Home / Browse projects / Yash Grecia- ABC Wing
Yash Grecia- ABC Wing
RG-MH-94929 · RERA P52100045875 · Last updated on MahaRERA portal: 14 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Yash Grecia- ABC Wing is a Others project by Akshay Enterprises in Pune, 411015, registered with MahaRERA as P52100045875 on 15 Jun 2022. Possession is promised by 31 Dec 2028. 170 of the 237 units on this registration are recorded sold or booked, and 28 of 33 construction stages are filed complete.
At a glance
Project
- NameYash Grecia- ABC Wing
- TypeOthers
- Location
- Pune M Corp
- Pune
- 411015
- Pincode411015
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045875
- ReraGenie IDRG-MH-94929
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jun 2022
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings3 building records
- Documents filed122 files
Current status
Figures as on 14 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Yash Grecia- A Wing | NA | 16 | 14 | 52 | 6 | 58 |
| Yash Grecia B Wing | NA | 16 | 14 | 104 | 17 | 121 |
| Yash Grecia C Wing | NA | 16 | 14 | 52 | 6 | 58 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
28 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 65%.
Yash Grecia- A Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Yash Grecia B Wing64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Yash Grecia C Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 87% |
| Water Supply | Yes | 25% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 50% |
| Community Buildings | Yes | 50% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 75% |
| Energy managemcnt | Yes | 75% |
| Fire protection and fire safety requirements | Yes | 75% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed204
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Yash Grecia- A Wing | 47 | 5 | 52 |
| Yash Grecia B Wing | 100 | 0 | 100 |
| Yash Grecia C Wing | 52 | 0 | 52 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Akshay Enterprises | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Yash Grecia B Wing | NA | Rs 27.04 cr | Rs 10.81 cr |
| Yash Grecia- A Wing | NA | Rs 15.74 cr | Rs 15.32 cr |
| Yash Grecia C Wing | NA | Rs 15.10 cr | Rs 14.19 cr |
| - | NA | Rs 6.89 cr | Rs 2.97 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vastu Nirman |
| Engineer | Mr Nikhil Kulkarni |
| Chartered Accountant | Rashmi Porwal |
| Chartered Accountant | Kashmira Kuwad & Associates |
| Chartered Accountant | PGMJ & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Akshay Enterprises | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed122
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form I.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: Form II.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: Form III.pdf | 14 Jul 2026 |
| Withdrawal Update Form 1File: Form I YG ABC Wing Dec 25.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form II.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form III.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Form I YG ABC Wing Dec 25.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form II DEC 25.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 _YG ABC WING.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Form I.pdf | 12 Dec 2025 |
| Withdrawal Update Form 2File: Form II.pdf | 12 Dec 2025 |
| Withdrawal Update Form 3File: Form III.pdf | 12 Dec 2025 |
| Form 2A (FY 2024-2025)File: YG ABC Wing Form 2A.pdf | 29 Nov 2025 |
| Withdrawal Update Form 1File: Form I - YG ABC Wing Oct 25.pdf | 12 Nov 2025 |
| Withdrawal Update Form 2File: Form II - YG ABC WING-OCT 25.pdf | 12 Nov 2025 |
| Withdrawal Update Form 3File: FORM III YG ABC WING OCT.pdf | 12 Nov 2025 |
| Withdrawal Update Form 1File: YG ABC Form I.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: YG ABC Form II.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: YG ABC Form III.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: Form I YG ABC Wing Q1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 2File: Form II YG ABC Wing Q1.pdf | 6 Aug 2025 |
| Withdrawal Update Form 3File: Form III YG ABC Wing.pdf | 6 Aug 2025 |
| Form 1File: YG ABC Wing Form I 30 09 2024.pdf | 5 Jul 2025 |
| Form 2File: YG ABC Wing Form II 30 09 2024.pdf | 5 Jul 2025 |
| Form 3File: YG ABC Wing Form III 30 09 24.pdf | 5 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: YG ABC Wing Inventory 30 09 2024.pdf | 5 Jul 2025 |
| Form 1File: FORM 1 300624.pdf | 5 Jul 2025 |
| Form 2File: FORM 2 300624.pdf | 5 Jul 2025 |
| Form 3File: FORM 3 300624.pdf | 5 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: YG ABC Wing Inventory 30 06 2024.pdf | 5 Jul 2025 |
| Form 1File: FORM 1 310324.pdf | 5 Jul 2025 |
| Form 2File: FORM 2 310324.pdf | 5 Jul 2025 |
| Form 3File: FORM 3 310324.pdf | 5 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: ABC FY 23-24 Q4.pdf | 5 Jul 2025 |
| Form 1File: FORM 1 300923.pdf | 5 Jul 2025 |
| Form 2File: FORM 2 300923.pdf | 5 Jul 2025 |
| Form 3File: FORM 3 300923.pdf | 5 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: ABC FY 23-24 Q2.pdf | 5 Jul 2025 |
| Form 1File: FORM 1 311223.pdf | 5 Jul 2025 |
| Form 2File: FORM 2 311223.pdf | 5 Jul 2025 |
| Form 3File: FORM 3 311223.pdf | 5 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: ABC FY 23-24 Q3.pdf | 5 Jul 2025 |
| Form 1File: Form I ABC Wing Mar 25.pdf | 24 Jun 2025 |
| Form 2File: Form II YG ABC Wing Mar 25.pdf | 24 Jun 2025 |
| Form 3File: Form 3 YG ABC Wing.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory March 25.pdf | 24 Jun 2025 |
| Form 1File: FORM 1.pdf | 24 Jun 2025 |
| Form 2File: FORM 2.pdf | 24 Jun 2025 |
| Form 3File: FORM 3.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY_Q3.pdf | 24 Jun 2025 |
| Form 5 (FY 2024-2025)File: FINAL YASH GRECIA ABC WING.pdf | 26 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I ABC Wing Mar 25.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 YG ABC Wing.pdf | 9 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II YG ABC Wing Mar 25.pdf | 9 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory March 25.pdf | 9 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I- ABC Wing Feb 25.pdf | 7 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - ABC Wing Feb 25.pdf | 7 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II - ABC Wing Feb 25.pdf | 7 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: A wing DICLOSURE OF SOLD BOOKED INVENTORY.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: B wing DICLOSURE OF SOLD BOOKED INVENTORY.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: C wing DICLOSURE OF SOLD BOOKED INVENTORY.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I YG ABC Wing 3112.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: YG ABC Wing Form III 31 12.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 YG ABC Wing 31 12.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 YG ABC WING 30 11.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 YG ABC WING.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 YG ABC WING 30 11.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 YG ABC WING.pdf | 15 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 YG ABC WING.pdf | 15 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 YG ABC WING.pdf | 15 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Yash Grecia ABC Wing FY 2023-24.pdf | 15 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: YG ABC Wing Form I 30 09 2024.pdf | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: YG ABC Wing Form III 30 09 24.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YG ABC Wing Form II 30 09 2024.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I 310724.pdf | 7 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 310724.pdf | 7 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 310724.pdf | 7 Aug 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Yash Rhythm | Survey no 37 Plot no C Off NIMB Road Parge Nagar Kondhwa Khurd Pune 411048 | 76 | Completed | Jul 2018 | Apr 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 122 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Yash Grecia- ABC Wing on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune
Filed coordinates, straight-line distance. 54 registered projects within 2 km.
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: Akshay Enterprises
Akshay Enterprises has 8 registrations on MahaRERA, including DEVBHOOMI RESIDENTIAL COMPLEX and YASH SARTHAK. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if Yash Grecia- ABC Wing is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Yash Grecia- ABC Wing?
The registered promoter entity is Akshay Enterprises, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Yash Grecia- ABC Wing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Yash Grecia- ABC Wing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Yash Grecia- ABC Wing?
The professionals named in the filing: Architect: Vastu Nirman; Engineer: Mr Nikhil Kulkarni; Chartered Accountant: Rashmi Porwal; Chartered Accountant: Kashmira Kuwad & Associates; Chartered Accountant: PGMJ & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Yash Grecia- ABC Wing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback