Home / Browse projects / Palghar, Maharashtra / ELEMENTS
ELEMENTS
By MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED
RG-MH-06965 · RERA P99000054499 · Last updated on MahaRERA portal: 4 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ELEMENTS is a Residential / Group Housing project by MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000054499 on 25 Jan 2024. Possession is promised by 31 Dec 2026. 12 of the 126 units on this registration are recorded sold or booked, and 0 of 154 construction stages are filed complete.
At a glance
Project
- NameELEMENTS
- TypeResidential / Group Housing
- Location
- SUPONDE ROAD
- WADA-MANOR ROAD
- KANCHAD
- Vada
- Palghar
- 421303
- Pincode421303
- RERA no.P99000054499
- ReraGenie IDRG-MH-06965
Builder
- NameMAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED
- Entity typeCompany
- DirectorsKAMAL HASMUKHBHAI SHAH, KRUNAL MANHAR PANDYA, MITESH SUMANT SHAH, MUKESH HARKISHANDAS MODI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Jan 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings14 building records
- Documents filed62 files
Current status
Figures as on 4 Mar 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No 1 Type C and C1 | NA | 6 | 6 | 105 | 0 | 105 |
| Building No 3 Type B | NA | 2 | 2 | 1 | 0 | 1 |
| Building No 11 Type D1 | NA | 2 | 2 | 1 | 0 | 1 |
| Building No 5 Type A and A1 | NA | 2 | 2 | 2 | 0 | 2 |
| Building No 6 Type A and A1 | NA | 2 | 2 | 2 | 0 | 2 |
| Building No 7 Type A and A1 | NA | 2 | 2 | 2 | 0 | 2 |
| Building No 8 Type A and A1 | NA | 2 | 2 | 2 | 0 | 2 |
| Building No 9 Type A | NA | 2 | 2 | 1 | 0 | 1 |
| Building No 10 Type D | NA | 2 | 2 | 1 | 0 | 1 |
| Building No 12 Type A1 | NA | 2 | 2 | 1 | 0 | 1 |
| Building No 13 Type A and A1 | NA | 2 | 2 | 2 | 0 | 2 |
| Building No 14 Type A and A1 | NA | 2 | 2 | 4 | 0 | 4 |
| Building No 15 Type A and A1 | NA | 2 | 2 | 2 | 0 | 2 |
| Building No 16 Type A and A1 | NA | 2 | 2 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building14
As on 4 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is Excavation, at 0%.
Building No 1 Type C and C10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 3 Type B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 11 Type D10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 5 Type A and A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 6 Type A and A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 7 Type A and A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 8 Type A and A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 9 Type A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 10 Type D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 12 Type A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 13 Type A and A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 14 Type A and A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 15 Type A and A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building No 16 Type A and A10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building No 1 Type C and C1 | 1 | 1 |
| Building No 3 Type B | 1 | 1 |
| Building No 11 Type D1 | 1 | 1 |
| Building No 5 Type A and A1 | 1 | 1 |
| Building No 6 Type A and A1 | 1 | 1 |
| Building No 7 Type A and A1 | 1 | 1 |
| Building No 8 Type A and A1 | 1 | 1 |
| Building No 9 Type A | 1 | 1 |
| Building No 10 Type D | 1 | 1 |
| Building No 12 Type A1 | 1 | 1 |
| Building No 13 Type A and A1 | 1 | 1 |
| Building No 14 Type A and A1 | 1 | 1 |
| Building No 15 Type A and A1 | 1 | 1 |
| Building No 16 Type A and A1 | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NISHANT PATIL |
| Engineer | Qamrul Hasan |
| Chartered Accountant | ASHISH J PARMAR |
| Chartered Accountant | BHUSHAN RAMANI & ASSOCIATES |
| Partner | Role in project |
|---|---|
| MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 03 24.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 06 24.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 09 24.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 12 24.pdf | 4 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 4 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jan - march 24.pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: april to june 24.pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: july to sep 24.pdf | 25 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: oct to dec 24.pdf | 25 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA FORM 5 23-24.pdf | 24 Feb 2025 |
| Proforma of Allotment letterFile: Conveyance Plot No 24 INDEX 2.pdf | 18 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Conveyance Plot No 24 INDEX 2.pdf | 18 Jan 2024 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 15 Jan 2024 |
| Proforma of Allotment letterFile: Index 2 Plot No5.pdf | 15 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment letter.pdf | 15 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Index 2 Plot No5.pdf | 15 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance .pdf | 26 Dec 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance .pdf | 26 Dec 2023 |
| CERSAI detailsFile: Cresai Declaration .pdf | 26 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Clause Agreement for sale.pdf | 26 Dec 2023 |
| Other - TechnicalFile: Format D.pdf | 26 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf | 12 Dec 2023 |
| Layout approvalFile: Plans Highlighted.pdf | 7 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: Plans Highlighted.pdf | 7 Dec 2023 |
| Declaration in FORM BFile: 1 Declaration in FORM B.pdf | 7 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrance self declaration .pdf | 27 Nov 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrance self declaration .pdf | 27 Nov 2023 |
| Other - LegalFile: Conveyance deed index 2.pdf | 25 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DOI.pdf | 16 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Mayurvan Format A.pdf | 16 Nov 2023 |
| Copy of the legal title reportFile: Title Certificate Mayurvan for RERA (1)_35-end.pdf | 30 Oct 2023 |
| Building plan approvalFile: NA Order.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan Studio Building C.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan Studio Building C Extension.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan Layout.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan 3BHK Bunglow Left A.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan 3BHK Bunglow Right A1.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan 4BHK Bunglow B.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan Studio Building C1.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan Studio Building C1 Extension.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan D Bunglow One Villa.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan D1 Bunglow Maheshbhai.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan Clubhouse.pdf | 27 Oct 2023 |
| Layout approvalFile: AP Mayurvan Studio Maheshbhai.pdf | 27 Oct 2023 |
| PAN CardFile: PAN COMP.pdf | 27 Oct 2023 |
| Copy of the legal title reportFile: Title Certificate Mayurvan for RERA (1)_1-34.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan Layout.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan 3BHK Bunglow Left A.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan 3BHK Bunglow Right A1.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan 4BHK Bunglow B.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan Studio Building C.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan Studio Building C Extension.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan Studio Building C1.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan Studio Building C1 Extension.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan D Bunglow One Villa.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan D1 Bunglow Maheshbhai.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan Clubhouse.pdf | 27 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: AP Mayurvan Studio Maheshbhai.pdf | 27 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf | 27 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf | 27 Oct 2023 |
| Declaration about Commencement CertificateFile: CC Covering Letter (5).pdf | 27 Oct 2023 |
| Proforma of Agreement for saleFile: Rera Agreement.pdf | 27 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 62 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ELEMENTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KANCHAD3,200+ in Palghar
WOLLYWOOD PHASE VI
NIRVANA LIFESTYLE VENTURES
Greenway
Greenway Properties
Rajeshree Plaza
Liva Infra Builders and Developers
BALKRUSHNA SANKUL
Sai Construction
Sontakke Arcade
SIDDHIVINAYAK DEVELOPERS
Govardhan Kunj
Bhakti Nilayam Private Limited
See every Palghar project, with the district possession charts
Builder: MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED
MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED has 1 registration on MahaRERA, including ELEMENTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if ELEMENTS is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ELEMENTS?
The registered promoter entity is MAYUR VAN CLUB AND HOLIDAY RESORTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ELEMENTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ELEMENTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ELEMENTS?
The professionals named in the filing: Architect: NISHANT PATIL; Engineer: Qamrul Hasan; Chartered Accountant: ASHISH J PARMAR; Chartered Accountant: BHUSHAN RAMANI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ELEMENTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback