ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / West View

Registered No litigation declared Others project

West View

By Gagan Habitats LLP

RG-MH-04872 · RERA P52100020936 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 3 extensions taken
  • Rs 150.00 crore secured on the land, in favour of ICICI Bank Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 60 months from the original
0 of 11Construction stages donefurthest along: Excavation, 92%
29 of 79Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 247 documents Report an error

West View is a Others project by Gagan Habitats LLP in Pune, Maharashtra, registered with MahaRERA as P52100020936 on 23 May 2019. Possession is promised by 31 Dec 2028. The completion date has moved by 60 months from the original filing. 50 of the 79 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameWest View
  • TypeOthers
  • Location
    • North Road
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • RERA no.P52100020936
  • ReraGenie IDRG-MH-04872

Builder

  • NameGagan Habitats LLP
  • Entity typePartnership
  • PartnerRahul Sureshchand Garg

Key dates

this monthRegisteredMay 2019First promiseDec 2023Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 May 2019
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed247 files

Current status

63%50 of 79 units booked
14.7%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower ANA231507979

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 92%.

Tower A: 24% average across the applicable activities

ActivityProgress
Excavation92%
Basement (if any)71%
Podiums (if any)0%
Plinth51%
Stilt Floor48%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1885

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,885
Closed/Covered397
Open Space1,488

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI Bank Ltd
Secured amountRs 150.00 crore
CERSAI search filedYes
Declared on23 Jun 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI39584.73
Proposed, not sanctioned39,559 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1194/8 Ramchandra Sabhamandap Ghole Road Shivaji Nagar Pune 411005
Estimated costRs 299.61 cr
Cost incurredRs 44.17 cr
Work done14.74%
BuildingWingEstimatedIncurred
Tower ANARs 269.65 crRs 44.17 cr
-NARs 29.96 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVoussoirs
EngineerSantosh Kolekar
Chartered AccountantA N J K & Co LLP
Chartered AccountantBIRLA & COMPANY
Chartered AccountantSameer Birla
PartnerRole in project
Gagan Habitats LLP-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011073Dec 2023 → Dec 2024

Reason as filed by the promoter1) We are the Promoters of the Real Estate Project known as “GAGAN ARBOR COURT” under implementation by us on land out of Survey No.81, Village Mundhwa within the Registration Sub-District of Taluka Haveli, District Pune. You were kind enough to grant Registration of the said Project vide your Registration Certificate No. P52100020936 dated 23/05/2019. 2) In anticipation that we would complete the said Project on or before 30/12/2023, in our Application to you for Registration of our Project, we had mentioned the date of Completion as 30/12/2023. However, due to the Second Wave (COVID19) Situa

EXT52100019085Dec 2023 → Dec 2027

Reason as filed by the promoterThe primary cause of the delay in the project is attributed to feasibility issues with the existing building structure. In order to address these challenges, it became crucial for the promoter to demolish the already constructed structure and opt for its reconstruction. This decision has unavoidably led to a substantial delay in the construction process.

EA09072621702Dec 2023 → Dec 2028

Reason as filed by the promoterThe construction progress of the project West View has been affected due to shortage of skilled labour force and irregular availability of essential raw materials, which resulted in delay in the execution of construction activities. Further, upon receipt of the latest sanctioned plans for the project, certain revisions and alignment in the ongoing construction work were required as per the approved plans, which also contributed to the delay in project completion.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed247

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 247 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf20 Jul 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf20 Jul 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf20 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A_March 2025.pdf9 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A_March 2026.pdf9 Jul 2026
Form 5 (FY 2024-2025)File: Gagan Habitat LLP - Annual report.pdf9 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A_March 2025.pdf3 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A_March 2026.pdf3 Jul 2026
Withdrawal Update Form 1File: Form 1 Architect certificate - March 2026-Scan.pdf16 May 2026
Withdrawal Update Form 2File: Form 2_Engineer Certificate Signed.pdf16 May 2026
Withdrawal Update Form 3File: Correction Form3-Signed.pdf16 May 2026
Form 5 (FY 2024-2025)File: Gagan Habitat LLP - Annual report.pdf16 May 2026
Layout approvalFile: Layout Approved.pdf17 Mar 2026
Building plan approvalFile: Plan 1.pdf17 Mar 2026
Building plan approvalFile: Plan 2.pdf17 Mar 2026
Building plan approvalFile: Plan 3.pdf17 Mar 2026
Building plan approvalFile: Plan 4.pdf17 Mar 2026
Building plan approvalFile: Plan 5.pdf17 Mar 2026
Building plan approvalFile: Plan 6.pdf17 Mar 2026
Building plan approvalFile: Plan 7.pdf17 Mar 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - Dec 2025.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate - Dec 2025.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate - Dec 2025_11zon.pdf7 Feb 2026
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE WEST VIEW June 2025.pdf27 Jan 2026
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE WEST VIEW Sep 2025.pdf27 Jan 2026
Withdrawal Update Form 2File: ENGINEERS CETIFICATE WEST VIEW June 2025.pdf27 Jan 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE WEST VIEW Sep 2025.pdf27 Jan 2026
Withdrawal Update Form 3File: CA Certificate Form3 June 25 Final.pdf27 Jan 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Sep 25.pdf27 Jan 2026
Form 1File: Form 1 Architect Certificate - March 2025.pdf4 Jul 2025
Form 2File: Form 2 Engineer Certificate - March 2025.pdf4 Jul 2025
Form 3File: CA Certificate March 2025 - Sign.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - March 2025.pdf4 Jul 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate - March 2025.pdf4 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate - March 2025.pdf4 Jul 2025
Withdrawal Update Form 3File: CA Certificate March 2025 - Sign_11zon.pdf4 Jul 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration Format A on Separate bank account.pdf12 Mar 2025
Layout approvalFile: Sheet No 01_compressed.pdf5 Mar 2025
Building plan approvalFile: Sheet No 02_compressed.pdf5 Mar 2025
Building plan approvalFile: Sheet No 03_compressed.pdf5 Mar 2025
Building plan approvalFile: Sheet No 04_compressed.pdf5 Mar 2025
Building plan approvalFile: Sheet No 05_compressed.pdf5 Mar 2025
Building plan approvalFile: Sheet No 06_compressed.pdf5 Mar 2025
Building plan approvalFile: Sheet No 07_compressed.pdf5 Mar 2025
Copy of Layout Approval (in case of layout)File: Sheet No 01_compressed.pdf5 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: white CC_compressed.pdf5 Mar 2025
Building Plan Approval (IOD)File: Sheet No 02_compressed.pdf5 Mar 2025
Building Plan Approval (IOD)File: Sheet No 03_compressed.pdf5 Mar 2025
Building Plan Approval (IOD)File: Sheet No 04_compressed.pdf5 Mar 2025
Building Plan Approval (IOD)File: Sheet No 05_compressed.pdf5 Mar 2025
Building Plan Approval (IOD)File: Sheet No 06_compressed.pdf5 Mar 2025
Building Plan Approval (IOD)File: Sheet No 07_compressed.pdf5 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certifiacte June 2024.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certifiacte Sept 2024.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certifiacte Dec 2024.pdf14 Feb 2025
Certificates of CA (Form 3)File: CA Certificate June 2024 - Signed.pdf14 Feb 2025
Certificates of CA (Form 3)File: CA Certificate Sep 2024 - signed.pdf14 Feb 2025
Certificates of CA (Form 3)File: CA Certificate Dec 2024 - Signed.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate June 2024.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Sept 2024.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 2024.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - June 2024.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2024.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Dec 2024.pdf14 Feb 2025
Declaration about Commencement CertificateFile: Declaration About CC.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf19 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf18 Jun 2024
Layout approvalFile: IOD Sanction.pdf14 Jun 2024
Layout approvalFile: HPSC1092.pdf14 Jun 2024
Copy of Layout Approval (in case of layout)File: IOD Sanction.pdf14 Jun 2024
Copy of Layout Approval (in case of layout)File: HPSC1092.pdf14 Jun 2024
Layout approvalFile: Uploaded Sanction Plan Highlighted.pdf3 Jun 2024
Copy of Layout Approval (in case of layout)File: Uploaded Sanction Plan Highlighted.pdf3 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Signed.pdf23 May 2024
Certificates of CA (Form 3)File: Form 3 Signed_compressed.pdf23 May 2024
Layout approvalFile: 1-6.pdf5 Apr 2024
Building plan approvalFile: 2-6.pdf5 Apr 2024
Building plan approvalFile: 3-6.pdf5 Apr 2024

How this compares with Pune

63%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 60 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep West View on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhawa13,700+ in Pune

Builder: Gagan Habitats LLP

Gagan Habitats LLP has 1 registration on MahaRERA, including West View. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if West View is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of West View?

The registered promoter entity is Gagan Habitats LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in West View?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for West View?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at West View?

The professionals named in the filing: Architect: Voussoirs; Engineer: Santosh Kolekar; Chartered Accountant: A N J K & Co LLP; Chartered Accountant: BIRLA & COMPANY; Chartered Accountant: Sameer Birla. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in West View?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About West View. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save West View to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.