Home / Browse projects / Pune, Maharashtra / Sai Aura
Sai Aura
RG-MH-97590 · RERA P52100051930 · Last updated on MahaRERA portal: 25 Jul 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sai Aura is a Others project by WJV LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as P52100051930 on 13 Jul 2023. The registration is recorded completed; possession was promised by 30 Sep 2026. The completion date has moved by 6 months from the original filing. 163 of the 204 units on this registration are recorded sold or booked, and 72 of 88 construction stages are filed complete.
At a glance
Project
- NameSai Aura
- TypeOthers
- Location
- Near Kunal Icon Road
- Pimple Saudagar
- Pimpale Saudagar
- Haveli
- Pune
- 411027
- Pincode411027
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051930
- ReraGenie IDRG-MH-97590
Builder
- NameWJV LANDMARKS LLP
- Entity typePartnership
- PartnersSuraj Girish Jeswani, Sahil Rajesh Vaswani, Sanjay Laxman Vaswani
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on13 Jul 2023
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 31 Mar 2026)
- Buildings8 building records
- Documents filed221 files
Current status
Figures as on 25 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 9 | 8 | 26 | 2 | 28 |
| B Wing | NA | 9 | 7 | 26 | 0 | 26 |
| C Wing | NA | 9 | 7 | 26 | 0 | 26 |
| F Wing | NA | 9 | 7 | 26 | 0 | 26 |
| D Wing | NA | 9 | 7 | 26 | 0 | 26 |
| E Wing | NA | 9 | 7 | 26 | 0 | 26 |
| G Wing | NA | 9 | 7 | 26 | 0 | 26 |
| H Wing | NA | 9 | 7 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building8
As on 25 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
72 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 0%.
A Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
F Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
G Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
H Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed423
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A Wing | 47 | 1 | 48 |
| B Wing | 55 | 1 | 56 |
| C Wing | 55 | 1 | 56 |
| F Wing | 79 | 1 | 80 |
| D Wing | 54 | 1 | 55 |
| E Wing | 41 | 0 | 41 |
| G Wing | 68 | 1 | 69 |
| H Wing | 18 | 0 | 18 |
Land and ownership18
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Vinayak Associates | Pimple Nilakh | Pune |
| Kate Tanaji Bhagawnt | Pimpale Saudagar | Pune |
| Shivaji Bhagwant kate | Pimpale Saudagar | Pune |
| Swati Shivaji Kate | Pimpale Saudagar | Pune |
| Pradnya Shivaji Kate | Pimpale Saudagar | Pune |
| Harshwardhan Shivaji Kate | Pimpale Saudagar | Pune |
| Tanaji Bhagwant Kate | Pimpale Saudagar | Pune |
| Kavita Tanaji Kate | Pimpale Saudagar | Pune |
| Akansha Tanaji Kate | Pimpale Saudagar | Pune |
| Aarya Tanaji Kate | Pimpale Saudagar | Pune |
| Aadiraj Tanaji Kate | Pimpale Saudagar | Pune |
| Sambhaji Bhagwant Kate | Pimpale Saudagar | Pune |
| Rohini Sambhaji Kate | Pimpale Saudagar | Pune |
| Sarthak Sambhaji Kate | Pimpale Saudagar | Pune |
| Naresh Thakurdas Wadhwani | Baner | Pune |
| M/s Ajay Developers | Baner | Pune |
| Sanjay Vaswani | Pimpri | Pune |
| Kavita Ramchandra Vaswani | Pimpri | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| F Wing | NA | Rs 10.90 cr | Rs 10.90 cr |
| G Wing | NA | Rs 10.90 cr | Rs 10.90 cr |
| A Wing | NA | Rs 8.60 cr | Rs 8.60 cr |
| B Wing | NA | Rs 8.60 cr | Rs 8.60 cr |
| C Wing | NA | Rs 8.60 cr | Rs 8.60 cr |
| D Wing | NA | Rs 8.60 cr | Rs 8.60 cr |
| E Wing | NA | Rs 8.60 cr | Rs 8.60 cr |
| H Wing | NA | Rs 8.60 cr | Rs 7.60 cr |
| - | NA | Rs 7.34 cr | Rs 7.00 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | THE ZINE STUDIO |
| Engineer | Pravin Nigade |
| Chartered Accountant | V S A P & Company |
| Chartered Accountant | V. L. JAIN & CO |
| Partner | Role in project |
|---|---|
| WJV LANDMARKS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject is complete in all respect within timelines and OC is obtained for 203 units of total 204 units. Architect certificate for 100% completion along with NOCs from Water, Fire, Drainage, Lift, Garden are also obtained for entire project and submitted with this application. The completion MOJANI of land is pending due to technical issue in the Bhumi Abhilekh online processing website. The delay is beyond the control of the promoter and is solely attributable to the pending process with the Bhumi Abhilekh department. Application with Bhumi Abhilekh was made on 27th Jan 2026 which is still pe
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed221
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 221 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 For FY 2026-27 Q1 Final.pdf | 25 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 For FY 2026-27 Q1.pdf | 25 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 for FY 2026-27 Q1.pdf | 25 Jul 2026 |
| Occupational CertificateFile: Occupancy Certificate.pdf | 25 Jun 2026 |
| Layout approvalFile: 01 Plan Layout.pdf | 5 May 2026 |
| Building plan approvalFile: 02 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 03 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 04 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 05 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 06 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 07 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 08 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 09 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 10 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 11 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 12 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 13 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 14 Plan.pdf | 5 May 2026 |
| Building plan approvalFile: 15 Plan.pdf | 5 May 2026 |
| Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q4- Sai Aura final.pdf | 13 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q4 Sai Aura Final.pdf | 13 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 for FY 205-26 Q4- Sai Aura.pdf | 13 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A for FY 2025-26- Sai Aura final.pdf | 13 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A for FY 2024-25 sai aura final.pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: Form1 FY 2025-26 Q2 Sai Aura.pdf | 14 Mar 2026 |
| Withdrawal Update Form 2File: 2 ENGINEER CERTIFICATE - SAI AURA Q2 FY 2025-26.pdf | 14 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Sai Aura FY 2025-26 Q2.pdf | 14 Mar 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE WJV LANDMARKS LLP FY 2025-26 Q1 _compressed.pdf | 13 Mar 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE - Q1 FY 2025-26.pdf | 13 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 For FY 2025-26 Q1 Sai Aura.pdf | 13 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q3- Sai Aura.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q3- Sai Aura.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3- Sai Aura.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3- Sai Aura.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q3- Sai Aura.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q3- Sai Aura.pdf | 24 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 for FY 2024-25 Sai Aura final.pdf | 9 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-24-25Q4.pdf | 7 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 WJV 2024-25 Q4.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2ENGINEERCERTIFICATESAIAURAQ4.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE Q4.pdf | 7 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER CERTIFICATE 2A- SAI AURA Q4.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Sai Aura Q3.pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sai Aura Q3 (1).pdf | 1 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Promoter Disclosure Sai Aura Q3.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sai Aura Q3 (1).pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Sai Aura Q3.pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sai Aura Q3 (1).pdf | 1 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Promoter Disclosure Sai Aura Q3.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sai Aura Q3 (1).pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sai Aura Q3 (1).pdf | 1 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sai Aura Q3 (1).pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Sai Aura Q3.pdf | 1 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Promoter Disclosure Sai Aura Q3.pdf | 1 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form 5 - Sai Aura.pdf | 9 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form 5 - Sai Aura.pdf | 9 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form 5 - Sai Aura.pdf | 9 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024-25 Q-2 Sai Aura.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024-25 Q-2 Sai Aura.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024-25 Q-2 Sai Aura.pdf | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 FY 25-25 Q-2 Sai Aura.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 FY 24-25 Q-2 Sai Aura.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE - SAI AURA Q2.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 FY 25-25 Q-2 Sai Aura.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 FY 24-25 Q-2 Sai Aura.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE - SAI AURA Q2.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 FY 25-25 Q-2 Sai Aura.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 FY 24-25 Q-2 Sai Aura.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE - SAI AURA Q2.pdf | 28 Oct 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE WJV .pdf | 26 Oct 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE WJV .pdf | 26 Oct 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE WJV .pdf | 26 Oct 2024 |
| Building plan approvalFile: Building Plan- 2.pdf | 7 Oct 2024 |
| Building plan approvalFile: Building Plan- 3.pdf | 7 Oct 2024 |
| Building plan approvalFile: Building Plan-4.pdf | 7 Oct 2024 |
| Building plan approvalFile: Building Plan-5.pdf | 7 Oct 2024 |
| Building plan approvalFile: Building Plan-6.pdf | 7 Oct 2024 |
| Building plan approvalFile: Building Plan-7.pdf | 7 Oct 2024 |
| Layout approvalFile: Layout.pdf | 7 Oct 2024 |
| Building plan approvalFile: Building Plan -1.pdf | 7 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 221 filed documents as one ZIP, foldered, with a manifest
Keep Sai Aura on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pimple Saudagar13,700+ in Pune
Filed coordinates, straight-line distance. 162 registered projects within 2 km.
VANTAGE TWENTY ONE
VIVANTA REALTY
SHAKTI GARDENS
Grandwell Properties and Leasing Private L
24K OPULA
KOLTE-PATIL DEVELOPERS LIMITED
Sukhwani Minerva
Sukhwani Ramchandani LLP
MIDORI TOWER PHASE 4
VIKRAM DEVELOPERS AND PROMOTERS
VISION 7 - PHASE I
SHREE VISION
Builder: WJV LANDMARKS LLP
WJV LANDMARKS LLP has 1 registration on MahaRERA, including Sai Aura. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Sai Aura is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sai Aura?
The registered promoter entity is WJV LANDMARKS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sai Aura?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sai Aura?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sai Aura?
The professionals named in the filing: Architect: THE ZINE STUDIO; Engineer: Pravin Nigade; Chartered Accountant: V S A P & Company; Chartered Accountant: V. L. JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sai Aura?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback