Home / Browse projects / Pune, Maharashtra / WORLD THREE - SOLITAIRE WORLD
WORLD THREE - SOLITAIRE WORLD
By Classic Promoters and Builders Private Limited
RG-MH-67044 · RERA P52100018407 · Last updated on MahaRERA portal: 9 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 42 months
- 3 extensions taken
- Rs 180.00 crore secured on the land, in favour of UNION BANK OF INDIA
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
WORLD THREE - SOLITAIRE WORLD is a Residential / Group Housing project by Classic Promoters and Builders Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100018407 on 30 Oct 2018. Possession is promised by 30 Jun 2027. The completion date has moved by 42 months from the original filing. 125 of the 168 units on this registration are recorded sold or booked, and 40 of 66 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameWORLD THREE - SOLITAIRE WORLD
- TypeResidential / Group Housing
- Location
- BIBVEWADI
- Pune (M Corp.)
- Pune City
- Pune
- 411037
- Pincode411037
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100018407
- ReraGenie IDRG-MH-67044
Builder
- NameClassic Promoters and Builders Private Limited
- Entity typeCompany
- CINU70101MH1988PTC047131
- GSTIN27AABCC1200C1ZN
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorAshok Dhanraj Chordia
- Other registrations14 more →
- Completed4 of 15
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Oct 2018
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Dec 2023)
- Buildings6 building records
- Documents filed518 files
Current status
Figures as on 9 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WORLD THREE - BUILDING 1 GROUND FLOOR | NA | 4 | 1 | 4 | 0 | 4 |
| WORLD THREE - BUILDING 2 1st Floor to 7th Floor | NA | 7 | 7 | 42 | 0 | 42 |
| WORLD THREE - BUILDING THREE 8th Floor to 11th Floor | NA | 4 | 4 | 24 | 0 | 24 |
| WORLD THREE - BUILDING FOUR 12A to 18th Floor | NA | 7 | 7 | 38 | 0 | 38 |
| WORLD THREE - BUILDING FIVE 19th to 29th Floor | NA | 11 | 11 | 57 | 0 | 57 |
| WORLD THREE-BUILDING SIX 30TH FLOOR | NA | 1 | 1 | 3 | 0 | 3 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
40 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 99%.
WORLD THREE - BUILDING 1 GROUND FLOOR80%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 99% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 97% |
WORLD THREE - BUILDING 2 1st Floor to 7th Floor91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
WORLD THREE - BUILDING THREE 8th Floor to 11th Floor87%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
WORLD THREE - BUILDING FOUR 12A to 18th Floor82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 99% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 97% |
WORLD THREE - BUILDING FIVE 19th to 29th Floor82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 99% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 97% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96% |
WORLD THREE-BUILDING SIX 30TH FLOOR80%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 94% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 45% |
| Water Supply | Yes | 15% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 55% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 83% |
| Water conservation /Rain water harvesting | Yes | 66% |
| Energy managemcnt | Yes | 66% |
| Fire protection and fire safety requirements | Yes | 93% |
| Electrical meter room, sub-station, receiving station | Yes | 55% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed736
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| M/s Shah Promoters & Developers | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WORLD THREE - BUILDING FIVE 19th to 29th Floor | NA | Rs 38.08 cr | Rs 30.39 cr |
| WORLD THREE - BUILDING 2 1st Floor to 7th Floor | NA | Rs 24.20 cr | Rs 19.32 cr |
| WORLD THREE - BUILDING FOUR 12A to 18th Floor | NA | Rs 24.18 cr | Rs 19.30 cr |
| WORLD THREE - BUILDING THREE 8th Floor to 11th Floor | NA | Rs 13.78 cr | Rs 11.00 cr |
| - | NA | Rs 11.45 cr | Rs 8.23 cr |
| WORLD THREE - BUILDING 1 GROUND FLOOR | NA | Rs 3.87 cr | Rs 3.09 cr |
| WORLD THREE-BUILDING SIX 30TH FLOOR | NA | Rs 3.61 cr | Rs 2.88 cr |
Certifying professionals and partners10
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Fourth Dimension Architects private limited |
| Architect | Venkataramanan Associates |
| Engineer | Shivprasad Kale |
| Engineer | Ishwar Ghodke |
| Engineer | Sushil Bhoi |
| Engineer | Swapnil Sonawane |
| Engineer | JW Consultants LLP |
| Chartered Accountant | SPAK & Co |
| Chartered Accountant | RSVA & Co |
| Chartered Accountant | GMKS & Co. |
| Partner | Role in project |
|---|---|
| Classic Promoters and Builders Private Limited | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, Classic Promoters And Builders Private Limited, are developing a residential project named World Three Solitaire World. The project was registered with MahaRERA and was due to be completed on 30-06-2024. However, due to the COVID-19 pandemic, we faced several challenges that adversely affected the construction activities and the sales of the project. Some of these challenges were: • Lack of availability of labour contractors as many of them migrated back to their native places during the lockdown. • Disruption of supply chain of essential construction materials such as cement, steel, sand,
Reason as filed by the promoterAs per order of the Hon'ble Chairman (MahaRERA) Dated 15/09/2025 request you to grant us extension till 30/06/2026
Reason as filed by the promoterAs per order of the Hon'ble Chairman (MahaRERA) Dated 04/08/2026, we request you kindly to grant us extension till 30/06/2027.
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12501999 | Classic Promoters and Builders Private Limited | Mr Ganesh Vasantrao Jagtap | 18/06/2025 |
| CC12603864 | Sanket Pandurang Vaidya | Classic Promoters and Builders Private Limited | 22/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed518
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 518 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: 75e423b3-93cc-464c-b81c-db9b91f7fdce.pdf | 9 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - World Three Form 1 - Jun 2026.pdf | 8 Jul 2026 |
| Withdrawal Update Form 2File: Form 2- World Three - Jun 26.pdf | 8 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 -World 3 -30-06-2026.pdf | 8 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - World Three - Mar 26.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - World Three - Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - World Three - Mar 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - World Three - Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - World Three - Dec 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - World Three - Dec 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - World Three - Dec 2025.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - World Three - Sept 2025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 - World Three - Sept 2025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - World Three - Sept 2025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 SW-Three- Jun-25.pdf | 22 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 SW Three-Jun-25 Sign.pdf | 22 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 - World Three - Jun 25.pdf | 22 Sep 2025 |
| Form 5 (FY 2024-2025)File: World Three -Form 5-FY 24-25.pdf | 5 Sep 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2Form 1 -World Three Mar 19.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1Form 1 -World Three Dec 18.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- World Three - Mar 25.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- World Three - Jun 2024.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 W3 March-2023.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 17 Form 1 - World Three - Dec 22.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 - World Three - Sept 22.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 -World Three - Jun 22.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14 Form 1-World Three- Mar 22.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - W3 - Dec 21.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - World Three - Architect Certificte - Sept 21.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - World Three - Mar 21.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 Form 1 - World Three - Dec 20.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 Form 1 - World Three - Sept 20.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 -World Three - Jun 20.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 World -3- Mar 20.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5Form 1 -World Three Dec 19.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4Form 1 -World Three Sept 19.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form -World Three Jun 19.pdf | 13 Jun 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 SW World Three Architect Certificate June-21.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14 Form 2 World Three - Mar 22.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 15 Form 2 World Three - Jun 22.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16 Form 2 World Three - Sept 22.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 17 Form 2 World Three - Dec 22.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 18 Form 2 World Three - Mar 23.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19 Form 2 World Three - Jun 23.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20 Form 2 World Three - Sept 23.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 21 Form 2 World Three - Dec 23.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Form 2 World Three - Dec 19.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 22 Form 2 World Three - Mar 24.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 23 Form 2 World Three - Jun 24.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 24 Form 2 World Three - Sept 24.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - World Three - Mar 25.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Form 2 World Three - Dec 21.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Form 2 World Three - Sept 21.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Form 2 World Three - Jun 21.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Form 2 World Three - Mar 21.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Form 2 World Three - Dec 20.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Form 2 World Three - Sept 20.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Form 2 World Three - Jun 20.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Form 2 World Three - Mar 20.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Form 2 World Three - Sept 19.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Form 2 World Three - Jun 19.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 World Three - Mar 19.pdf | 13 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Form 2 World Three - Dec 18.pdf | 13 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: World Three- Form 2A- Mar 19.pdf | 13 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - World 3 Mar 22.pdf | 13 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - World Three- Mar 25.pdf | 13 Jun 2025 |
| Certificates of CA (Form 3)File: 16 Form 3- World Three - Sept 22.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: Form 3 - World Three - Mar 25.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 024 Form 3 - World Three - Sept 24.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 23 Form 3 - World Three - Jun 24.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 22 Form 3- World Three - Mar 24.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 21 Form 3 -World Three Dec 23.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 20 Form 3- World Three - Sept 23.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 19 Form 3- World Three - Jun 23_compressed.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 18 Form 3- World Three - Mar 23.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 17 Form 3 - World Three - Dec 22.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 7 Form 3 - World Three - Jun 20.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 15 Form 3 - World Three - Jun 22_compressed.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 14 Form 3 -World Three Mar 22_compressed.pdf | 12 Jun 2025 |
| Certificates of CA (Form 3)File: 13 Form 3 -World Three Dec 21.pdf | 12 Jun 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Avalon C-3 | Pimpri Chinchwad Pune 411012 | 47 | Completed | Dec 2019 | Late, Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 14 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 518 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep WORLD THREE - SOLITAIRE WORLD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BIBVEWADI13,700+ in Pune
Filed coordinates, straight-line distance. 130 registered projects within 2 km.
MAHA TRADE MARKET PH- 2
JAIRAJ REALTY LLP
MAHA TRADE MARKET PH- 1
JAIRAJ REALTY LLP
SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORL
Classic Promoters and Builders Private Lim
SOLITAIRE BUSINESS HUB PHASE II, SOLITAIRE WOR
Classic Promoters and Builders Private Lim
World One Solitaire World
Classic Promoters and Builders Private Lim
HILL TOWN A B AND C WING
HILL TOWN CONSTRUCTIONS
Builder: Classic Promoters and Builders Private Limited
Classic Promoters and Builders Private Limited has 15 registrations on MahaRERA, including AVALON CITY C-3 and MUDRA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if WORLD THREE - SOLITAIRE WORLD is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of WORLD THREE - SOLITAIRE WORLD?
The registered promoter entity is Classic Promoters and Builders Private Limited, a company as per the filing. Its CIN U70101MH1988PTC047131 and GSTIN 27AABCC1200C1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in WORLD THREE - SOLITAIRE WORLD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against WORLD THREE - SOLITAIRE WORLD?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for WORLD THREE - SOLITAIRE WORLD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at WORLD THREE - SOLITAIRE WORLD?
The professionals named in the filing: Architect: Fourth Dimension Architects private limited; Architect: Venkataramanan Associates; Engineer: Shivprasad Kale; Engineer: Ishwar Ghodke; Engineer: Sushil Bhoi; Engineer: Swapnil Sonawane. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in WORLD THREE - SOLITAIRE WORLD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback