WHITE CITY PHASE 2 WING B
By RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED
RG-MH-11565 · RERA P51800008324 · Last updated on MahaRERA portal: 6 Feb 2023
Source: official MahaRERA filing
Red flags
- 34 complaints at MahaRERA
- Completion date moved by 44 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
WHITE CITY PHASE 2 WING B is a Residential / Group Housing project by RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008324 on 18 Aug 2017. The registration is recorded completed; possession was promised by 28 Feb 2023. The completion date has moved by 44 months from the original filing. 184 of the 186 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 34 complaints are on record with the regulator.
At a glance
Project
- NameWHITE CITY PHASE 2 WING B
- TypeResidential / Group Housing
- Location
- AKURLI ROAD
- KANDIVALI
- Borivali
- Mumbai Suburban
- 400101
- Pincode400101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800008324
- ReraGenie IDRG-MH-11565
Builder
- NameRAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED
- Entity typeCompany
- CINU70102MH2006PTC166268
- MgrAAAA AAAA
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Aug 2017
- Promised completion28 Feb 2023
- Revised completionRevised to 28 Feb 2023 (originally 30 Jun 2019)
- Buildings1 building record
- Documents filed62 files
Current status
Figures as on 6 Feb 2023, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WHITE CITY PHASE 2 WING B | NA | 46 | 0 | 186 | 0 | 186 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 0%.
WHITE CITY PHASE 2 WING B: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 6 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| CLUB HOUSE | Yes | 100% |
Parking filed352
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WHITE CITY PHASE 2 WING B | NA | Rs 129.15 cr | Rs 90.26 cr |
| - | NA | Rs 8.19 cr | Rs 1.21 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SPACE AGE CONSULTANTS |
| Architect | VILAS DESAI & ASSOCIATES |
| Engineer | K C SHAH DESIGNS LLP |
| Chartered Accountant | Chirag Bharat Sarvaiya |
| Chartered Accountant | M S K A & Associates |
| Partner | Role in project |
|---|---|
| RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe reason for delay are as follows: 1. Majority of our customers were seeking 98% Home Loan Finance. The loans were sanctioned and / or under process for sanction majorly by NBFC’s. Since September 2018 there has been a liquidity crunch at these NBFC’s hence they are not able to disburse funds which in turn affected our construction progress leading to a virtual halt in construction activities. Further to add to the woes: a) The institutions which were earlier funding upto 98% put a cap on funding of upto 90% on cost of house. This lead to delays in receipt of payments as customers had to mak
Reason as filed by the promoterWe Rajesh Real Estate Developers Private Limited the promoter / developer of the Project ‘Whitecity Phase 2 Wing B’, earlier registered vide registration no. P51800008324, under the provision of Real Estate (Development and Regulation) Act, 2016 (“Act”) (hereinafter referred to as the “Project”). The aforesaid registrations for the Project were valid from 18th August 2017 to 30th June 2019 and were then extended to 29th December 2020. The Project was envisaged to be completed by the aforesaid dates, however, due to massive disruptions at the industry level coupled with major regulatory and fin
Complaints filed with MahaRERA34
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000110775 | Gautam Harshe | Rajesh Real estate developers pvt ltd. | 11/11/2019 |
| CC006000000110788 | Vineet Chhabra and Kanika Chhabra | Rajesh Real Estate Developers Private Limited | 15/09/2019 |
| CC006000000197119 | Tarang Goyal | Rajesh Real Estate Developers Pvt. Ltd. | 02/07/2021 |
| CC006000000194026 | Satish Sharma | Rajesh Real Estate Developers Private Limited | 29/09/2020 |
| CC006000000194830 | Anand Shankar Nair and Bhavana Anand Nair | Rajesh Real Estate Developers Private Limited | 06/11/2020 |
| CC006000000195703 | Mr.Vasant Sachidanand Pandit and Mrs.Gayatri Vasant Pandit | Rajesh Real Estate Developers Private Limited | 10/02/2021 |
| CC006000000195724 | Mrs. Kavita Prabhakar and Mr. Prabhakar Varadarajan | Rajesh Real Estate Developers Private Limited | 16/02/2021 |
| CC006000000195677 | AMIT KUMAR JHA | RAJESH REAL ESTATE DEVELOPERS PVT LTD | 22/05/2021 |
| CC006000000195813 | PIYUSH K PATEL | RAJESH REAL ESTATE DEVELOPER PVT LTD | 01/02/2021 |
| CC006000000195815 | KETAN DINKARRAY RAVAL | RAJESH REAL ESTATE DEVELOPER PVT LTD | 01/02/2021 |
| CC006000000195898 | UMESH KISHANCHAND LALJANI | RAJESH REAL ESTATE DEVELOPER PVT. LTD | 09/02/2021 |
| CC006000000196282 | Ramanik Pevekar | Rajesh Real Estate Developers Pvt Ltd | 08/03/2021 |
| CC006000000197890 | Kamaljeet Singh | VISHAL DOSHI | 05/08/2021 |
| CC006000000197932 | Mina Chandrakant Joshi | Rajesh Real Estate Developers Private Limited | 08/08/2021 |
| CC006000000220988 | Inder Singh Parihar | Rajesh Real Estate Developers Private Limited | 06/05/2022 |
| CC006000000221102 | Ketan Dinkarray Raval | Rajesh Real Estate Developer Pvt.Ltd | 09/05/2022 |
| CC006000000221109 | sanjay Nainmal Agarwal | RAJESH REAL ESTATE DEEVELOPERS PVT LTD | 07/05/2022 |
| CC006000000221124 | Umesh Kishanchand Laljani | Rajesh Real Estate Developer Pvt ltd | 09/05/2022 |
| CC006000000221125 | Piyush p Patel | Rajesh Real Estate Developer PVt. Ltd | 09/05/2022 |
| CC006000000251438 | SEEMA AGARWAL | RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED | 14/06/2022 |
| CC006000000251439 | BANARSILAL TIBREWAL | RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED | 14/06/2022 |
| CC006000000251440 | RAVI SINGHANIA | RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED | 14/06/2022 |
| CC006000000251441 | MEENADEVI SANGHAI | RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED | 14/06/2022 |
| CC006000000251469 | TEJA SINGH BASSAN | RAJESH REAL ESTATE DEVELOPERS PVT LTD | 15/06/2022 |
| CC006000000261965 | Prakash Kumar Rameshwar Sanghai | Rajesh Real Estate Developers Private Limited | 20/07/2022 |
| CC006000000292515 | DILIPKUMAR MEHTA | RAJESH REAL ESTATE DEVELOPERS PVT LTD | 30/08/2022 |
| CC006000000302977 | DAMYANTI PALTA | RAJESH REAL ESTATE DEVELOPERS PVT LTD | 10/10/2022 |
| CC006000000303314 | DR MADHUKAR SHRI KRISHNA NILMANI | MESSERS RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED | 13/11/2022 |
| CC006000000375366 | jaise isaac | Pratik Patel ( Director) | 24/04/2023 |
| CC006000000198653 | Bhajan Singh Choudhary | Rajesh Real Estate Developers Private Limited | 12/10/2021 |
| CC006000000396979 | RAJESH REAL ESTATE DEVELOPERS PVT. LTD. THROUGH AUTHORISED SIGNATORY | KAMALJEET SINGH | 07/08/2023 |
| CC006000000397046 | Tarang Goyal | Rajesh Real Estate Developers Pvt. Ltd. | 11/08/2023 |
| CC006000000479768 | Balbir Prasad | RAHEJA REAL ESTATE DEVELOPERS PVT LTD | 26/03/2024 |
| CC12503264 | Girish NAROTTAMDAS Ved | RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED | 13/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Dec 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Dec 2022
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 RERA RREDPL 21-22 Wing B_Attested.pdf | 6 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KWC-Wing A B.pdf | 22 Dec 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Whitecity Phase 2 Wing B.pdf | 5 Dec 2022 |
| CERSAI detailsFile: CERSAI-1.pdf | 12 Jan 2022 |
| CERSAI detailsFile: CERSAI-2.pdf | 12 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5-Wing B FY1819.pdf | 8 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5-Wing B FY1920.pdf | 8 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RREDPL Form 5 Whitecity Wing B 31 03 2021.pdf | 8 Jan 2022 |
| Declaration about Commencement CertificateFile: Declaration for CC WC2.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 2019.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 2020.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 2021.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: June 2021.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sep 2021.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 2021.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: June 2021.pdf | 28 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sep 2021.pdf | 28 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Booking.pdf | 28 Dec 2021 |
| Layout approvalFile: IOD_compressed.pdf | 27 Dec 2021 |
| Building plan approvalFile: IOD_compressed.pdf | 27 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: IOD_compressed.pdf | 27 Dec 2021 |
| Building Plan Approval (IOD)File: IOD_compressed.pdf | 27 Dec 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White city Wing B Engineer Cft 30-07-2019.pdf | 24 Sep 2019 |
| Certificates of CA (Form 3)File: WHITE CITY PHASE 2 WING B CA CERTIFICATE.pdf | 28 Jun 2019 |
| Certificates of CA (Form 5)File: Annual Report on Statement of Accounts.pdf | 30 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Whitecity RERA Certificate B Wing ARC_Compressed.pdf | 13 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City Wing B 30_04_2019.pdf | 9 May 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE WHITECITY PHASE 2 - B WING 050219.pdf | 8 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City Wing B 05_02_2019.pdf | 20 Feb 2019 |
| Certificates of CA (Form 3)File: White City B Wing Phase II 28Nov18.pdf | 13 Feb 2019 |
| Certificates of CA (Form 3)File: WHITE CITY WING B PHASE 2 - 20082018.pdf | 2 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: White City PH2 151118 ARC.pdf | 17 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: White City PH2 B Wing 200818 ARC COMP.pdf | 17 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: White City B wing PH2 310518.pdf | 17 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City B wing.pdf | 4 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City B wing 20_08_18.pdf | 22 Nov 2018 |
| Certificates of CA (Form 3)File: WHITE CITY B WING PHASE 2 31052018.pdf | 6 Nov 2018 |
| Certificates of CA (Form 3)File: CA CERT WC PHASE 2.pdf | 20 Jul 2018 |
| Details of encumbrancesFile: Encum pdf WC 29062018.pdf | 29 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Whitecity Wing B_Compressed.pdf | 13 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: White City Phase 2 Dec-17 Architect Com.pdf | 9 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City B wing 06_03_18.pdf | 9 Apr 2018 |
| Certificates of CA (Form 3)File: Whitecity Phase B.pdf | 3 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City B wing 06_01_18.pdf | 7 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WhiteCity B.pdf | 15 Nov 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City B wing.pdf | 15 Nov 2017 |
| Certificates of CA (Form 3)File: WHITECITY B.pdf | 15 Nov 2017 |
| Declaration in FORM BFile: White City Phase II.pdf | 30 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: WHITE CITY PHASE 2.pdf | 30 Jul 2017 |
| Certificates of CA (Form 3)File: White City Phase 2.pdf | 30 Jul 2017 |
| OtherFile: White City Additional Declaration.pdf | 30 Jul 2017 |
| OtherFile: WHITE CITY FUTURE DEVELOPMENT PLAN.pdf | 30 Jul 2017 |
| Layout approvalFile: 001.pdf | 29 Jul 2017 |
| Building plan approvalFile: IOD COPY.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 001.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: IOD COPY.pdf | 29 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: White City - AFS P2 pdf.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WING-B.pdf | 24 Jul 2017 |
| Copy of the legal title reportFile: White City - Title Report.pdf | 20 Jul 2017 |
| PAN CardFile: RREDPL PAN CARD.pdf | 18 Jul 2017 |
| Details of encumbrancesFile: White City.pdf | 18 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
Keep WHITE CITY PHASE 2 WING B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KANDIVALI6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 391 registered projects within 2 km.
Sheetal Uptown
SIDHESHWAR LIFESPACES PRIVATE LIMITED
ENSO SANZA
Sai Aastha Developers
SPRINGWOODS
PRATIK CONSTRUCTION
Godrej Nest
Shivam Megastructures Pvt Ltd
PATON TOWERS
PRAVIN VIRAM SATRA
Godrej Bliss
SHIVAM DEVELOPERS
See every Mumbai Suburban project, with the district possession charts
Builder: RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED
RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including WHITE CITY PHASE 2 WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if WHITE CITY PHASE 2 WING B is delayed beyond 28 Feb 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of WHITE CITY PHASE 2 WING B?
The registered promoter entity is RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U70102MH2006PTC166268 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in WHITE CITY PHASE 2 WING B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against WHITE CITY PHASE 2 WING B?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for WHITE CITY PHASE 2 WING B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at WHITE CITY PHASE 2 WING B?
The professionals named in the filing: Architect: SPACE AGE CONSULTANTS; Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH DESIGNS LLP; Chartered Accountant: Chirag Bharat Sarvaiya; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in WHITE CITY PHASE 2 WING B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback