Home / Browse projects / Nashik, Maharashtra / Yashoda Miracle

Registered No litigation declared Residential / Group Housing project

Yashoda Miracle

By Pawar Properties

RG-MH-52579 · RERA P51600049152 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 95%
13 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

Yashoda Miracle is a Residential / Group Housing project by Pawar Properties in Nashik, Maharashtra, registered with MahaRERA as P51600049152 on 1 Feb 2023. Possession is promised by 25 Mar 2027. The completion date has moved by 12 months from the original filing. 0 of the 13 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameYashoda Miracle
  • TypeResidential / Group Housing
  • Location
    • Gangapur Road
    • Rathi Amrai
    • Nashik (M Corp.)
    • Nashik
    • 422013
  • Pincode422013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600049152
  • ReraGenie IDRG-MH-52579

Builder

  • NamePawar Properties
  • Entity typePartnership
  • PartnersAjit Prakash Pawar, Rohit Prakash Pawar

Key dates

this monthRegisteredFeb 2023First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Feb 2023
  • Promised completion25 Mar 2027
  • Revised completionRevised to 25 Mar 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed94 files

Current status

0%0 of 13 units booked
94.9%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Yashoda MiracleNA14013013

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

Yashoda Miracle: 92% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)85%
Plinth100%
Stilt Floor95%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.91%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.91%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes90%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes85%
Energy managemcntYes92%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes90%
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Open Space34

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area789 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Mar 2026

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI3205.28
Proposed, not sanctioned3,205 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGangapur Road
Estimated costRs 9.25 cr
Cost incurredRs 8.78 cr
Work done94.9%
BuildingWingEstimatedIncurred
Yashoda MiracleNARs 8.75 crRs 8.32 cr
-NARs 50.00 lakhRs 45.69 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPankaj Jadhav Jadhav
EngineerPrasanna Bhore
EngineerGaurav Shirode
Chartered AccountantSurashree Pawar Nikhil Pawar
Chartered AccountantSurashree Pawar
Chartered AccountantANKITA ABHINANDAN MUTHA
PartnerRole in project
Pawar Properties-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30032620440Mar 2026 → Mar 2027

Reason as filed by the promoterOur Project is delayed due to slow regulatory approvals, labour shortages, and material price surges

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Mar 2027

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate Upto March 2026 (1).pdf27 Apr 2026
Withdrawal Update Form 2File: Engineers Certificate Upto March 2026 (1).pdf27 Apr 2026
Withdrawal Update Form 3File: CA Certificate Q4.pdf27 Apr 2026
Form 2A (FY 2022-2023)File: 31032023.pdf27 Apr 2026
Form 2A (FY 2023-2024)File: 31032024.pdf27 Apr 2026
Form 2A (FY 2024-2025)File: 31032025.pdf27 Apr 2026
Form 2A (FY 2025-2026)File: 31032026.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 Miracle.pdf29 Mar 2026
Withdrawal Update Form 1File: Form 1 Miracle.pdf29 Mar 2026
Withdrawal Update Form 1File: Form 1 Miracle.pdf29 Mar 2026
Withdrawal Update Form 1File: Form 1 Miracle.pdf29 Mar 2026
Withdrawal Update Form 2File: Engineer Q3 23-24.pdf29 Mar 2026
Withdrawal Update Form 2File: Engineer Q3 23-24.pdf29 Mar 2026
Withdrawal Update Form 2File: Engineer Q3 23-24.pdf29 Mar 2026
Withdrawal Update Form 2File: Engineer Q3 23-24.pdf29 Mar 2026
Withdrawal Update Form 3File: upload.pdf29 Mar 2026
Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf29 Mar 2026
Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf29 Mar 2026
Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf29 Mar 2026
Form 5 (FY 2022-2023)File: 2023.pdf24 Mar 2026
Form 5 (FY 2023-2024)File: 2024.pdf24 Mar 2026
Form 5 (FY 2024-2025)File: 2025.pdf24 Mar 2026
Form 1File: Form 1 - Architect Certificate.pdf7 Mar 2026
Form 2File: Form 2 - Engineer Certificate.pdf7 Mar 2026
Form 3File: Form 3 - CA Certificate.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf7 Mar 2026
Form 1File: Form 1 - Architect Certificate.pdf7 Mar 2026
Form 2File: Form 2 - Engineer Certificate.pdf7 Mar 2026
Form 3File: Form 3 - CA Certificate.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf7 Mar 2026
Form 1File: Form 1 - Architect Certificate.pdf7 Mar 2026
Form 2File: Form 2 - Engineer Certificate.pdf7 Mar 2026
Form 3File: Form 3 - CA Certificate.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf7 Mar 2026
Form 1File: Form 1 - Architect Certificate.pdf7 Mar 2026
Form 2File: Form 2 - Engineer Certificate.pdf7 Mar 2026
Form 3File: Form 3 - CA Certificate.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf7 Mar 2026
Form 1File: Form 1 - Architect Certificate.pdf7 Mar 2026
Form 2File: Form 2 - Engineer Certificate.pdf7 Mar 2026
Form 3File: Form 3 - CA Certificate.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf7 Mar 2026
Form 1File: Form 1 - Architect Certificate.pdf7 Mar 2026
Form 2File: Form 2 - Engineer Certificate.pdf7 Mar 2026
Form 3File: Form 3 - CA Certificate.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf7 Mar 2026
Form 1File: Form 1 - Architect Certificate.pdf7 Mar 2026
Form 2File: Form 2 - Engineer Certificate.pdf7 Mar 2026
Form 3File: Form 3 - CA Certificate.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf7 Mar 2026
Form 1File: Form 1 - Architect Certificate.pdf7 Mar 2026
Form 2File: Form 2 - Engineer Certificate.pdf7 Mar 2026
Form 3File: Form 3 - CA Certificate.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf7 Mar 2026
Form 1File: Form 1 - Architect Certificate.pdf7 Mar 2026
Form 2File: Form 2 - Engineer Certificate.pdf7 Mar 2026
Form 3File: Form 3 - CA Certificate.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf7 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE Q4 23-24.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2.pdf24 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Q4 22-23.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Q3 23-24.pdf24 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE Q3 23-24.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Q2 23-24.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE Q2 23-24.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 22-23.pdf8 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 23-24.pdf8 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Q4 22-23.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Q1 23-24.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE Q4 22-23.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE Q1 23-24.pdf6 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumberance Finance.pdf24 Jan 2023
Details of encumbrances concerned to LegalFile: Encumberance Finance.pdf24 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Miracle C A CERTIFICATE.pdf24 Jan 2023
Declaration in FORM BFile: Form B Pawar Properties updates .pdf19 Jan 2023
Proforma of Agreement for saleFile: Draft Upload.pdf11 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Inerest.pdf2 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Banl Account.pdf13 Dec 2022

How this compares with Nashik

0%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 12 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yashoda Miracle on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rathi Amrai4,100+ in Nashik

2 kmYashoda MiracleCompleted 158Lapsed / revoked 40Other 104Dot size: filed unitsN

Filed coordinates, straight-line distance. 302 registered projects within 2 km.

Builder: Pawar Properties

Pawar Properties has 1 registration on MahaRERA, including Yashoda Miracle. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Yashoda Miracle is delayed beyond 25 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yashoda Miracle?

The registered promoter entity is Pawar Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yashoda Miracle?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yashoda Miracle?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yashoda Miracle?

The professionals named in the filing: Architect: Pankaj Jadhav Jadhav; Engineer: Prasanna Bhore; Engineer: Gaurav Shirode; Chartered Accountant: Surashree Pawar Nikhil Pawar; Chartered Accountant: Surashree Pawar; Chartered Accountant: ANKITA ABHINANDAN MUTHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yashoda Miracle?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yashoda Miracle. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yashoda Miracle to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.