Home / Browse projects / Pune, Maharashtra / Sai Aura

Completed No litigation declared Others project

Sai Aura

By WJV LANDMARKS LLP

RG-MH-97590 · RERA P52100051930 · Last updated on MahaRERA portal: 25 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2026Possession promisedregistration recorded completed
72 of 88Construction stages doneacross 8 buildings; furthest along: Podiums (if any), 0%
41 of 204Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 221 documents Report an error

Sai Aura is a Others project by WJV LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as P52100051930 on 13 Jul 2023. The registration is recorded completed; possession was promised by 30 Sep 2026. The completion date has moved by 6 months from the original filing. 163 of the 204 units on this registration are recorded sold or booked, and 72 of 88 construction stages are filed complete.

At a glance

Project

  • NameSai Aura
  • TypeOthers
  • Location
    • Near Kunal Icon Road
    • Pimple Saudagar
    • Pimpale Saudagar
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051930
  • ReraGenie IDRG-MH-97590

Builder

  • NameWJV LANDMARKS LLP
  • Entity typePartnership
  • PartnersSuraj Girish Jeswani, Sahil Rajesh Vaswani, Sanjay Laxman Vaswani

Key dates

this monthRegisteredJul 2023First promiseMar 2026Revised toSep 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Jul 2023
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Mar 2026)
  • Buildings8 building records
  • Documents filed221 files

Current status

80%163 of 204 units booked
98.3%Work done, per cost certificate

Figures as on 25 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA9826228
B WingNA9726026
C WingNA9726026
F WingNA9726026
D WingNA9726026
E WingNA9726026
G WingNA9726026
H WingNA9720020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 25 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

72 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 0%.

A Wing82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Wing82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Wing82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F Wing82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D Wing82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E Wing82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
G Wing82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H Wing82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed423

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots423
Closed/Covered417
Open Space6
BuildingClosed/CoveredOpen SpaceTotal
A Wing47148
B Wing55156
C Wing55156
F Wing79180
D Wing54155
E Wing41041
G Wing68169
H Wing18018

Land and ownership18

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,200 sq m
Land owned byNot the promoter
Named landowners18
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Feb 2026
LandownerVillageDistrict
Vinayak AssociatesPimple NilakhPune
Kate Tanaji BhagawntPimpale SaudagarPune
Shivaji Bhagwant katePimpale SaudagarPune
Swati Shivaji KatePimpale SaudagarPune
Pradnya Shivaji KatePimpale SaudagarPune
Harshwardhan Shivaji KatePimpale SaudagarPune
Tanaji Bhagwant KatePimpale SaudagarPune
Kavita Tanaji KatePimpale SaudagarPune
Akansha Tanaji KatePimpale SaudagarPune
Aarya Tanaji KatePimpale SaudagarPune
Aadiraj Tanaji KatePimpale SaudagarPune
Sambhaji Bhagwant KatePimpale SaudagarPune
Rohini Sambhaji KatePimpale SaudagarPune
Sarthak Sambhaji KatePimpale SaudagarPune
Naresh Thakurdas WadhwaniBanerPune
M/s Ajay DevelopersBanerPune
Sanjay VaswaniPimpriPune
Kavita Ramchandra VaswaniPimpriPune

Approvals and building plan

Sanctioning authoritypimpri chinchwad municipal corporation
Permissible FSI20815.98
Proposed, not sanctioned20,816 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 12, ICICI Bank Ltd, Sai Crystal, D P Road, Vishal Nagar, Pimple Nilakh, Pune-411027
Estimated costRs 80.74 cr
Cost incurredRs 79.40 cr
Work done98.34%
BuildingWingEstimatedIncurred
F WingNARs 10.90 crRs 10.90 cr
G WingNARs 10.90 crRs 10.90 cr
A WingNARs 8.60 crRs 8.60 cr
B WingNARs 8.60 crRs 8.60 cr
C WingNARs 8.60 crRs 8.60 cr
D WingNARs 8.60 crRs 8.60 cr
E WingNARs 8.60 crRs 8.60 cr
H WingNARs 8.60 crRs 7.60 cr
-NARs 7.34 crRs 7.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE ZINE STUDIO
EngineerPravin Nigade
Chartered AccountantV S A P & Company
Chartered AccountantV. L. JAIN & CO
PartnerRole in project
WJV LANDMARKS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18032620269Mar 2026 → Sep 2026

Reason as filed by the promoterProject is complete in all respect within timelines and OC is obtained for 203 units of total 204 units. Architect certificate for 100% completion along with NOCs from Water, Fire, Drainage, Lift, Garden are also obtained for entire project and submitted with this application. The completion MOJANI of land is pending due to technical issue in the Bhumi Abhilekh online processing website. The delay is beyond the control of the promoter and is solely attributable to the pending process with the Bhumi Abhilekh department. Application with Bhumi Abhilekh was made on 27th Jan 2026 which is still pe

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed221

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 221 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 For FY 2026-27 Q1 Final.pdf25 Jul 2026
Withdrawal Update Form 2File: Form 2 For FY 2026-27 Q1.pdf25 Jul 2026
Withdrawal Update Form 3File: Form 3 for FY 2026-27 Q1.pdf25 Jul 2026
Occupational CertificateFile: Occupancy Certificate.pdf25 Jun 2026
Layout approvalFile: 01 Plan Layout.pdf5 May 2026
Building plan approvalFile: 02 Plan.pdf5 May 2026
Building plan approvalFile: 03 Plan.pdf5 May 2026
Building plan approvalFile: 04 Plan.pdf5 May 2026
Building plan approvalFile: 05 Plan.pdf5 May 2026
Building plan approvalFile: 06 Plan.pdf5 May 2026
Building plan approvalFile: 07 Plan.pdf5 May 2026
Building plan approvalFile: 08 Plan.pdf5 May 2026
Building plan approvalFile: 09 Plan.pdf5 May 2026
Building plan approvalFile: 10 Plan.pdf5 May 2026
Building plan approvalFile: 11 Plan.pdf5 May 2026
Building plan approvalFile: 12 Plan.pdf5 May 2026
Building plan approvalFile: 13 Plan.pdf5 May 2026
Building plan approvalFile: 14 Plan.pdf5 May 2026
Building plan approvalFile: 15 Plan.pdf5 May 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q4- Sai Aura final.pdf13 Apr 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q4 Sai Aura Final.pdf13 Apr 2026
Withdrawal Update Form 3File: Form 3 for FY 205-26 Q4- Sai Aura.pdf13 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A for FY 2025-26- Sai Aura final.pdf13 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A for FY 2024-25 sai aura final.pdf23 Mar 2026
Withdrawal Update Form 1File: Form1 FY 2025-26 Q2 Sai Aura.pdf14 Mar 2026
Withdrawal Update Form 2File: 2 ENGINEER CERTIFICATE - SAI AURA Q2 FY 2025-26.pdf14 Mar 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Sai Aura FY 2025-26 Q2.pdf14 Mar 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE WJV LANDMARKS LLP FY 2025-26 Q1 _compressed.pdf13 Mar 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE - Q1 FY 2025-26.pdf13 Mar 2026
Withdrawal Update Form 3File: Form 3 For FY 2025-26 Q1 Sai Aura.pdf13 Mar 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q3- Sai Aura.pdf24 Feb 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q3- Sai Aura.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3- Sai Aura.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3- Sai Aura.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q3- Sai Aura.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q3- Sai Aura.pdf24 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 for FY 2024-25 Sai Aura final.pdf9 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-24-25Q4.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 WJV 2024-25 Q4.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2ENGINEERCERTIFICATESAIAURAQ4.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE Q4.pdf7 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER CERTIFICATE 2A- SAI AURA Q4.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Sai Aura Q3.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sai Aura Q3 (1).pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Sai Aura Q3.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sai Aura Q3 (1).pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Sai Aura Q3.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sai Aura Q3 (1).pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Sai Aura Q3.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sai Aura Q3 (1).pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sai Aura Q3 (1).pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sai Aura Q3 (1).pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Sai Aura Q3.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Sai Aura Q3.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form 5 - Sai Aura.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form 5 - Sai Aura.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Form 5 - Sai Aura.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024-25 Q-2 Sai Aura.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024-25 Q-2 Sai Aura.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024-25 Q-2 Sai Aura.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 FY 25-25 Q-2 Sai Aura.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 FY 24-25 Q-2 Sai Aura.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE - SAI AURA Q2.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 FY 25-25 Q-2 Sai Aura.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 FY 24-25 Q-2 Sai Aura.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE - SAI AURA Q2.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 FY 25-25 Q-2 Sai Aura.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 FY 24-25 Q-2 Sai Aura.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE - SAI AURA Q2.pdf28 Oct 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE WJV .pdf26 Oct 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE WJV .pdf26 Oct 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE WJV .pdf26 Oct 2024
Building plan approvalFile: Building Plan- 2.pdf7 Oct 2024
Building plan approvalFile: Building Plan- 3.pdf7 Oct 2024
Building plan approvalFile: Building Plan-4.pdf7 Oct 2024
Building plan approvalFile: Building Plan-5.pdf7 Oct 2024
Building plan approvalFile: Building Plan-6.pdf7 Oct 2024
Building plan approvalFile: Building Plan-7.pdf7 Oct 2024
Layout approvalFile: Layout.pdf7 Oct 2024
Building plan approvalFile: Building Plan -1.pdf7 Oct 2024

How this compares with Pune

80%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Aura on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimple Saudagar13,700+ in Pune

2 kmSai AuraCompleted 59Lapsed / revoked 36Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 162 registered projects within 2 km.

Builder: WJV LANDMARKS LLP

WJV LANDMARKS LLP has 1 registration on MahaRERA, including Sai Aura. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sai Aura is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Aura?

The registered promoter entity is WJV LANDMARKS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Aura?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Aura?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Aura?

The professionals named in the filing: Architect: THE ZINE STUDIO; Engineer: Pravin Nigade; Chartered Accountant: V S A P & Company; Chartered Accountant: V. L. JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Aura?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Aura. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Aura to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.