Home / Browse projects / Mumbai Suburban, Maharashtra / WHITE CITY PHASE 2 WING B

Completed No litigation declared Residential / Group Housing project

WHITE CITY PHASE 2 WING B

By RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED

RG-MH-11565 · RERA P51800008324 · Last updated on MahaRERA portal: 6 Feb 2023

Source: official MahaRERA filing

Red flags

  • 34 complaints at MahaRERA
  • Completion date moved by 44 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Feb 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 0%
2 of 186Units unsoldnot recorded sold or booked
34Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

WHITE CITY PHASE 2 WING B is a Residential / Group Housing project by RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008324 on 18 Aug 2017. The registration is recorded completed; possession was promised by 28 Feb 2023. The completion date has moved by 44 months from the original filing. 184 of the 186 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 34 complaints are on record with the regulator.

At a glance

Project

  • NameWHITE CITY PHASE 2 WING B
  • TypeResidential / Group Housing
  • Location
    • AKURLI ROAD
    • KANDIVALI
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008324
  • ReraGenie IDRG-MH-11565

Builder

  • NameRAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU70102MH2006PTC166268
  • MgrAAAA AAAA

Key dates

this monthRegisteredAug 2017First promiseJun 2019Revised toFeb 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion28 Feb 2023
  • Revised completionRevised to 28 Feb 2023 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed62 files

Current status

99%184 of 186 units booked
66.6%Work done, per cost certificate

Figures as on 6 Feb 2023, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WHITE CITY PHASE 2 WING BNA4601860186

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 0%.

WHITE CITY PHASE 2 WING B: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 6 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
CLUB HOUSEYes100%

Parking filed352

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots352
Closed/Covered321
Open Space31

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area795 sq m
Land owned byThe promoter
Named landownersNone
Declared on17 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI24200.0
Proposed, not sanctioned24,200 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANDHERI KURLA ROAD, ANDHERI EAST, MUMBAI - 400 059
Estimated costRs 137.34 cr
Cost incurredRs 91.46 cr
Work done66.6%
BuildingWingEstimatedIncurred
WHITE CITY PHASE 2 WING BNARs 129.15 crRs 90.26 cr
-NARs 8.19 crRs 1.21 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE AGE CONSULTANTS
ArchitectVILAS DESAI & ASSOCIATES
EngineerK C SHAH DESIGNS LLP
Chartered AccountantChirag Bharat Sarvaiya
Chartered AccountantM S K A & Associates
PartnerRole in project
RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800001848Jun 2019 → Jun 2020

Reason as filed by the promoterThe reason for delay are as follows: 1. Majority of our customers were seeking 98% Home Loan Finance. The loans were sanctioned and / or under process for sanction majorly by NBFC’s. Since September 2018 there has been a liquidity crunch at these NBFC’s hence they are not able to disburse funds which in turn affected our construction progress leading to a virtual halt in construction activities. Further to add to the woes: a) The institutions which were earlier funding upto 98% put a cap on funding of upto 90% on cost of house. This lead to delays in receipt of payments as customers had to mak

EXT51800008637Jun 2019 → Aug 2022

Reason as filed by the promoterWe Rajesh Real Estate Developers Private Limited the promoter / developer of the Project ‘Whitecity Phase 2 Wing B’, earlier registered vide registration no. P51800008324, under the provision of Real Estate (Development and Regulation) Act, 2016 (“Act”) (hereinafter referred to as the “Project”). The aforesaid registrations for the Project were valid from 18th August 2017 to 30th June 2019 and were then extended to 29th December 2020. The Project was envisaged to be completed by the aforesaid dates, however, due to massive disruptions at the industry level coupled with major regulatory and fin

Complaints filed with MahaRERA34

Case no.ComplainantRespondentFiled
CC006000000110775Gautam HarsheRajesh Real estate developers pvt ltd.11/11/2019
CC006000000110788Vineet Chhabra and Kanika ChhabraRajesh Real Estate Developers Private Limited15/09/2019
CC006000000197119Tarang GoyalRajesh Real Estate Developers Pvt. Ltd.02/07/2021
CC006000000194026Satish SharmaRajesh Real Estate Developers Private Limited29/09/2020
CC006000000194830Anand Shankar Nair and Bhavana Anand NairRajesh Real Estate Developers Private Limited06/11/2020
CC006000000195703Mr.Vasant Sachidanand Pandit and Mrs.Gayatri Vasant PanditRajesh Real Estate Developers Private Limited10/02/2021
CC006000000195724Mrs. Kavita Prabhakar and Mr. Prabhakar VaradarajanRajesh Real Estate Developers Private Limited16/02/2021
CC006000000195677AMIT KUMAR JHARAJESH REAL ESTATE DEVELOPERS PVT LTD22/05/2021
CC006000000195813PIYUSH K PATELRAJESH REAL ESTATE DEVELOPER PVT LTD01/02/2021
CC006000000195815KETAN DINKARRAY RAVALRAJESH REAL ESTATE DEVELOPER PVT LTD01/02/2021
CC006000000195898UMESH KISHANCHAND LALJANIRAJESH REAL ESTATE DEVELOPER PVT. LTD09/02/2021
CC006000000196282Ramanik PevekarRajesh Real Estate Developers Pvt Ltd08/03/2021
CC006000000197890Kamaljeet SinghVISHAL DOSHI05/08/2021
CC006000000197932Mina Chandrakant JoshiRajesh Real Estate Developers Private Limited08/08/2021
CC006000000220988Inder Singh PariharRajesh Real Estate Developers Private Limited06/05/2022
CC006000000221102Ketan Dinkarray RavalRajesh Real Estate Developer Pvt.Ltd09/05/2022
CC006000000221109sanjay Nainmal AgarwalRAJESH REAL ESTATE DEEVELOPERS PVT LTD07/05/2022
CC006000000221124Umesh Kishanchand LaljaniRajesh Real Estate Developer Pvt ltd09/05/2022
CC006000000221125Piyush p PatelRajesh Real Estate Developer PVt. Ltd09/05/2022
CC006000000251438SEEMA AGARWALRAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED14/06/2022
CC006000000251439BANARSILAL TIBREWALRAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED14/06/2022
CC006000000251440RAVI SINGHANIARAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED14/06/2022
CC006000000251441MEENADEVI SANGHAIRAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED14/06/2022
CC006000000251469TEJA SINGH BASSANRAJESH REAL ESTATE DEVELOPERS PVT LTD15/06/2022
CC006000000261965Prakash Kumar Rameshwar SanghaiRajesh Real Estate Developers Private Limited20/07/2022
CC006000000292515DILIPKUMAR MEHTARAJESH REAL ESTATE DEVELOPERS PVT LTD30/08/2022
CC006000000302977DAMYANTI PALTARAJESH REAL ESTATE DEVELOPERS PVT LTD10/10/2022
CC006000000303314DR MADHUKAR SHRI KRISHNA NILMANIMESSERS RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED13/11/2022
CC006000000375366jaise isaacPratik Patel ( Director)24/04/2023
CC006000000198653Bhajan Singh ChoudharyRajesh Real Estate Developers Private Limited12/10/2021
CC006000000396979RAJESH REAL ESTATE DEVELOPERS PVT. LTD. THROUGH AUTHORISED SIGNATORYKAMALJEET SINGH07/08/2023
CC006000000397046Tarang GoyalRajesh Real Estate Developers Pvt. Ltd.11/08/2023
CC006000000479768Balbir PrasadRAHEJA REAL ESTATE DEVELOPERS PVT LTD26/03/2024
CC12503264Girish NAROTTAMDAS VedRAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED13/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Dec 2022

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 RERA RREDPL 21-22 Wing B_Attested.pdf6 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KWC-Wing A B.pdf22 Dec 2022
Architect’s Certificate on Completion of Project (Form 4)File: Whitecity Phase 2 Wing B.pdf5 Dec 2022
CERSAI detailsFile: CERSAI-1.pdf12 Jan 2022
CERSAI detailsFile: CERSAI-2.pdf12 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5-Wing B FY1819.pdf8 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5-Wing B FY1920.pdf8 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RREDPL Form 5 Whitecity Wing B 31 03 2021.pdf8 Jan 2022
Declaration about Commencement CertificateFile: Declaration for CC WC2.pdf28 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 2019.pdf28 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 2020.pdf28 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 2021.pdf28 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: June 2021.pdf28 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sep 2021.pdf28 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 2021.pdf28 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: June 2021.pdf28 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sep 2021.pdf28 Dec 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold Booking.pdf28 Dec 2021
Layout approvalFile: IOD_compressed.pdf27 Dec 2021
Building plan approvalFile: IOD_compressed.pdf27 Dec 2021
Copy of Layout Approval (in case of layout)File: IOD_compressed.pdf27 Dec 2021
Building Plan Approval (IOD)File: IOD_compressed.pdf27 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White city Wing B Engineer Cft 30-07-2019.pdf24 Sep 2019
Certificates of CA (Form 3)File: WHITE CITY PHASE 2 WING B CA CERTIFICATE.pdf28 Jun 2019
Certificates of CA (Form 5)File: Annual Report on Statement of Accounts.pdf30 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Whitecity RERA Certificate B Wing ARC_Compressed.pdf13 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City Wing B 30_04_2019.pdf9 May 2019
Certificates of CA (Form 3)File: CA CERTIFICATE WHITECITY PHASE 2 - B WING 050219.pdf8 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City Wing B 05_02_2019.pdf20 Feb 2019
Certificates of CA (Form 3)File: White City B Wing Phase II 28Nov18.pdf13 Feb 2019
Certificates of CA (Form 3)File: WHITE CITY WING B PHASE 2 - 20082018.pdf2 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: White City PH2 151118 ARC.pdf17 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: White City PH2 B Wing 200818 ARC COMP.pdf17 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: White City B wing PH2 310518.pdf17 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City B wing.pdf4 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City B wing 20_08_18.pdf22 Nov 2018
Certificates of CA (Form 3)File: WHITE CITY B WING PHASE 2 31052018.pdf6 Nov 2018
Certificates of CA (Form 3)File: CA CERT WC PHASE 2.pdf20 Jul 2018
Details of encumbrancesFile: Encum pdf WC 29062018.pdf29 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Whitecity Wing B_Compressed.pdf13 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: White City Phase 2 Dec-17 Architect Com.pdf9 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City B wing 06_03_18.pdf9 Apr 2018
Certificates of CA (Form 3)File: Whitecity Phase B.pdf3 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City B wing 06_01_18.pdf7 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WhiteCity B.pdf15 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: White City B wing.pdf15 Nov 2017
Certificates of CA (Form 3)File: WHITECITY B.pdf15 Nov 2017
Declaration in FORM BFile: White City Phase II.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: WHITE CITY PHASE 2.pdf30 Jul 2017
Certificates of CA (Form 3)File: White City Phase 2.pdf30 Jul 2017
OtherFile: White City Additional Declaration.pdf30 Jul 2017
OtherFile: WHITE CITY FUTURE DEVELOPMENT PLAN.pdf30 Jul 2017
Layout approvalFile: 001.pdf29 Jul 2017
Building plan approvalFile: IOD COPY.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 001.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD COPY.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf29 Jul 2017
Proforma of Allotment letterFile: White City - AFS P2 pdf.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WING-B.pdf24 Jul 2017
Copy of the legal title reportFile: White City - Title Report.pdf20 Jul 2017
PAN CardFile: RREDPL PAN CARD.pdf18 Jul 2017
Details of encumbrancesFile: White City.pdf18 Jul 2017

How this compares with Mumbai Suburban

99%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 44 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WHITE CITY PHASE 2 WING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI6,700+ in Mumbai Suburban

2 kmWHITE CITY PHASE 2 WING Completed 135Lapsed / revoked 75Other 181Dot size: filed unitsN

Filed coordinates, straight-line distance. 391 registered projects within 2 km.

Builder: RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED

RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including WHITE CITY PHASE 2 WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if WHITE CITY PHASE 2 WING B is delayed beyond 28 Feb 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WHITE CITY PHASE 2 WING B?

The registered promoter entity is RAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U70102MH2006PTC166268 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WHITE CITY PHASE 2 WING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against WHITE CITY PHASE 2 WING B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for WHITE CITY PHASE 2 WING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WHITE CITY PHASE 2 WING B?

The professionals named in the filing: Architect: SPACE AGE CONSULTANTS; Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH DESIGNS LLP; Chartered Accountant: Chirag Bharat Sarvaiya; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WHITE CITY PHASE 2 WING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WHITE CITY PHASE 2 WING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WHITE CITY PHASE 2 WING B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.