Home / Browse projects / Pune, Maharashtra / WILDWOODS 2 PHASE II

Completed No litigation declared Residential / Group Housing project

WILDWOODS 2 PHASE II

By Manav Homes Wagholi

RG-MH-23053 · RERA P52100048839 · Last updated on MahaRERA portal: 7 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Staircases, 85%
0 of 92Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

WILDWOODS 2 PHASE II is a Residential / Group Housing project by Manav Homes Wagholi in Pune, Maharashtra, registered with MahaRERA as P52100048839 on 24 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2024. 92 of the 92 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameWILDWOODS 2 PHASE II
  • TypeResidential / Group Housing
  • Location
    • BAIF ROAD
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100048839
  • ReraGenie IDRG-MH-23053

Builder

  • NameManav Homes Wagholi
  • Entity typePartnership
  • PartnersRAHUL MANSUKHLAL KHATER, MANAV PROPERTIES LLP PRAMOD MOHANLAL BAFNA
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jan 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

100%92 of 92 units booked
98.0%Work done, per cost certificate

Figures as on 7 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WING/BUILDINGNA15092092

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

B WING/BUILDING: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 7 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,020 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024
LandownerVillageDistrict
MR SHRIRANG BHAGWANTRAO MORE-Pune
MR VILAS BHAGWANTRAO MORE-Pune
MR ASHOK BHAGWANTRAO MORE-Pune
MR JAGDISH BHAGWANTRAO MORE-Pune
MR SHIVRAM BHAGWANTRAO MORE-Pune

Approvals and building plan

Permissible FSI7351.88
Proposed, not sanctioned5,752 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE SATARA ROAD PARVATI DARSHAN PUNE
Estimated costRs 15.79 cr
Cost incurredRs 15.48 cr
Work done98.0%
BuildingWingEstimatedIncurred
B WING/BUILDINGNARs 14.61 crRs 14.32 cr
-NARs 1.18 crRs 1.16 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Imran Shaikh
ArchitectCRYSTAL ARCH
EngineerMr Premkumar Somani
Chartered AccountantPatel & Sharma
Chartered AccountantASAK & Co
PartnerRole in project
Manav Homes Wagholi-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Mar 2024

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure Fform 5.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure Fform 5.pdf7 Oct 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate Wildwoods 2 CO OP.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: WILDWOODS 2 PH 2 Form 2A_FY 23-24.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 WW2PHASE2_11zon.pdf29 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 WWD 2 PH II.pdf25 May 2024
Disclosure of sold/ booked inventoryFile: WWD 2 Ph II - Sold Unsold Declaration.pdf15 May 2024
Disclosure of sold/ booked inventoryFile: Wildwoods 2 Phase II - Sold Unsold Declaration Updated.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE WING B - 15032023.pdf29 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Revised Form-4_29032024.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 WWD 2 PH II.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: wwd ph II b wing.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Wildwoods 2 Ph II B wing.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 WWD.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: F5 (MANAV HOMES WAGHOLI) WWD 2 PH II.pdf9 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Wildwoods 2 phII (B)_Form 2A.pdf5 Jan 2024
Disclosure of sold/ booked inventoryFile: WW 2 Ph II.pdf3 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_MHW_compressed.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 WWB 2 B wing.pdf28 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 MHW dt_300923.pdf28 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Wildwoods Mar23.pdf8 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Unslod Wildwoods June23.pdf8 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Wildwoods 2 Ph II B wing.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 WW 2 PH II.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 WW 2 Ph II.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: wildwoods 2 ph II B.pdf10 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WWD2 Ph 2 B Wing From 2 .pdf10 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: wildwood ph II.pdf10 May 2023
Proforma of Agreement for saleFile: FinalDraft.pdf15 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation_compressed (2).pdf15 Feb 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf17 Jan 2023
Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf17 Jan 2023
Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development.pdf17 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf17 Jan 2023
Other - TechnicalFile: Area Declaration.pdf17 Jan 2023
Building plan approvalFile: 02_06_compressed.pdf16 Jan 2023
Building plan approvalFile: 03_06_compressed.pdf16 Jan 2023
Building plan approvalFile: 04_06_compressed.pdf16 Jan 2023
Building plan approvalFile: 05_06_compressed.pdf16 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 02_06_compressed.pdf16 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 03_06_compressed.pdf16 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 04_06_compressed.pdf16 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 05_06_compressed.pdf16 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annerxure A .pdf7 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annerxure A -1.pdf7 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annerxure A -2.pdf7 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annerxure A -3.pdf7 Jan 2023
CERSAI detailsFile: Wildwoods 2 Phase II CERSAI_Search_Report_200255999119_For_Asset_Based_Search_28_12_2022_128 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Dec 2022
Proforma of Allotment letterFile: 18 Model Form of Allotment Letter.pdf19 Dec 2022
Building plan approvalFile: 14 Sanction Layout_compressed (1).pdf17 Dec 2022
Copy of the legal title reportFile: 17 Legal Title Report_compressed (1).pdf17 Dec 2022
Details of encumbrances concerned to FinanceFile: 08 Finance Encumbraces.pdf17 Dec 2022
Details of encumbrances concerned to FinanceFile: 09 Legal Encumbraces.pdf17 Dec 2022
Details of encumbrances concerned to LegalFile: 08 Finance Encumbraces.pdf17 Dec 2022
Details of encumbrances concerned to LegalFile: 09 Legal Encumbraces.pdf17 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: 14 Sanction Layout_compressed (1).pdf17 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: 15 Commecement Certificate.pdf17 Dec 2022
Declaration about Commencement CertificateFile: 16 Declaration abt Commencement.pdf17 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Dec 2022
Proforma of Agreement for saleFile: 16 Agreement for RERA.pdf17 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 23 Declaraion abt Separate Bank AC.pdf17 Dec 2022
Deviation Report with respect to Allotment letterFile: 21 Deviation in Allotment.pdf17 Dec 2022
Deviation Report with respect to model copy of AgreementFile: 20 Deviation in Agreement.pdf17 Dec 2022
PAN CardFile: PAN.pdf21 Dec 2021
Declaration in FORM BFile: Form B of Manav Homes Wagholi _compressed.pdf21 Dec 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
WILDWOODS 2 PHASE IGAT NO 1201 WAGHOLI PUNE87CompletedJun 2022Nov 2020

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WILDWOODS 2 PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

Builder: Manav Homes Wagholi

MANAV HOMES WAGHOLI has 2 registrations on MahaRERA, including WILDWOODS 2 PHASE I and WILDWOODS 2 PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if WILDWOODS 2 PHASE II is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WILDWOODS 2 PHASE II?

The registered promoter entity is Manav Homes Wagholi, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WILDWOODS 2 PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WILDWOODS 2 PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WILDWOODS 2 PHASE II?

The professionals named in the filing: Architect: Ar Imran Shaikh; Architect: CRYSTAL ARCH; Engineer: Mr Premkumar Somani; Chartered Accountant: Patel & Sharma; Chartered Accountant: ASAK & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WILDWOODS 2 PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WILDWOODS 2 PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WILDWOODS 2 PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.