Home / Browse projects / Pune, Maharashtra / SHAKTI GARDENS

Registration lapsed No litigation declared Residential / Group Housing project

SHAKTI GARDENS

By Grandwell Properties and Leasing Private Limited

RG-MH-22646 · RERA P52100032997 · Last updated on MahaRERA portal: 20 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
1 of 11Construction stages donefurthest along: Slabs of Super Structure, 82%
304 of 304Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

SHAKTI GARDENS is a Residential / Group Housing project by Grandwell Properties and Leasing Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100032997 on 3 Feb 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 0 of the 304 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHAKTI GARDENS
  • TypeResidential / Group Housing
  • Location
    • Wagholi
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • RERA no.P52100032997
  • ReraGenie IDRG-MH-22646

Builder

  • NameGrandwell Properties and Leasing Private Limited
  • Entity typeOthers
  • Named personsGrandwell Propeties and Leasing Private Limited, Grandwell Properties Private Limited
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredFeb 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Feb 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

0%0 of 304 units booked
81.2%Work done, per cost certificate

Figures as on 20 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EWSNA21173040304

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 82%.

EWS: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor70%
Slabs of Super Structure82%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises24%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%

Progress on shared amenities15

As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,440 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jul 2025

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI16659.32
Proposed, not sanctioned16,659 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBoat Club Road
Estimated costRs 45.89 cr
Cost incurredRs 37.26 cr
Work done81.19%
BuildingWingEstimatedIncurred
EWSNARs 41.30 crRs 33.53 cr
-NARs 4.59 crRs 3.73 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrajakta Pujari
ArchitectDipesh Bhurat
EngineerSantosh Tiwatne
EngineerAshish Rajigare
Chartered AccountantDeepak K Shah
Chartered AccountantJain Doshi and Associates
Chartered AccountantShah Khandelwal Jain and Associates
PartnerRole in project
Gera Developments Private Limited-

Litigation declared1

CaseCourtStatus
1282/2022CivilOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: POJ_RERA CERTIFICATE_SHAKTI GARDENS.pdf20 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate-Shakti Gardens.pdf20 Jan 2026
Withdrawal Update Form 3File: CA Certificate- Shakti Gardens 31122025_11zon.pdf20 Jan 2026
Withdrawal Update Form 1File: SHAKTI GARDENS_RERA_CERTIFICATE_RERA-73.pdf29 Dec 2025
Withdrawal Update Form 2File: Engineers Certificate Shakti Gardens.pdf29 Dec 2025
Withdrawal Update Form 3File: shakti gardens_11zon (1).pdf29 Dec 2025
Form 5 (FY 2024-2025)File: Shakti Gardens FY24-25.pdf22 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shakti gardesn.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shakti Gardens.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Shakti Gardens 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Shakti Gardens.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: POJ SG.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gera Shakti Gardners 30092024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Shakti Gardens 30092024.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Shakti Gardens.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: Shakti G.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shakti G.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 343 crest 30062024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Shakti Gardens 30062024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shakti G.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Shakti Gardens_11zon.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shakti Gardens.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shakti Gardens.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Shakti Gardens.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shakti Gardens.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shakti Gardens.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: POJ Shakti Gardens Engineer Certificate 31122023.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: DIsc of Sold Unsold Shakti Gardens.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shakti Gardens 31122023-compressed.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: SHAKTI GARDENS Q2.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 Notes_Shakti Garden.pdf11 Sep 2023
Disclosure of sold/ booked inventoryFile: Disc Sold Unsold shakti g.pdf21 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Shrishti Gardens.pdf30 Jun 2023
Disclosure of sold/ booked inventoryFile: Shakti Garden.pdf27 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GetUserDocumentFileContent (1).pdf23 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 Notes_POJ-Shakti Garden_Signed.pdf17 Oct 2022
Other - FinanceFile: FORM 5 Notes_POJ-Shakti Garden_Signed.pdf27 Sep 2022
Building plan approvalFile: 42-47 EWS Basement Floor Plan Parking .pdf7 Jul 2022
Building plan approvalFile: 43-47 EWS Lower Ground Floor Plan Parking .pdf7 Jul 2022
Building plan approvalFile: 44-47 EWS Upper Ground Floor Plan Parking .pdf7 Jul 2022
Building plan approvalFile: 45-47 EWS Floor Plans Area Calculations.pdf7 Jul 2022
Building plan approvalFile: 46-47 EWS Floor Plans Area Calculations.pdf7 Jul 2022
Building plan approvalFile: 47-47 EWS Floor Plans Area Calculations .pdf7 Jul 2022
Layout approvalFile: 1-POJ-Layout.pdf7 Jul 2022
Copy of Layout Approval (in case of layout)File: 1-POJ-Layout.pdf7 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 42-47 EWS Basement Floor Plan Parking .pdf7 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 43-47 EWS Lower Ground Floor Plan Parking .pdf7 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 44-47 EWS Upper Ground Floor Plan Parking .pdf7 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 45-47 EWS Floor Plans Area Calculations.pdf7 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 46-47 EWS Floor Plans Area Calculations.pdf7 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 47-47 EWS Floor Plans Area Calculations .pdf7 Jul 2022
Declaration about Commencement CertificateFile: CC Dec-Shakti Gardens.pdf7 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QC- Shakti_merged.pdf15 Apr 2022
Disclosure of sold/ booked inventoryFile: Inv-Shakti.pdf7 Apr 2022
CERSAI detailsFile: CERSAI Report (Asset Based)- POJ.pdf23 Mar 2022
CERSAI detailsFile: CERSAI Declaration - POJ (Asset Based).pdf23 Mar 2022
Disclosure of sold/ booked inventoryFile: Shakti- Inventory Disclosure.pdf16 Mar 2022
CERSAI detailsFile: CERSAI Declaration - POJ.pdf31 Jan 2022
Proforma of Allotment letterFile: Model Agreement.pdf17 Jan 2022
Declaration about Commencement CertificateFile: IMG20220111171235.pdf11 Jan 2022
Declaration in FORM BFile: Form B.pdf11 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_Grandwell Properties and Leasing Private Limited.pdf11 Jan 2022
Proforma of Allotment letterFile: LOI.pdf11 Jan 2022
Copy of the legal title reportFile: Rera legal title report.pdf10 Jan 2022
Details of encumbrancesFile: Self Declaration Encumbrance Letter_POJ.pdf10 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect-SHRISHTI-I.pdf10 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Shrishti I_compressed.pdf10 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Grandwell Shrushti 271221_compressed (1).pdf10 Jan 2022
Layout approvalFile: Layout.pdf1 Nov 2021
Building plan approvalFile: EWS.pdf1 Nov 2021
Building plan approvalFile: EWS Sec.pdf1 Nov 2021
Building plan approvalFile: EWS Plan.pdf1 Nov 2021
Building plan approvalFile: EWS parking.pdf1 Nov 2021
Building plan approvalFile: EWS Par.pdf1 Nov 2021
Building plan approvalFile: EWS floor.pdf1 Nov 2021
PAN CardFile: GRANDWELL PROPERTIES LEASING PRIVATE LIMITED PAN CARD.pdf1 Nov 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: EWS.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: EWS Sec.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: EWS Plan.pdf1 Nov 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Geras Park ViewSurvey No 73 Hissa No 1 Kharadi Pune 411 014227CompletedApr 2014Late, Dec 2017

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAKTI GARDENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

Builder: Grandwell Properties and Leasing Private Limited

Grandwell Properties and Leasing Private Limited has 1 registration on MahaRERA, including SHAKTI GARDENS. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SHAKTI GARDENS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHAKTI GARDENS is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAKTI GARDENS?

The registered promoter entity is Grandwell Properties and Leasing Private Limited, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAKTI GARDENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAKTI GARDENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAKTI GARDENS?

The professionals named in the filing: Architect: Prajakta Pujari; Architect: Dipesh Bhurat; Engineer: Santosh Tiwatne; Engineer: Ashish Rajigare; Chartered Accountant: Deepak K Shah; Chartered Accountant: Jain Doshi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAKTI GARDENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAKTI GARDENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAKTI GARDENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.