WOLLYWOOD PHASE IV
RG-MH-65845 · RERA P99000016676 · Last updated on MahaRERA portal: 22 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
WOLLYWOOD PHASE IV is a Residential / Group Housing project by NIRVANA LIFESTYLE VENTURES in Palghar, Maharashtra, registered with MahaRERA as P99000016676 on 5 Jun 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameWOLLYWOOD PHASE IV
- TypeResidential / Group Housing
- Location
- BHIWANDI WADA ROAD
- GATES BUDRUK
- Gates Bk.
- Vada
- Palghar
- 421303
- Pincode421303
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000016676
- ReraGenie IDRG-MH-65845
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Jun 2018
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
- Buildings76 building records
- Documents filed86 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VILLA 3A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 3B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 4A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 4B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 5A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 5B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 6 | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 7A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 7B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 8A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 8B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 9A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 9B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 10A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 10B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 11A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 11B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 12A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 12B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 13A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 13B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 14A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 14B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 15A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 15B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 16A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 16B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 23A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 23B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 27B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 27A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 29A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 29B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 30A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 30B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 38A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 38B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 39A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 39B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 41A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 41B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 42A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 42B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 43A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 43B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 44A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 44B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 90 | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 91A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 91B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 93A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 93B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 94A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 94B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 95A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 95B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 96A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 96B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 98A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 98B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 99 | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 100 | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 101A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 101B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 102A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 102B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 103A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 103B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 104A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 104B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 105A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 105B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 106A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 106B | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 107A | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA 107B | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 76 buildings; the table lists the first 20.
0 of 836 construction stages are filed complete across 76 buildings. The stage furthest along is Excavation, at 0%.
VILLA 3A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 3B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 4A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 4B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 5A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 5B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 60%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 7A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 7B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 8A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 8B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 9A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 9B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 10A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 10B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 11A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 11B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 12A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 12B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VILLA 13A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | Yes | 10% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 25% |
| Community Buildings | Yes | 85% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 20% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 50% |
Parking filed76
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| VILLA 3A | 1 | 1 |
| VILLA 3B | 1 | 1 |
| VILLA 4A | 1 | 1 |
| VILLA 4B | 1 | 1 |
| VILLA 5A | 1 | 1 |
| VILLA 5B | 1 | 1 |
| VILLA 6 | 1 | 1 |
| VILLA 7A | 1 | 1 |
| VILLA 7B | 1 | 1 |
| VILLA 8A | 1 | 1 |
| VILLA 8B | 1 | 1 |
| VILLA 9A | 1 | 1 |
| VILLA 9B | 1 | 1 |
| VILLA 10A | 1 | 1 |
| VILLA 10B | 1 | 1 |
| VILLA 11A | 1 | 1 |
| VILLA 11B | 1 | 1 |
| VILLA 12A | 1 | 1 |
| VILLA 12B | 1 | 1 |
| VILLA 13A | 1 | 1 |
| VILLA 13B | 1 | 1 |
| VILLA 14A | 1 | 1 |
| VILLA 14B | 1 | 1 |
| VILLA 15A | 1 | 1 |
| VILLA 15B | 1 | 1 |
| VILLA 16A | 1 | 1 |
| VILLA 16B | 1 | 1 |
| VILLA 23A | 1 | 1 |
| VILLA 23B | 1 | 1 |
| VILLA 27B | 1 | 1 |
| VILLA 27A | 1 | 1 |
| VILLA 29A | 1 | 1 |
| VILLA 29B | 1 | 1 |
| VILLA 30A | 1 | 1 |
| VILLA 30B | 1 | 1 |
| VILLA 38A | 1 | 1 |
| VILLA 38B | 1 | 1 |
| VILLA 39A | 1 | 1 |
| VILLA 39B | 1 | 1 |
| VILLA 41A | 1 | 1 |
| VILLA 41B | 1 | 1 |
| VILLA 42A | 1 | 1 |
| VILLA 42B | 1 | 1 |
| VILLA 43A | 1 | 1 |
| VILLA 43B | 1 | 1 |
| VILLA 44A | 1 | 1 |
| VILLA 44B | 1 | 1 |
| VILLA 90 | 1 | 1 |
| VILLA 91A | 1 | 1 |
| VILLA 91B | 1 | 1 |
| VILLA 93A | 1 | 1 |
| VILLA 93B | 1 | 1 |
| VILLA 94A | 1 | 1 |
| VILLA 94B | 1 | 1 |
| VILLA 95A | 1 | 1 |
| VILLA 95B | 1 | 1 |
| VILLA 96A | 1 | 1 |
| VILLA 96B | 1 | 1 |
| VILLA 98A | 1 | 1 |
| VILLA 98B | 1 | 1 |
| VILLA 99 | 1 | 1 |
| VILLA 100 | 1 | 1 |
| VILLA 101A | 1 | 1 |
| VILLA 101B | 1 | 1 |
| VILLA 102A | 1 | 1 |
| VILLA 102B | 1 | 1 |
| VILLA 103A | 1 | 1 |
| VILLA 103B | 1 | 1 |
| VILLA 104A | 1 | 1 |
| VILLA 104B | 1 | 1 |
| VILLA 105A | 1 | 1 |
| VILLA 105B | 1 | 1 |
| VILLA 106A | 1 | 1 |
| VILLA 106B | 1 | 1 |
| VILLA 107A | 1 | 1 |
| VILLA 107B | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DEEPAK HIREMATH ASSOCIATES |
| Engineer | Naik Associates |
| Chartered Accountant | Sanjay R Soni & Associate |
| Partner | Role in project |
|---|---|
| NIRVANA LIFESTYLE VENTURES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere has been a severe loss of materials and labour due to the flood in the project land resulting in delay. Due to lock down the construction work came to a halt for months apart from the labour migrancy to the native state resulting in shortage of labour. Apart from it due to lock resulting in loss in business and jobs
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400877 | GAURAV BHANWARLAL GHATAWAT | NIRVANA LIFESTYLE VENTURES | 23/11/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 May 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 May 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 May 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1(architect certificate) Dec 25 Ready.pdf | 22 Jun 2026 |
| Form 2File: Form 2 Naik associates Dec 25 Ready.pdf | 22 Jun 2026 |
| Form 3File: Form 3 (CA)Certificate NLV Dec 25 phase IV.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked inventory - Wollywood phase IV Sept 25.pdf | 22 Jun 2026 |
| Form 1File: Form 1(architect certificate) Mar 26 Ready.pdf | 22 Jun 2026 |
| Form 2File: Form 2 Naik associates Mar 26 Ready.pdf | 22 Jun 2026 |
| Form 3File: Form 3 (CA)Certificate NLV Mar 26 phase IV.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked inventory - Wollywood phase IV Sept 25.pdf | 22 Jun 2026 |
| Form 1File: Form 1 WW ph IV Sept 25 Compress.pdf | 6 Feb 2026 |
| Form 2File: Form 2 WW IV Sept 25.pdf | 6 Feb 2026 |
| Form 3File: Form 3 nirvana lifestyle phase 4 Signed.pdf | 6 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked inventory - Wollywood phase IV Sept 25.pdf | 6 Feb 2026 |
| Form 1File: Form 1(architect certificate) Mar 25 Ready.pdf | 5 Feb 2026 |
| Form 2File: Form 2 Naik associates Mar 25 Ready.pdf | 5 Feb 2026 |
| Form 3File: Form 3 WW phs IV Mar 25.pdf | 5 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold WW phs IV.pdf | 5 Feb 2026 |
| Form 1File: Form 1(architect certificate).pdf | 5 Feb 2026 |
| Form 2File: Form 2 Naik associates.pdf | 5 Feb 2026 |
| Form 3File: Form 3 WW phs IV.pdf | 5 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold WW phs IV.pdf | 5 Feb 2026 |
| Certificates of CA (Form 3)File: Rera June 2023.pdf | 5 Jun 2025 |
| Certificates of CA (Form 3)File: September 2023.pdf | 5 Jun 2025 |
| Certificates of CA (Form 3)File: December 2023.pdf | 5 Jun 2025 |
| Certificates of CA (Form 3)File: WW Phs IV Jun 24.pdf | 5 Jun 2025 |
| Certificates of CA (Form 3)File: WW phs IV Mar 25.pdf | 5 Jun 2025 |
| Certificates of CA (Form 3)File: WW phs IV Sept 24.pdf | 5 Jun 2025 |
| Certificates of CA (Form 3)File: WW Phs IV Dec 24.pdf | 5 Jun 2025 |
| Certificates of CA (Form 3)File: WW phs IV Mar 25.pdf | 5 Jun 2025 |
| Certificates of CA (Form 3)File: March 2024.pdf | 5 Jun 2025 |
| Details of encumbrances concerned to FinanceFile: legal Encumbrance Certificate.pdf | 4 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(architect certificate) Dec 24.pdf | 4 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(architect certificate) Mar 25 Ready.pdf | 4 Jun 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 24.pdf | 4 Jun 2025 |
| Certificates of CA (Form 3)File: Form 3 Mar 25.pdf | 4 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Naik associates Sept 24 Ready.pdf | 4 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Naik associates Mar 25 Ready.pdf | 4 Jun 2025 |
| Declaration about Commencement CertificateFile: Commencement Certificate.pdf | 4 Jun 2025 |
| CERSAI detailsFile: Cesai Report Wollywood Phase III.pdf | 4 Jun 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration abt Separate bank account.pdf | 4 Jun 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation for Agreement for Sale.pdf | 4 Jun 2025 |
| Details of encumbrances concerned to LegalFile: legal Encumbrance Certificate.pdf | 4 Jun 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation for Agreement for Sale.pdf | 4 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A-Engineers certificate for quality assurance 2022.pdf | 4 Jun 2025 |
| Proforma of Agreement for saleFile: Proforma Agreement for Sale.pdf | 4 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations Sarkar.pdf | 4 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations Bharat Kor.pdf | 4 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations Pravinkumar.pdf | 4 Jun 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Disclosure of Interest in Other Real Estate Organizations Punit Agrwal.pdf | 4 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Engineers certificate for quality assurance 2023.pdf | 4 Jun 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Engineers certificate for quality assurance 2024.pdf | 4 Jun 2025 |
| Certificates of CA (Form 3)File: Form 3 Mar 25.pdf | 9 May 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 24.pdf | 9 May 2025 |
| Certificates of CA (Form 3)File: Form 3 Sept 24.pdf | 9 May 2025 |
| Certificates of CA (Form 3)File: Form 3 Jun 24.pdf | 9 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3 Mar 24.pdf | 9 May 2025 |
| Certificates of CA (Form 3)File: Form 3 Jun 23.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Sept 23.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 23.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Mar 24.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 24.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: Form 5 Mar 25.pdf | 26 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Mar 25.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Naik associates Dec 23 Ready.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Naik associates Mar 24 Ready.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Naik associates Jun 24 Ready.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Naik associates Sept 24 Ready.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(architect certificate) Jun 23 Ready.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(architect certificate) Sept 23 Ready.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(architect certificate) Dec 23 Ready.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(architect certificate) Mar 24 Ready.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(architect certificate) Jun 24 Ready.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(architect certificate) Sept 24 Ready.pdf | 11 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Naik associates Jun 23 Ready.pdf | 11 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Naik associates Sept 23 Ready.pdf | 11 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 3 Phase IV WW.pdf | 6 Mar 2024 |
| Certificates of CA (Form 3)File: CA CERTIFICATE (1)-ilovepdf-compressed.pdf | 26 May 2018 |
| Proforma of Allotment letterFile: Proforma of Allotment.pdf | 25 May 2018 |
| Building plan approvalFile: IOD.pdf | 24 May 2018 |
| Layout approvalFile: MAIN LAYOUT PLAN.pdf | 24 May 2018 |
| PAN CardFile: PAN CARD.pdf | 24 May 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| WOLLYWOOD PHASE 1 | GATES BUDRUK SHISHIR PADA BHIWANDI WADA ROAD WADA PALGHAR | 312 | Completed | Apr 2017 | Apr 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep WOLLYWOOD PHASE IV on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GATES BUDRUK3,200+ in Palghar
Filed coordinates, straight-line distance. 5 registered projects within 2 km.
WOLLYWOOD PHASE VI
NIRVANA LIFESTYLE VENTURES
Greenway
Greenway Properties
Rajeshree Plaza
Liva Infra Builders and Developers
ELEMENTS
MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE
BALKRUSHNA SANKUL
Sai Construction
Sontakke Arcade
SIDDHIVINAYAK DEVELOPERS
See every Palghar project, with the district possession charts
Builder: NIRVANA LIFESTYLE VENTURES
NIRVANA LIFESTYLE VENTURES has 5 registrations on MahaRERA, including WOLLYWOOD PHASE II and WOLLYWOOD PHASE III. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if WOLLYWOOD PHASE IV is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of WOLLYWOOD PHASE IV?
The registered promoter entity is NIRVANA LIFESTYLE VENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in WOLLYWOOD PHASE IV?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against WOLLYWOOD PHASE IV?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for WOLLYWOOD PHASE IV?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at WOLLYWOOD PHASE IV?
The professionals named in the filing: Architect: DEEPAK HIREMATH ASSOCIATES; Engineer: Naik Associates; Chartered Accountant: Sanjay R Soni & Associate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in WOLLYWOOD PHASE IV?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.