Home / Browse projects / Yash Grecia- ABC Wing

Registered No litigation declared Others project

Yash Grecia- ABC Wing

By Akshay Enterprises

RG-MH-94929 · RERA P52100045875 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2028Possession promisedno revision filed
28 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 65%
67 of 237Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

Yash Grecia- ABC Wing is a Others project by Akshay Enterprises in Pune, 411015, registered with MahaRERA as P52100045875 on 15 Jun 2022. Possession is promised by 31 Dec 2028. 170 of the 237 units on this registration are recorded sold or booked, and 28 of 33 construction stages are filed complete.

At a glance

Project

  • NameYash Grecia- ABC Wing
  • TypeOthers
  • Location
    • Pune M Corp
    • Pune
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100045875
  • ReraGenie IDRG-MH-94929

Builder

  • NameAkshay Enterprises
  • Entity typeOthers
  • ProprietorsAsmita Ashok Kataria KATARIYA, ASMITA ASHOK KATARIA
  • Other registrations7 more →
  • Completed4 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredJun 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed122 files

Current status

72%170 of 237 units booked
66.8%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Yash Grecia- A WingNA161452658
Yash Grecia B WingNA161410417121
Yash Grecia C WingNA161452658

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 65%.

Yash Grecia- A Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Yash Grecia B Wing64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Yash Grecia C Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes87%
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes60%
Street LightingYes50%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes75%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed204

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots204
Closed/Covered199
Open Space5
BuildingClosed/CoveredOpen SpaceTotal
Yash Grecia- A Wing47552
Yash Grecia B Wing1000100
Yash Grecia C Wing52052

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,124 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jun 2025
LandownerVillageDistrict
Akshay EnterprisesKothrudPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI18388.53
Proposed, not sanctioned18,389 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 3,4,6,9,10, Business Court, Mukund Nagar, Pune 411037
Estimated costRs 64.77 cr
Cost incurredRs 43.30 cr
Work done66.85%
BuildingWingEstimatedIncurred
Yash Grecia B WingNARs 27.04 crRs 10.81 cr
Yash Grecia- A WingNARs 15.74 crRs 15.32 cr
Yash Grecia C WingNARs 15.10 crRs 14.19 cr
-NARs 6.89 crRs 2.97 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastu Nirman
EngineerMr Nikhil Kulkarni
Chartered AccountantRashmi Porwal
Chartered AccountantKashmira Kuwad & Associates
Chartered AccountantPGMJ & ASSOCIATES
PartnerRole in project
Akshay Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form I.pdf14 Jul 2026
Withdrawal Update Form 2File: Form II.pdf14 Jul 2026
Withdrawal Update Form 3File: Form III.pdf14 Jul 2026
Withdrawal Update Form 1File: Form I YG ABC Wing Dec 25.pdf17 Apr 2026
Withdrawal Update Form 2File: Form II.pdf17 Apr 2026
Withdrawal Update Form 3File: Form III.pdf17 Apr 2026
Withdrawal Update Form 1File: Form I YG ABC Wing Dec 25.pdf22 Jan 2026
Withdrawal Update Form 2File: Form II DEC 25.pdf22 Jan 2026
Withdrawal Update Form 3File: FORM 3 _YG ABC WING.pdf22 Jan 2026
Withdrawal Update Form 1File: Form I.pdf12 Dec 2025
Withdrawal Update Form 2File: Form II.pdf12 Dec 2025
Withdrawal Update Form 3File: Form III.pdf12 Dec 2025
Form 2A (FY 2024-2025)File: YG ABC Wing Form 2A.pdf29 Nov 2025
Withdrawal Update Form 1File: Form I - YG ABC Wing Oct 25.pdf12 Nov 2025
Withdrawal Update Form 2File: Form II - YG ABC WING-OCT 25.pdf12 Nov 2025
Withdrawal Update Form 3File: FORM III YG ABC WING OCT.pdf12 Nov 2025
Withdrawal Update Form 1File: YG ABC Form I.pdf17 Oct 2025
Withdrawal Update Form 2File: YG ABC Form II.pdf17 Oct 2025
Withdrawal Update Form 3File: YG ABC Form III.pdf17 Oct 2025
Withdrawal Update Form 1File: Form I YG ABC Wing Q1.pdf6 Aug 2025
Withdrawal Update Form 2File: Form II YG ABC Wing Q1.pdf6 Aug 2025
Withdrawal Update Form 3File: Form III YG ABC Wing.pdf6 Aug 2025
Form 1File: YG ABC Wing Form I 30 09 2024.pdf5 Jul 2025
Form 2File: YG ABC Wing Form II 30 09 2024.pdf5 Jul 2025
Form 3File: YG ABC Wing Form III 30 09 24.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: YG ABC Wing Inventory 30 09 2024.pdf5 Jul 2025
Form 1File: FORM 1 300624.pdf5 Jul 2025
Form 2File: FORM 2 300624.pdf5 Jul 2025
Form 3File: FORM 3 300624.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: YG ABC Wing Inventory 30 06 2024.pdf5 Jul 2025
Form 1File: FORM 1 310324.pdf5 Jul 2025
Form 2File: FORM 2 310324.pdf5 Jul 2025
Form 3File: FORM 3 310324.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: ABC FY 23-24 Q4.pdf5 Jul 2025
Form 1File: FORM 1 300923.pdf5 Jul 2025
Form 2File: FORM 2 300923.pdf5 Jul 2025
Form 3File: FORM 3 300923.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: ABC FY 23-24 Q2.pdf5 Jul 2025
Form 1File: FORM 1 311223.pdf5 Jul 2025
Form 2File: FORM 2 311223.pdf5 Jul 2025
Form 3File: FORM 3 311223.pdf5 Jul 2025
Disclosure of Sold and Booked InventoryFile: ABC FY 23-24 Q3.pdf5 Jul 2025
Form 1File: Form I ABC Wing Mar 25.pdf24 Jun 2025
Form 2File: Form II YG ABC Wing Mar 25.pdf24 Jun 2025
Form 3File: Form 3 YG ABC Wing.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory March 25.pdf24 Jun 2025
Form 1File: FORM 1.pdf24 Jun 2025
Form 2File: FORM 2.pdf24 Jun 2025
Form 3File: FORM 3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY_Q3.pdf24 Jun 2025
Form 5 (FY 2024-2025)File: FINAL YASH GRECIA ABC WING.pdf26 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I ABC Wing Mar 25.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 YG ABC Wing.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II YG ABC Wing Mar 25.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory March 25.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I- ABC Wing Feb 25.pdf7 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III - ABC Wing Feb 25.pdf7 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II - ABC Wing Feb 25.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: A wing DICLOSURE OF SOLD BOOKED INVENTORY.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: B wing DICLOSURE OF SOLD BOOKED INVENTORY.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: C wing DICLOSURE OF SOLD BOOKED INVENTORY.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I YG ABC Wing 3112.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: YG ABC Wing Form III 31 12.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 YG ABC Wing 31 12.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 YG ABC WING 30 11.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 YG ABC WING.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 YG ABC WING 30 11.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 YG ABC WING.pdf15 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 YG ABC WING.pdf15 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 YG ABC WING.pdf15 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Yash Grecia ABC Wing FY 2023-24.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: YG ABC Wing Form I 30 09 2024.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: YG ABC Wing Form III 30 09 24.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YG ABC Wing Form II 30 09 2024.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I 310724.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 310724.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 310724.pdf7 Aug 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Yash RhythmSurvey no 37 Plot no C Off NIMB Road Parge Nagar Kondhwa Khurd Pune 41104876CompletedJul 2018Apr 2017

Keep Yash Grecia- ABC Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune

2 kmYash Grecia- ABC WingCompleted 30Lapsed / revoked 5Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: Akshay Enterprises

Akshay Enterprises has 8 registrations on MahaRERA, including DEVBHOOMI RESIDENTIAL COMPLEX and YASH SARTHAK. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if Yash Grecia- ABC Wing is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yash Grecia- ABC Wing?

The registered promoter entity is Akshay Enterprises, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yash Grecia- ABC Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yash Grecia- ABC Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yash Grecia- ABC Wing?

The professionals named in the filing: Architect: Vastu Nirman; Engineer: Mr Nikhil Kulkarni; Chartered Accountant: Rashmi Porwal; Chartered Accountant: Kashmira Kuwad & Associates; Chartered Accountant: PGMJ & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yash Grecia- ABC Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yash Grecia- ABC Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yash Grecia- ABC Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.