Registered No litigation declared Residential / Group Housing project

FLAMANTE BY VTP LUXE PHASE 1

By INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITED

RG-MH-77075 · RERA P52100051826 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • 13 complaints at MahaRERA
  • Rs 270.00 crore secured on the land, in favour of Piramal Finance Limited

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
9 of 44Construction stages doneacross 4 buildings; furthest along: Plinth, 82%
35 of 660Units unsoldnot recorded sold or booked
13Complaints at MahaRERAon this registration
Jump to the 163 documents Report an error

FLAMANTE BY VTP LUXE PHASE 1 is a Residential / Group Housing project by INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100051826 on 7 Jul 2023. Possession is promised by 31 Mar 2028. 625 of the 660 units on this registration are recorded sold or booked, and 9 of 44 construction stages are filed complete. 13 complaints are on record with the regulator.

At a glance

Project

  • NameFLAMANTE BY VTP LUXE PHASE 1
  • TypeResidential / Group Housing
  • Location
    • 24 M DP ROAD
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100051826
  • ReraGenie IDRG-MH-77075

Builder

  • NameINTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsBHUSHAN VILAS KUMAR PALRESHA, NILESH VILAS KUMAR PALRESHA, ATUL ASHOK CHORDIA
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jul 2023
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed163 files

Current status

95%625 of 660 units booked
36.2%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1NA35331320132
TOWER 2NA37331980198
TOWER 3NA37331980198
TOWER 4NA36331320132

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Plinth, at 82%.

TOWER 117%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth82%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.1%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 223%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 328%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure11%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 429%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure14%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed250

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots250
Closed/Covered210
Open Space40
BuildingClosed/CoveredOpen SpaceTotal
TOWER 1501060
TOWER 2501060
TOWER 3601070
TOWER 4501060

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,551 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofPiramal Finance Limited
Secured amountRs 270.00 crore
CERSAI search filedYes
Declared on22 Aug 2025

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGIONAL AUTHORITY PUNE
Permissible FSI84570.88
Proposed, not sanctioned82,571 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIMAN NAGAR, PUNE
Estimated costRs 373.40 cr
Cost incurredRs 135.28 cr
Work done36.23%
BuildingWingEstimatedIncurred
TOWER 1NARs 105.37 crRs 8.50 cr
TOWER 4NARs 87.22 crRs 57.37 cr
TOWER 2NARs 85.49 crRs 19.12 cr
TOWER 3NARs 79.08 crRs 38.25 cr
-NARs 16.23 crRs 12.04 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK design & projects Pvt. Ltd.
ArchitectANA Consortium Pvt Ltd
EngineerGirish Awinashe
EngineerSachin Bhatkande
Chartered AccountantAmit Shinghvi
Chartered AccountantPushpa Bogati
Chartered AccountantPriyanka Chordiya & Associates
PartnerRole in project
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITED-

Complaints filed with MahaRERA13

Case no.ComplainantRespondentFiled
CC005000000269452Mahendra Ramrao PalkhadeVTP Flamante26/09/2023
CC005000000340757Manish SrivastavaVTP Flamante11/04/2024
CC12400786INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDRUPESH SAHEBRAO BENDREPATIL15/11/2024
CC12600622INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDRUPESH SAHEBRAO BENDREPATIL03/02/2026
CC12602912INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDANKITA VIVIDH DHAMNE18/05/2026
CC12602913INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDANITA SONI18/05/2026
CC12602914INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDPALASH SANJAY SONI18/05/2026
CC12602916INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDPALASH SANJAY SONI18/05/2026
CC12602917INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDSHIVAPUTRA RACHANNA KALAGIKAR18/05/2026
CC12603095INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDANIL BANKAT POTBHARE25/05/2026
CC12603096INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDANANT VILASRAO CHINTAMANI25/05/2026
CC12603365INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDGOVIND ULHAS RATHOD02/06/2026
CC12603366INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITEDSOMINATH DNYANDEO TANPURE02/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed163

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 163 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Flamante Phase 1 .pdf19 Jun 2026
Withdrawal Update Form 1File: FORM 1 Flamante Ph 1 07042026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - Flamante - Phase 1.pdf20 Apr 2026
Withdrawal Update Form 3File: C Form 3 Flamante ph 1 30032026.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 Flamante Phase 1 08012026.pdf19 Jan 2026
Withdrawal Update Form 2File: FORM 2 FLAMANTE PH 1 31122025.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 Flamante Phase 1 31122025 compressed.pdf19 Jan 2026
Withdrawal Update Form 1File: FORM 1 FLAMANTE PHASE 1 30092025.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2 FLAMANTE PHASE 1.pdf17 Oct 2025
Withdrawal Update Form 3File: FORM 3 Flamante Phase 1 3092025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 FLAMANTE PHASE 1.pdf27 Aug 2025
Form 2A (FY 2024-2025)File: FORM 2A FLAMANTE PHASE 1.pdf30 Jun 2025
Form 1File: FORM 1 FLAMANTE PHASE 1 31032025.pdf22 May 2025
Form 2File: FORM 2 FLAMANATE PHASE 1 31032025.pdf22 May 2025
Form 3File: FORM 3 FLAMANTE PHASE 1 31032025.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: FLAMANTE PH1 31032025.pdf22 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FLAMANTE PHASE 1 31032025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Flamante Phase I.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE PHASE 1 31032025.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: FLAMANTE PH1 31032025.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FLAMANTE BY VTP LUXE PH 1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FLAMANTE- PHASE 1 AND PHASE 2 FORM 2 COPY-1-4.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FLAMANTE BY VTP LUXE PH 1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FLAMANTE- PHASE 1 AND PHASE 2 FORM 2 COPY-1-4.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FLAMANTE BY VTP LUXE PH 1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FLAMANTE- PHASE 1 AND PHASE 2 FORM 2 COPY-1-4.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE PHASE 1 31122024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE PHASE 1 31122024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE PHASE 1 31122024.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: FLAMANTE PHASE 1 31122024.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: FLAMANTE PHASE 1 31122024.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: FLAMANTE PHASE 1 31122024.pdf9 Jan 2025
Details of encumbrances concerned to FinanceFile: Flamante Phase 1 - Piramal.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: Flamante Phase 1 - Piramal.pdf15 Nov 2024
Details of encumbrances concerned to FinanceFile: Flamante Phase 1 - Piramal.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: Flamante Phase 1 - Piramal.pdf15 Nov 2024
Details of encumbrances concerned to FinanceFile: Flamante Phase 1 - Piramal.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: Flamante Phase 1 - Piramal.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Flamante By Vtp Luxe P 1 300624.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FLAMANTE PHASE 1 30092024.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Flamante By Vtp Luxe P 1 300624.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FLAMANTE PHASE 1 30092024.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Flamante By Vtp Luxe P 1 300624.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FLAMANTE PHASE 1 30092024.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE PHASE 1 30092024.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: FLAMANTE PH1 30092024.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE PHASE 1 30092024.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: FLAMANTE PH1 30092024.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE PHASE 1 30092024.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: FLAMANTE PH1 30092024.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ph1.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ph1.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ph1.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 FLAMANTE by VTP LU)G PH 1 31-03-2024_compressed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 FLAMANTE by VTP LU)G PH 1 31-03-2024_compressed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 FLAMANTE by VTP LU)G PH 1 31-03-2024_compressed.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FLAMANTE PHASE 1 19072024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FLAMANTE PHASE 1 30062024.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Flamante By Vtp Luxe P 1 300624.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: FLAMANTE 1 30062024.pdf9 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FLAMANTE PHASE 1 31032024.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: INVENTORY FLAMANTE PHASE 1 31032024.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FLAMANTE PHASE 1 31032024.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FLAMANTE PHASE 1 31032024.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE PHASE 1 31032024.pdf4 Apr 2024
Disclosure of sold/ booked inventoryFile: INVENTORY FLAMANTE 31122023.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE 30092023.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE 24112023.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE 21122023.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE 31122023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FLAMANTE 30092023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FLAMANTE 22112023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FLAMANTE 22122023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FLAMANTE 31122023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FLAMANTE 22112023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FLAMANTE 21122023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FLAMANTE 31122023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FLAMANTE 30092023 -.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FLAMANTE 30092023.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FLAMANTE 12092023.pdf28 Sep 2023

How this compares with Pune

95%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep FLAMANTE BY VTP LUXE PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

Builder: INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITED

Integrated Business Ecosystem Private Limited has 3 registrations on MahaRERA, including VTP ALTAIR and FLAMANTE BY VTP LUXE PHASE 1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if FLAMANTE BY VTP LUXE PHASE 1 is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLAMANTE BY VTP LUXE PHASE 1?

The registered promoter entity is INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLAMANTE BY VTP LUXE PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against FLAMANTE BY VTP LUXE PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for FLAMANTE BY VTP LUXE PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLAMANTE BY VTP LUXE PHASE 1?

The professionals named in the filing: Architect: VK design & projects Pvt. Ltd.; Architect: ANA Consortium Pvt Ltd; Engineer: Girish Awinashe; Engineer: Sachin Bhatkande; Chartered Accountant: Amit Shinghvi; Chartered Accountant: Pushpa Bogati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLAMANTE BY VTP LUXE PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLAMANTE BY VTP LUXE PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLAMANTE BY VTP LUXE PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.