Yashraj Nakshatra Phase 1

By VISHWAS KALURAM TUPE

RG-MH-97075 · RERA P52100050917 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 99%
3 of 197Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 138 documents Report an error

Yashraj Nakshatra Phase 1 is a Residential / Group Housing project by VISHWAS KALURAM TUPE in Pune, Maharashtra, registered with MahaRERA as P52100050917 on 15 May 2023. Possession is promised by 31 Dec 2026. 194 of the 197 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameYashraj Nakshatra Phase 1
  • TypeResidential / Group Housing
  • Location
    • Near Shriram Chowk
    • Yashraj Primo
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050917
  • ReraGenie IDRG-MH-97075

Builder

  • NameVISHWAS KALURAM TUPE
  • Entity typeIndividual
  • GSTIN27AAJPT0478J1Z6
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations3 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredMay 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed138 files

Current status

98%194 of 197 units booked
174.3%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA24201970197

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

Wing A: 68% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.81%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed219

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots219
Closed/Covered219

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,561 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jun 2025
LandownerVillageDistrict
Santosh Kisan TupeHadapsarPune
Sushila Kisan TupeHadapsarPune
Suhasini Arvind TupeHadapsarPune
Sunita Ramesh GhogareHadapsarPune
Sangeeta Bhagwaan JagtapHadapsarPune
Anita Dattatray LonkarHadapsarPune

Approvals and building plan

Sanctioning authorityPOONA MUNICIPAL CORPORATION
Permissible FSI15918.81
Proposed, not sanctioned15,919 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUG Floor, The Destination Centre, Magarpatta, Hadapsar,Pune 411028
Estimated costRs 35.17 cr
Cost incurredRs 61.29 cr
Work done174.26%
BuildingWingEstimatedIncurred
Wing ANARs 34.35 crRs 59.34 cr
-NARs 82.39 lakhRs 1.94 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMalwadkar Architects
EngineerSunil Ashok Wakure
EngineerPrafulla Lade
Chartered AccountantMahajan & Bhapkar Chartered Accountants
Chartered AccountantCA Vishank Chaudhari
Chartered AccountantAachal Kale
Chartered AccountantVKPS & Associates
PartnerRole in project
VISHWAS KALURAM TUPE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed138

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 25-26 Form 2 A Phase 1.pdf24 Jun 2026
Form 2A (FY 2024-2025)File: Form2A Phase-1.pdf22 Jun 2026
Withdrawal Update Form 1File: 25-26 Q4 Form1 Phase1.pdf11 May 2026
Withdrawal Update Form 2File: 25-26 Q4 Form2 Phase1.pdf11 May 2026
Withdrawal Update Form 3File: 25-26 Q4 Form3 Phase1 c.pdf11 May 2026
Withdrawal Update Form 1File: 25-26 Q3 Form1 Phase1.pdf12 Feb 2026
Withdrawal Update Form 2File: 25-26 Q3 Form2 Phase1.pdf12 Feb 2026
Withdrawal Update Form 3File: 25-26 Q3 Form3 Phase1.pdf12 Feb 2026
Form 5 (FY 2024-2025)File: 24-25 Form 5 Phase 1 final.pdf17 Dec 2025
Withdrawal Update Form 1File: Q2 25-26 Form1 Phase1.pdf12 Dec 2025
Withdrawal Update Form 2File: 25-26 Q2 Form2 Phase1.pdf12 Dec 2025
Withdrawal Update Form 3File: 25-26 Q2 Form3 Phase1.pdf12 Dec 2025
Withdrawal Update Form 1File: Q1 25-26 Form1 Phase1.pdf12 Aug 2025
Withdrawal Update Form 2File: 25-26 Q1 Form2 Phase1.pdf12 Aug 2025
Withdrawal Update Form 3File: 25-26 Q1 Form3 Phase1_compressed.pdf12 Aug 2025
Form 1File: Form 1 Q3 23-24.pdf28 Jun 2025
Form 2File: Form 2 Q3 23-24.pdf28 Jun 2025
Form 3File: Form 3 Q3 23-24 c.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Q3 23-24.pdf28 Jun 2025
Form 1File: Form 1 Q4 23-24.pdf28 Jun 2025
Form 2File: Form 2 Q4.pdf28 Jun 2025
Form 3File: Form 3 Q4 c.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q4 Disclosure sold booked inventory.pdf28 Jun 2025
Form 1File: Form 1 Q1.pdf28 Jun 2025
Form 2File: Form 2 Q1.pdf28 Jun 2025
Form 3File: Form 3 c.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Phase 1 Disclosure Of Inventory Q1.pdf28 Jun 2025
Form 1File: Q2 24-25 Form1 Phase1.pdf28 Jun 2025
Form 2File: Q2 24-25 Form2 Phase1.pdf28 Jun 2025
Form 3File: Q2 24-25 Form3 Phase1 c.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q2 24-25 Phase1 Inventory Disclosure.pdf28 Jun 2025
Form 1File: Q3 24-25 Form1 Phase1.pdf28 Jun 2025
Form 2File: Q3 24-25 Form2.pdf28 Jun 2025
Form 3File: Q3 24-25 Form3 Phase1c.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q3 24-25 Phase1 Inventory Disclosure.pdf28 Jun 2025
Form 1File: Q4 24-25 Form1 Phase1.pdf28 Jun 2025
Form 2File: Q4 24-25 Form2 Phase1.pdf28 Jun 2025
Form 3File: Q4 24-25 Form3 Phase1c.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Q4 24-25 Phase 1 Inventory Disclosure.pdf28 Jun 2025
Form 2A (FY 2023-2024)File: 23-24 Form 2A.pdf28 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 24-25 Form1 Phase1.pdf20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 24-25 Form1 Phase1.pdf20 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 24-25 Form3 Phase1c.pdf20 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 24-25 Form3 Phase1c.pdf20 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 24-25 Form2.pdf20 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 24-25 Form2 Phase1.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: Q3 24-25 Phase1 Inventory Disclosure.pdf20 May 2025
Disclosure of sold/ booked inventoryFile: Q4 24-25 Phase 1 Inventory Disclosure.pdf20 May 2025
Form 1File: Form 1 (Architecht) Q1 23-24.pdf19 May 2025
Form 219 May 2025
Form 3File: Form 3 Q1 c.pdf19 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLO~1.PDF19 May 2025
Form 1File: Form 1 (Architecht) Q1 23-24.pdf19 May 2025
Form 2File: Form 3 Q1 c.pdf19 May 2025
Form 3File: DISCLO~1.PDF19 May 2025
Disclosure of Sold and Booked InventoryFile: Form 1 Q2 23-24.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 24-25 Form1 Phase1.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 24-25 Form3 Phase1 c.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 24-25 Form2 Phase1.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: Q2 24-25 Phase1 Inventory Disclosure c.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Inventory c.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 c.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 23-24 Form 2A.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 23-24.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 VDB NK.pdf6 May 2024
Disclosure of sold/ booked inventoryFile: Q4 Disclosure A Wing RERA NK VDB.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 c.pdf6 May 2024
Declaration about Commencement CertificateFile: Declaration for CC A Wing.pdf4 Apr 2024
Building plan approvalFile: 1-9c.pdf3 Apr 2024
Building plan approvalFile: 2-9.pdf3 Apr 2024
Building plan approvalFile: 3-9c.pdf3 Apr 2024
Building plan approvalFile: 4-9c.pdf3 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1-9c.pdf3 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-9.pdf3 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 3-9c.pdf3 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-9c.pdf3 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC 28-3-24.pdf3 Apr 2024

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yashraj Nakshatra Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Yashraj Primo13,700+ in Pune

2 kmYashraj Nakshatra Phase Completed 41Lapsed / revoked 16Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 106 registered projects within 2 km.

Builder: VISHWAS KALURAM TUPE

VISHWAS KALURAM TUPE has 4 registrations on MahaRERA, including Yashraj Nakshatra Phase 1 and Yashraj Nakshatra Phase 2. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Yashraj Nakshatra Phase 1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yashraj Nakshatra Phase 1?

The registered promoter entity is VISHWAS KALURAM TUPE, an individual as per the filing. Its GSTIN 27AAJPT0478J1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yashraj Nakshatra Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yashraj Nakshatra Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yashraj Nakshatra Phase 1?

The professionals named in the filing: Architect: Malwadkar Architects; Engineer: Sunil Ashok Wakure; Engineer: Prafulla Lade; Chartered Accountant: Mahajan & Bhapkar Chartered Accountants; Chartered Accountant: CA Vishank Chaudhari; Chartered Accountant: Aachal Kale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yashraj Nakshatra Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yashraj Nakshatra Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yashraj Nakshatra Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.