nov 2025 |
| Form 5 (FY 2023-2024)File: RERA AUDIT REPORT 2023-2024 final (2).pdf | 5 Sep 2025 |
| Form 2A (FY 2024-2025)File: 31.03.2024.pdf | 4 Sep 2025 |
| Form 2A (FY 2023-2024)File: 31.03.2025.pdf | 4 Sep 2025 |
| Form 1File: Architect Certificate 30062025.pdf | 18 Aug 2025 |
| Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf | 12 Aug 2025 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 12 Aug 2025 |
| Building plan approval or NA orderFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 12 Aug 2025 |
| Declaration and undertaking (Annexure A)File: 1 Other - Legal.pdf | 12 Aug 2025 |
| Form 2File: ER Certificate.pdf | 12 Aug 2025 |
| Form 3File: CA Certificate-June-25 final.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure jun 25.pdf | 12 Aug 2025 |
| Form 1File: Architect Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Form 2File: Engineer Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Form 3File: Final CA Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure March 25.pdf | 17 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure March 25.pdf | 17 May 2025 |
| Form 1File: Architect Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Form 2File: Engineer Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Form 3File: Final CA Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Form 1File: Architect Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Form 2File: Final CA Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Form 3File: Engineer Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure March 25.pdf | 17 May 2025 |
| Form 1File: Disclosure March 25.pdf | 17 May 2025 |
| Form 2File: Architect Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Form 3File: Engineer Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Final CA Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Form 2File: Architect Cirtificate 31 March 2025.pdf | 17 May 2025 |
| Form 3File: Disclosure March 25.pdf | 17 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cirtificate December 2024.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cirtificate Dec 2024_Final.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cirtificate December 2024.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD OR BOOKED INVENTORY(1).pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD OR BOOKED INVENTORY.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA AUDIT REPORT 2023-2024 final.pdf | 8 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate Sept 24 final.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cirtificate.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cirtificate.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked Inventory.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cirtificate 30 JUNE 2024.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cirtificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Bookd And Sold Inventory .pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cirtificate.pdf | 20 Jul 2024 |
| Other - FinanceFile: Rera Ac.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Cert Mar 2024.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD AND BOOKD INVENTORY .pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mar 2024_signed.pdf | 20 Apr 2024 |
| Other - TechnicalFile: Form 2A Upto 31 March 2024.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CIRTIFICATE 31 MARCH 2024.pdf | 12 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD AND BOOKD INVENTORY .pdf | 12 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: FOR QUARTER UPDATION.pdf | 12 Apr 2024 |
| Other - FinanceFile: RERA BANK ACCOUNT STATEMENT .pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CIRTIFICATE .pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cirtificate.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Dec 2023 final.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CIRTIFICATE .pdf | 11 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 11 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cirtificate 30 June 2023.pdf | 23 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cirtificate New 31March 2023.pdf | 23 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Jai Shree Krishna-Signed Copy.pdf | 25 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cirtificate 30092023-final (1).pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cirtificate 30 Sep 2023.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed_jcdh Sep 23.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CIRTIFICATE 31 March 2023.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CIRTIFICATE 30 June 2023.pdf | 19 Oct 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| GOVARDHAN HEIGHTSP49800021525 | SAMRAT NAGAR, Dhule | Jul 2019 | Completed | Jul 2022 | Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dhule
Computed across the 71 Dhule projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KRUSHNA KUNJ HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR AGRA ROAD GTP STOP AREA DEOPUR DHULE71 in Dhule
Filed coordinates, straight-line distance. 14 registered projects within 2 km.
SHIVAM PLAZA
ALKA VASANTRAO WANKHEDE
Bhalchandra Regency
Om Shiv Infra
Nakshatram Athashri
Divine Infrastructure
Dreams Anuram
Dream House Builders And Developers
Dream's GTP
New Dream House Builders and Developers
NAKSHATRA AVENUE
DHARMNITI CONSTRUCTION PRIVATE LIMITED
See every Dhule project, with the district possession charts
Builder: JAI SHREEKRISHNA DREAM HOMES BUILDERS AND DEVELOPERS
JAI SHREEKRISHNA DREAM HOMES BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including GOVARDHAN HEIGHTS and KRUSHNA KUNJ HEIGHTS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Dhule district page.
Frequently asked questions
What are my rights if KRUSHNA KUNJ HEIGHTS is delayed beyond 21 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KRUSHNA KUNJ HEIGHTS?
The registered promoter entity is JAI SHREEKRISHNA DREAM HOMES BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KRUSHNA KUNJ HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KRUSHNA KUNJ HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KRUSHNA KUNJ HEIGHTS?
The professionals named in the filing: Architect: BHUPESH RAMKRUSHNA PATIL; Engineer: KALPESH BHAUSAHEB KACHAVE; Chartered Accountant: CA DIVYA P SABDRA; Chartered Accountant: P N Sabadra & associates; Chartered Accountant: RSPH & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KRUSHNA KUNJ HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback