Home / Browse projects / Pune, Maharashtra / Yashraj Nakshatra Phase 2

Registered No litigation declared Residential / Group Housing project

Yashraj Nakshatra Phase 2

By VISHWAS KALURAM TUPE

RG-MH-58295 · RERA P52100055454 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 25.00 crore secured on the land, in favour of M/s Hero FinCorp Ltd
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Staircases, 96%
63 of 157Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

Yashraj Nakshatra Phase 2 is a Residential / Group Housing project by VISHWAS KALURAM TUPE in Pune, Maharashtra, registered with MahaRERA as P52100055454 on 22 Mar 2024. Possession is promised by 31 Dec 2027. 94 of the 157 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameYashraj Nakshatra Phase 2
  • TypeResidential / Group Housing
  • Location
    • Near Shriram Chowk
    • Yashraj Primo
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055454
  • ReraGenie IDRG-MH-58295

Builder

  • NameVISHWAS KALURAM TUPE
  • Entity typeIndividual
  • GSTIN27AAJPT0478J1Z6
  • Other registrations3 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Mar 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed118 files

Current status

60%94 of 157 units booked
71.7%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA24201570157

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 96%.

Wing B: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises76%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.64%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed248

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots248
Closed/Covered248

Land and ownership6

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,842 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared present
Charge in favour ofM/s Hero FinCorp Ltd
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on4 Oct 2024
LandownerVillageDistrict
Santosh Kisan TupeHadapsarPune
Sunita Ramesh GhogareHadapsarPune
Sangeeta Bhagwaan JagtapHadapsarPune
Anita Dattatray LonkarHadapsarPune
Sushila Kisan TupeHadapsarPune
suhasini Arvind JagtapHadapsarPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI12706.4
Proposed, not sanctioned12,706 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUG Floor, The Destination Centre, Magarpatta, Hadapsar, Pune 411028
Estimated costRs 42.36 cr
Cost incurredRs 30.39 cr
Work done71.74%
BuildingWingEstimatedIncurred
Wing BNARs 39.72 crRs 28.27 cr
-NARs 2.64 crRs 2.11 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMalwadkar Architects Pvt ltd
EngineerSunil Ashok Wakure
EngineerPrafulla Lade
Chartered AccountantA M kale and Associates
Chartered AccountantVKPS & ASSOCIATES
Chartered AccountantMahajan & Bhapkar Chartered Accountants
PartnerRole in project
VISHWAS KALURAM TUPE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jun 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A 2025-26 Phase-2.pdf23 Jun 2026
Form 2A (FY 2024-2025)File: Form2A Phase-2 2024-25.pdf22 Jun 2026
Withdrawal Update Form 1File: 25-26 Q4 Form1 Phase2.pdf11 May 2026
Withdrawal Update Form 2File: 25-26 Q4 Form2 Phase2.pdf11 May 2026
Withdrawal Update Form 3File: 25-26 Q4 Form3 Phase2.pdf11 May 2026
Withdrawal Update Form 1File: 25-26 Q3 Form1 Phase2.pdf12 Feb 2026
Withdrawal Update Form 2File: 25-26 Q3 Form2 Phase2 (1).pdf12 Feb 2026
Withdrawal Update Form 3File: 25-26 Q3 Form3 Phase2.pdf12 Feb 2026
Form 5 (FY 2024-2025)File: 24-25 Form 5 Phase 2 final.pdf31 Dec 2025
Withdrawal Update Form 1File: 25-26 Q2 Form1 Phase2.pdf30 Dec 2025
Withdrawal Update Form 2File: 25-26 Q2 Form2 Phase2.pdf30 Dec 2025
Withdrawal Update Form 3File: 25-26 Q2 Form3 Phase2_compressed (1).pdf30 Dec 2025
Withdrawal Update Form 1File: 25-26 Q1 Form 1 Phase 2.pdf12 Dec 2025
Withdrawal Update Form 2File: 25-26 Q1 Form2 Phase2.pdf12 Dec 2025
Withdrawal Update Form 3File: 25-26 Q1 Form3 Phase2 (2) final.pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: 23-24 Q4 Phase 2 Disclosure Of Inventory.pdf30 Jun 2025
Form 1File: Form 1.pdf30 Jun 2025
Form 2File: Form 2.pdf30 Jun 2025
Form 3File: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3) (3).pdf30 Jun 2025
Form 2A (FY 2023-2024)File: 23-24 Phase 2 Form 2A.pdf30 Jun 2025
Form 1File: Form 1 Q1.pdf28 Jun 2025
Form 2File: Form 2 Q1.pdf28 Jun 2025
Form 3File: Form 3 Q1 c.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Inventory Q1.pdf28 Jun 2025
Form 1File: Q2 24-25 Form1 Phase2.pdf28 Jun 2025
Form 2File: Q2 24-25 Form2 Phase2.pdf28 Jun 2025
Form 3File: Q2 24-25 Form3 Phase2.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q2 24-25 Phase2 Inventory Disclosure.pdf28 Jun 2025
Form 1File: Q3 24-25 Form1 Phase 2.pdf28 Jun 2025
Form 2File: Q3 24-25 Form2 Phase22.pdf28 Jun 2025
Form 3File: Q3 24-25 Form3 Phase2.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q3 24-25 Phase2 Inventory Disclosure.pdf28 Jun 2025
Layout approvalFile: HG 1-9.pdf11 Jun 2025
Building plan approvalFile: HG 1-9.pdf11 Jun 2025
Building plan approvalFile: 2-9.pdf11 Jun 2025
Building plan approvalFile: HG 5-9.pdf11 Jun 2025
Building plan approvalFile: 6-9.pdf11 Jun 2025
Form 1File: Q4 24-25 Form1 Phase2.pdf28 May 2025
Form 2File: Q4 24-25 Form2 Phase2 (1).pdf28 May 2025
Form 3File: Q4 24-25 Form3 Phase2_compressed.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: Q4 24-25 Phase 2 Inventory Disclosure.pdf28 May 2025
Building plan approvalFile: 1-9.pdf4 Apr 2025
Building plan approvalFile: 2-9.pdf4 Apr 2025
Building plan approvalFile: 5-9.pdf4 Apr 2025
Building plan approvalFile: 6-9.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 1-9.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-9.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 5-9.pdf4 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 6-9.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 24-25 Form1 Phase 22.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 24-25 Form3 Phase22.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 24-25 Form2 Phase22.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Q3 24-25 Phase2 Inventory Disclosure.pdf13 Feb 2025
Declaration about Commencement CertificateFile: Declaration of CC 9-10-24.pdf14 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC 9-10-24.pdf13 Nov 2024
Building plan approvalFile: P1-9 c.pdf12 Nov 2024
Building plan approvalFile: 5 c.pdf12 Nov 2024
Building plan approvalFile: 6 c.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 24-25 Form1 Phase2.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 24-25 Form3 Phase2 c.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 24-25 Form2 Phase2.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: P1-9 c.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 c.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 c.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Q2 24-25 Phase2 Inventory Disclosure.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 c.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Inventory Q1.pdf23 Jul 2024
Building plan approvalFile: 1-9c.pdf9 Jul 2024
Building plan approvalFile: 2-9c.pdf9 Jul 2024
Building plan approvalFile: 5-9c.pdf9 Jul 2024
Building plan approvalFile: 6-9.pdf9 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 1-9c.pdf9 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-9c.pdf9 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 5-9c.pdf9 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 6-9.pdf9 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC 27-6-24.pdf9 Jul 2024
Declaration about Commencement CertificateFile: Format D - Declaration of Commencement Certificate.pdf9 Jul 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Yashraj Nakshatra Phase 1P52100050917Yashraj Primo, Pune197May 2023OngoingDec 2026Jan 1970

How this compares with Pune

60%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yashraj Nakshatra Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Yashraj Primo13,700+ in Pune

2 kmYashraj Nakshatra Phase Completed 19Lapsed / revoked 5Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: VISHWAS KALURAM TUPE

VISHWAS KALURAM TUPE has 4 registrations on MahaRERA, including Yashraj Nakshatra Phase 1 and Yashraj Nakshatra Phase 2. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Yashraj Nakshatra Phase 2 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yashraj Nakshatra Phase 2?

The registered promoter entity is VISHWAS KALURAM TUPE, an individual as per the filing. Its GSTIN 27AAJPT0478J1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yashraj Nakshatra Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yashraj Nakshatra Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yashraj Nakshatra Phase 2?

The professionals named in the filing: Architect: Malwadkar Architects Pvt ltd; Engineer: Sunil Ashok Wakure; Engineer: Prafulla Lade; Chartered Accountant: A M kale and Associates; Chartered Accountant: VKPS & ASSOCIATES; Chartered Accountant: Mahajan & Bhapkar Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yashraj Nakshatra Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yashraj Nakshatra Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yashraj Nakshatra Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.