Home / Browse projects / Palghar, Maharashtra / ELEMENTS

Registered No litigation declared Residential / Group Housing project

ELEMENTS

By MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED

RG-MH-06965 · RERA P99000054499 · Last updated on MahaRERA portal: 4 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 154Construction stages doneacross 14 buildings; furthest along: Excavation, 0%
114 of 126Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

ELEMENTS is a Residential / Group Housing project by MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000054499 on 25 Jan 2024. Possession is promised by 31 Dec 2026. 12 of the 126 units on this registration are recorded sold or booked, and 0 of 154 construction stages are filed complete.

At a glance

Project

  • NameELEMENTS
  • TypeResidential / Group Housing
  • Location
    • SUPONDE ROAD
    • WADA-MANOR ROAD
    • KANCHAD
    • Vada
    • Palghar
    • 421303
  • Pincode421303
  • RERA no.P99000054499
  • ReraGenie IDRG-MH-06965

Builder

  • NameMAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsKAMAL HASMUKHBHAI SHAH, KRUNAL MANHAR PANDYA, MITESH SUMANT SHAH, MUKESH HARKISHANDAS MODI

Key dates

this monthRegisteredJan 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings14 building records
  • Documents filed62 files

Current status

10%12 of 126 units booked

Figures as on 4 Mar 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1 Type C and C1NA661050105
Building No 3 Type BNA22101
Building No 11 Type D1NA22101
Building No 5 Type A and A1NA22202
Building No 6 Type A and A1NA22202
Building No 7 Type A and A1NA22202
Building No 8 Type A and A1NA22202
Building No 9 Type ANA22101
Building No 10 Type DNA22101
Building No 12 Type A1NA22101
Building No 13 Type A and A1NA22202
Building No 14 Type A and A1NA22404
Building No 15 Type A and A1NA22202
Building No 16 Type A and A1NA22000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building14

As on 4 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is Excavation, at 0%.

Building No 1 Type C and C10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 3 Type B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 11 Type D10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 5 Type A and A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 6 Type A and A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 7 Type A and A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 8 Type A and A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 9 Type A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 10 Type D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 12 Type A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 13 Type A and A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 14 Type A and A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 15 Type A and A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 16 Type A and A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14
BuildingClosed/CoveredTotal
Building No 1 Type C and C111
Building No 3 Type B11
Building No 11 Type D111
Building No 5 Type A and A111
Building No 6 Type A and A111
Building No 7 Type A and A111
Building No 8 Type A and A111
Building No 9 Type A11
Building No 10 Type D11
Building No 12 Type A111
Building No 13 Type A and A111
Building No 14 Type A and A111
Building No 15 Type A and A111
Building No 16 Type A and A111

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,248 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Feb 2026

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE PALGHAR
Permissible FSI9600.49
Proposed, not sanctioned9,600 sq m
Buildings approved14
Buildings sanctioned14

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPROFIT CENTRE SHOP NO 31 90FT ROAD, MAHAVIR NAGAR, KANDIVALI WEST, MUMBAI 400 067

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNISHANT PATIL
EngineerQamrul Hasan
Chartered AccountantASHISH J PARMAR
Chartered AccountantBHUSHAN RAMANI & ASSOCIATES
PartnerRole in project
MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 03 24.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 06 24.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 09 24.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 12 24.pdf4 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jan - march 24.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: april to june 24.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: july to sep 24.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: oct to dec 24.pdf25 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA FORM 5 23-24.pdf24 Feb 2025
Proforma of Allotment letterFile: Conveyance Plot No 24 INDEX 2.pdf18 Jan 2024
Deviation Report with respect to Allotment letterFile: Conveyance Plot No 24 INDEX 2.pdf18 Jan 2024
Proforma of Allotment letterFile: Allotment letter.pdf15 Jan 2024
Proforma of Allotment letterFile: Index 2 Plot No5.pdf15 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment letter.pdf15 Jan 2024
Deviation Report with respect to Allotment letterFile: Index 2 Plot No5.pdf15 Jan 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance .pdf26 Dec 2023
Details of encumbrances concerned to LegalFile: No Encumbrance .pdf26 Dec 2023
CERSAI detailsFile: Cresai Declaration .pdf26 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Clause Agreement for sale.pdf26 Dec 2023
Other - TechnicalFile: Format D.pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf12 Dec 2023
Layout approvalFile: Plans Highlighted.pdf7 Dec 2023
Copy of Layout Approval (in case of layout)File: Plans Highlighted.pdf7 Dec 2023
Declaration in FORM BFile: 1 Declaration in FORM B.pdf7 Dec 2023
Details of encumbrances concerned to FinanceFile: No encumbrance self declaration .pdf27 Nov 2023
Details of encumbrances concerned to LegalFile: No encumbrance self declaration .pdf27 Nov 2023
Other - LegalFile: Conveyance deed index 2.pdf25 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DOI.pdf16 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Mayurvan Format A.pdf16 Nov 2023
Copy of the legal title reportFile: Title Certificate Mayurvan for RERA (1)_35-end.pdf30 Oct 2023
Building plan approvalFile: NA Order.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan Studio Building C.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan Studio Building C Extension.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan Layout.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan 3BHK Bunglow Left A.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan 3BHK Bunglow Right A1.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan 4BHK Bunglow B.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan Studio Building C1.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan Studio Building C1 Extension.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan D Bunglow One Villa.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan D1 Bunglow Maheshbhai.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan Clubhouse.pdf27 Oct 2023
Layout approvalFile: AP Mayurvan Studio Maheshbhai.pdf27 Oct 2023
PAN CardFile: PAN COMP.pdf27 Oct 2023
Copy of the legal title reportFile: Title Certificate Mayurvan for RERA (1)_1-34.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan Layout.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan 3BHK Bunglow Left A.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan 3BHK Bunglow Right A1.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan 4BHK Bunglow B.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan Studio Building C.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan Studio Building C Extension.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan Studio Building C1.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan Studio Building C1 Extension.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan D Bunglow One Villa.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan D1 Bunglow Maheshbhai.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan Clubhouse.pdf27 Oct 2023
Copy of Layout Approval (in case of layout)File: AP Mayurvan Studio Maheshbhai.pdf27 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf27 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf27 Oct 2023
Declaration about Commencement CertificateFile: CC Covering Letter (5).pdf27 Oct 2023
Proforma of Agreement for saleFile: Rera Agreement.pdf27 Oct 2023

How this compares with Palghar

10%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ELEMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANCHAD3,200+ in Palghar

Builder: MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED

MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED has 1 registration on MahaRERA, including ELEMENTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if ELEMENTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ELEMENTS?

The registered promoter entity is MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ELEMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ELEMENTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ELEMENTS?

The professionals named in the filing: Architect: NISHANT PATIL; Engineer: Qamrul Hasan; Chartered Accountant: ASHISH J PARMAR; Chartered Accountant: BHUSHAN RAMANI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ELEMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ELEMENTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ELEMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.