Completed No litigation declared Commercial project

WATERS EDGE PHASE VI

By OM SAGAR DEVELOPERS

RG-MH-09440 · RERA P52100001427 · Last updated on MahaRERA portal: 24 Jun 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2023Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

WATERS EDGE PHASE VI is a Commercial project by OM SAGAR DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100001427 on 28 Jul 2017. The registration is recorded completed; possession was promised by 30 Sep 2023. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameWATERS EDGE PHASE VI
  • TypeCommercial
  • Location
    • D P ROAD
    • Pimple Nilakh
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001427
  • ReraGenie IDRG-MH-09440

Builder

  • NameOM SAGAR DEVELOPERS
  • Entity typeOthers
  • PartnerSAMIR K SAGAR
  • Named personsSHREE SAGAR ESTATES PVT LTD, SAMIR K SAGAR, VIPUL K SAGAR
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017First promiseSep 2022Revised toSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jul 2017
  • Promised completion30 Sep 2023
  • Revised completionRevised to 30 Sep 2023 (originally 30 Sep 2022)
  • Buildings1 building record
  • Documents filed121 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
G COMMERCIAL AND IT BUILDING - WATER SQUARENA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

G COMMERCIAL AND IT BUILDING - WATER SQUARE: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 24 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed415

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots415
Closed/Covered252
Open Space163

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,567 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7425.29
Proposed, not sanctioned7,127 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPLE NILAKH, PUNE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKalpak Bhandari
EngineerSrujan Construction Management Solutions
Chartered AccountantAtul P Ruparelia
Chartered AccountantVaubhav R Mayur
PartnerRole in project
OM SAGAR DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012564Sep 2022 → Sep 2023

Reason as filed by the promoterWe Om Sagar Developers, having our registered office at 3, Sai Niketan, Opp. Railway Station, Borivali (W), Mumbai 400092, are promoters and developers of a project “Water’s Edge” Phase VI - Building G (Commercial + IT) having MahaRERA registration no. P52100001427. The revised proposed date of completion is 30-09-2022. Due to the COVID-19 pandemic outburst and consequent lockdowns, there was a substantial delay due to the unavailability of man and material. As we resume due to a sudden surge in demand and lack of production there were issues of shortage of material and other supply chain mana

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Nov 2024

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B Declaration.pdf24 Jun 2025
Certificates of CA (Form 3)File: Form3_Q3.pdf17 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form-5 Building G-01 04 2023 to 30 10 2023 DSC.pdf17 Jun 2025
Other - LegalFile: Format-B Application for Extension of Project Completion.PDF25 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Building G 2023-24.pdf25 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - Building G F Y 2023-24 16-10-23.pdf21 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 G building -Signed 15-04-2023.pdf21 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 G building -Signed 15-04-2023.pdf21 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - Building G F Y 2023-24 16-10-23.pdf21 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECTS CERTIFICATE G BLDG.PDF19 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECTS CERTIFICATE G BLDG.PDF19 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Registration Certificate- Water's Square Commercial Premises CSL.PDF6 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate G Bldg oct 23.PDF6 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold Booked Inventory G building 31 Dec 2023.pdf1 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate - Q1 Year 2023-24.pdf21 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate - Q2 Year 2023-24.pdf21 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Building G Q1 FY 23-24 Engineer Certificate.pdf21 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Building G Q2 FY 23-24 Engineer Certificate.pdf21 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Building G FY 2023-24.pdf21 Oct 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate Q1 FY23-24 G Building-DSC.pdf21 Oct 2023
Certificates of CA (Form 3)File: Form 3 CA Certificate Q2 FY23-24 G Building-DSC.pdf21 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 Building G- DSC.pdf21 Oct 2023
Declaration in FORM BFile: FORM B RERA Declaration Building G.pdf6 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory G Bldg 30_09_23.pdf2 Oct 2023
Details of encumbrancesFile: OSD Encumbrance certificate ABFL.PDF7 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form- 1 Q4 22-23 Building G.pdf13 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Q-4 22-23 Building G.pdf13 Jul 2023
Certificates of CA (Form 3)File: Form 3 OSD building G.pdf13 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate G Building.pdf4 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Building G Signed March 2022.pdf14 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA Form-5 G Building March 22.pdf24 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q3 Year 22 23.pdf14 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q3 Year 22 23.pdf14 Feb 2023
Certificates of CA (Form 3)File: Form 3 Q3 year 22 23.pdf14 Feb 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf21 Jan 2023
Certificates of CA (Form 3)File: CA Certificate Q2 FY G Building 22-23.pdf27 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q2 Year 22-23.PDF22 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate- Form 1 Sep 22.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory sep22.pdf20 Oct 2022
Certificates of CA (Form 5)File: RERA Form 5 G Building March 22.pdf29 Sep 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked G Bldg 30062022.pdf20 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Q1.pdf19 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q1 FY 2022 23.pdf19 Jul 2022
Certificates of CA (Form 3)File: Form 3 Q1 FY 2022 23.pdf19 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Buildign G 31-03-2022.pdf8 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Buildign G 31-03-2022.pdf8 Apr 2022
Certificates of CA (Form 3)File: CA Certificate Q4 Building G.pdf8 Apr 2022
Proforma of Allotment letterFile: Agreement RERA Draft 31032022.pdf1 Apr 2022
Proforma of Allotment letterFile: Draft G Building Agreement RERA Feb-2022.pdf4 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Buildign G Form 2A 2020-21.pdf10 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Building G Form 5 2018-19.pdf10 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - 31-12-21.pdf31 Jan 2022
Declaration about Commencement CertificateFile: FORMAT-D - DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf11 Jan 2022
Certificates of CA (Form 3)File: Form 3 Building G for Qtr Dec-21.pdf11 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building G FORM 1 Architect Certificate.pdf7 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building G FORM 2 Engineers Certificate.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory bld G.pdf7 Jan 2022
CERSAI detailsFile: CERSAI certificate Building G.pdf7 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 G Building Apr-21 to Jun-21.pdf14 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 G Building Jan to Mar-21.pdf14 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 G Building Jul-21 to Sept-21.pdf14 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 for G Bldg 31-03-2021.pdf14 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 for G Bldg 30-06-2021.pdf14 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 for G Bldg 30-09-2021.pdf14 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked Inventory- G Bldg 30-09-2021.PDF14 Oct 2021
Certificates of CA (Form 3)File: Form 3 G Buliding June-21.pdf14 Oct 2021
Certificates of CA (Form 3)File: Form 3 G Buliding Sep-21.pdf14 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RERA Form-5 - G Building 31032021.pdf1 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked Inventory Building G.pdf27 Sep 2021
Certificates of CA (Form 3)File: Form-3 Building G RERA.pdf15 Sep 2021
Details of encumbrancesFile: Encumbrance certificate building G.pdf17 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Form-5 - G Building.pdf7 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rera Agreement draft G Building-01-10-2020.pdf2 Oct 2020
Certificates of CA (Form 5)File: Form 5 building g.pdf30 Sep 2019
Details of encumbrancesFile: encumbrances G.pdf10 Dec 2018
Certificates of CA (Form 5)File: OSD-F Vibe Wing Phase V form-5 March 18.pdf29 Sep 2018
Certificates of CA (Form 5)File: OSD-Form 5 Phase VI form-march 2018 Uploded.pdf29 Sep 2018
Proforma of Allotment letterFile: G- Draft Agreement.pdf17 Jan 2018
Details of encumbrancesFile: Encumbrance certificate.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf25 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Waters Edge Phase IIIS NO -18-1-1 PIMPLE NILAKH PUNE-2747CompletedMar 2014Late, Jun 2014

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WATERS EDGE PHASE VI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimple Nilakh13,700+ in Pune

2 kmWATERS EDGE PHASE VICompleted 97Lapsed / revoked 39Other 102Dot size: filed unitsN

Filed coordinates, straight-line distance. 238 registered projects within 2 km.

Builder: OM SAGAR DEVELOPERS

OM SAGAR DEVELOPERS has 3 registrations on MahaRERA, including WATERS EDGE PHASE IV and WATERS EDGE PHASE V. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if WATERS EDGE PHASE VI is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WATERS EDGE PHASE VI?

The registered promoter entity is OM SAGAR DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WATERS EDGE PHASE VI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WATERS EDGE PHASE VI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WATERS EDGE PHASE VI?

The professionals named in the filing: Architect: Kalpak Bhandari; Engineer: Srujan Construction Management Solutions; Chartered Accountant: Atul P Ruparelia; Chartered Accountant: Vaubhav R Mayur. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WATERS EDGE PHASE VI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WATERS EDGE PHASE VI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WATERS EDGE PHASE VI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.