Home / Browse projects / Pune, Maharashtra / VTP ALTAIR

Registration lapsed Litigation declared Residential / Group Housing project

VTP ALTAIR

By Integrated Business Ecosystem Private Limited

RG-MH-22177 · RERA P52100030521 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Litigation declared, 1 case
  • 29 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 270.00 crore secured on the land, in favour of Piramal Finance Limited

Clear

  • Separate project account declared
  • Allotment letter follows the model form

7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
24 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
8 of 495Units unsoldnot recorded sold or booked
29Complaints at MahaRERAon this registration
Jump to the 150 documents Report an error

VTP ALTAIR is a Residential / Group Housing project by Integrated Business Ecosystem Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100030521 on 30 Aug 2021. Possession was promised by 29 Jun 2026 and is now 4 months past that date. The completion date has moved by 12 months from the original filing. 487 of the 495 units on this registration are recorded sold or booked, and 24 of 33 construction stages are filed complete. 29 complaints are on record with the regulator.

At a glance

Project

  • NameVTP ALTAIR
  • TypeResidential / Group Housing
  • Location
    • 24 m DP ROAD
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030521
  • ReraGenie IDRG-MH-22177

Builder

  • NameIntegrated Business Ecosystem Private Limited
  • Entity typeCompany
  • DirectorsNilesh Vilaskumar Palresha, Atul Ashok Chordia
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredAug 2021First promiseJun 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on30 Aug 2021
  • Promised completion29 Jun 2026
  • Revised completionRevised to 29 Jun 2026 (originally 30 Jun 2025)
  • Buildings3 building records
  • Documents filed150 files

Current status

98%487 of 495 units booked
89.0%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1NA35301750175
Tower 2NA35301150115
Tower 3NA35302050205

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

Tower 197%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 296%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises87%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 389%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises76%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes75%
Street LightingYes50%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes75%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered3
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
Tower 1134
Tower 2112
Tower 3101

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area11,855 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofPiramal Finance Limited
Secured amountRs 270.00 crore
Declared on22 Aug 2025

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION AUTHORITY PUNE
Permissible FSI55081.55
Proposed, not sanctioned52,082 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDhanori Pune
Estimated costRs 296.19 cr
Cost incurredRs 263.68 cr
Work done89.03%
BuildingWingEstimatedIncurred
Tower 3NARs 101.66 crRs 90.18 cr
Tower 1NARs 87.38 crRs 77.51 cr
Tower 2NARs 81.34 crRs 72.15 cr
-NARs 25.81 crRs 23.84 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANA Consortium Pvt Ltd
ArchitectVK design & projects Pvt. Ltd.
ArchitectVK ARCH
EngineerGirish Awinashe
EngineerStrudcom Consultants Private Limited
Engineerhimmat lad
Chartered AccountantPriyanka Chordiya & Associates
Chartered AccountantSPAK & Co
Chartered AccountantSAC & CO LLP
PartnerRole in project
Integrated Business Ecosystem Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13062501581Jun 2025 → Jun 2026

Reason as filed by the promoterThe project is an Integrated Township, was registered under MahaRERA on 30/08/2021. However, certain critical and uncontrollable delays have impacted our execution timeline. We respectfully submit the following reasons for your kind consideration: • Delayed Environmental Clearance (EC): Application for revised EC was submitted on 12/02/2022 (attached) as per statutory requirements. • The EC was granted only on 09/01/2023, resulting in a delay of approx. 1 year and 4 months post-RERA registration. • Construction could not legally commence prior to receipt of EC. • Impact of Pune District Mining

Litigation declared1

CaseCourtStatus
826/2021SUB DIVISIONAL OFFICERClosed

Complaints filed with MahaRERA29

Case no.ComplainantRespondentFiled
CC005000000370946INTEGRATED BUSINESS ECOSYSTEM PVT LTDSAI NAVODAY CLINIC PVT. LTD. THROUGH DIRECTOR MRS. PRATIBHA PRADIPKUMAR TUPERE25/05/2024
CC005000000370947INTEGRATED BUSINESS ECOSYSTEM PVT LTDSAI NAVODAY CLINIC PVT. LTD. THROUGH DIRECTOR PRATIBHA PRADIPKUMAR TUPERE25/05/2024
CC12400169Integrated Business Ecosystem Private LimitedANKUSH MALHOTRA (ALLOTTEE)21/09/2024
CC12400170Integrated Business Ecosystem Private LimitedANKUSH MALHOTRA (ALLOTTEE)21/09/2024
CC12502762Integrated Business Ecosystem Private LimitedMRS SAVITA CHETAN GHOLAP06/08/2025
CC12502763Integrated Business Ecosystem Private LimitedMRS SAVITA CHETAN GHOLAP06/08/2025
CC12502774Integrated Business Ecosystem Private LimitedVISHNU BHAURAO GHUGE07/08/2025
CC12502776Integrated Business Ecosystem Private LimitedMR VASANT MAHADEV JADHAV07/08/2025
CC12502777Integrated Business Ecosystem Private LimitedMRS SHUBHANGI DHANANJAY BHARGAV07/08/2025
CC12502778Integrated Business Ecosystem Private LimitedNITHIN MOHANDAS SHETTY07/08/2025
CC12502779Integrated Business Ecosystem Private LimitedNITESH KUMAR07/08/2025
CC12502780Integrated Business Ecosystem Private LimitedNEERAJ DHANANJAY BHARGAV07/08/2025
CC12600618Integrated Business Ecosystem Private LimitedSAI NAVODAY CLINIC PVT LTD03/02/2026
CC12600619Integrated Business Ecosystem Private LimitedSAI NAVODAY CLINIC PVT LTD03/02/2026
CC12600620Integrated Business Ecosystem Private LimitedMR ANKUSH MALHOTRA03/02/2026
CC12600621Integrated Business Ecosystem Private LimitedMR ANKUSH MALHOTRA03/02/2026
CC12601656Integrated Business Ecosystem Private LimitedNITIN ASHOK KAND24/03/2026
CC12601657Integrated Business Ecosystem Private LimitedADITYA AGRAWAL24/03/2026
CC12601658Integrated Business Ecosystem Private LimitedMADAN KUMAR24/03/2026
CC12603098Integrated Business Ecosystem Private LimitedINDUBAI NARAWADE25/05/2026
CC12603099Integrated Business Ecosystem Private LimitedSACHIN SINHA25/05/2026
CC12603100Integrated Business Ecosystem Private LimitedSHILPA SURENDRA KATKE25/05/2026
CC12603367Integrated Business Ecosystem Private LimitedBAL MUKUND CHAUHAN02/06/2026
CC12603101Integrated Business Ecosystem Private LimitedSHILPA SURENDRA KATKE25/05/2026
CC12603181Integrated Business Ecosystem Private LimitedHIREN TRIVEDI28/05/2026
CC12604247Aniket JadhavIntegrated Business Ecosystem Private Limited06/07/2026
CC12604818Integrated Business Ecosystem Private LimitedMADHAVI SUMEET KHATKE31/07/2026
CC12604844Madhavi Sumeet KhatkeIntegrated Business Ecosystem Private Limited01/08/2026
CC12604962Rohit Sidram PawarIntegrated Business Ecosystem Private Limited05/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed150

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 150 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 ALTAIR.pdf18 Jul 2026
Withdrawal Update Form 2File: Form-2 Altair 30062026.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3 Altair 30062026 f.pdf18 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A Altair.pdf19 Jun 2026
Withdrawal Update Form 1File: FORM 1 Altair 07042026.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 Altair 07042026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form-2 - Altair.pdf20 Apr 2026
Withdrawal Update Form 2File: Form-2 - Altair.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Altaire 31032026.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Altaire 31032026.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 Altair 07012026.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2 Altair 31122025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Altair 31122025.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1 ALTAIR 30092025.pdf17 Oct 2025
Withdrawal Update Form 1File: FORM 1 ALTAIR 30092025.pdf17 Oct 2025
Withdrawal Update Form 2File: 20251015183135.pdf17 Oct 2025
Withdrawal Update Form 2File: 20251015183135.pdf17 Oct 2025
Withdrawal Update Form 3File: FORM 3 Altair 30092025.pdf17 Oct 2025
Withdrawal Update Form 3File: FORM 3 Altair 30092025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 ALTAIR.pdf27 Aug 2025
Form 1File: FORM 1 ALTAIR 30062023.pdf3 Jun 2025
Form 2File: FORM 2 ALTAIR 30062023.pdf3 Jun 2025
Form 3File: FORM 3 ALTAIR 30062023.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: INVENTORY ALTAIR 30062023.pdf3 Jun 2025
Form 1File: FORM 1 ALTAIR 30092023.pdf3 Jun 2025
Form 2File: FORM 2 ALTAIR 30092023.pdf3 Jun 2025
Form 3File: FORM 3 ALTAIR 30092023.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: INVENTORY ALTAIR 30092023.pdf3 Jun 2025
Form 1File: FORM 1 ALTAIR 31122023.pdf3 Jun 2025
Form 2File: FORM 2 ALTAIR 31122023.pdf3 Jun 2025
Form 3File: FORM 3 ALTAIR 31122023.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: INVENTORY ALTAIR 31122023.pdf3 Jun 2025
Form 1File: FORM 1 ALTAIR 31032023.pdf3 Jun 2025
Form 2File: FORM 2 ALTAIR 31032023.pdf3 Jun 2025
Form 3File: FORM 3 ALTAIR 31032023.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: INVENTORY ALTAIR 31032023.pdf3 Jun 2025
Form 1File: FORM 1 ALTAIR 30062023.pdf3 Jun 2025
Form 2File: FORM 2 ALTAIR 30062023.pdf3 Jun 2025
Form 3File: FORM 3 ALTAIR 30062023.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: INVENTORY ALTAIR 30062023.pdf3 Jun 2025
Form 1File: Form 1 Altair.pdf7 May 2025
Form 1File: Form 1 Altair.pdf7 May 2025
Form 2File: FORM 1 ALTAIR 31122024.pdf7 May 2025
Form 3File: FORM 1 ALTAIR 31122024.pdf7 May 2025
OthersFile: FORM 2 ALTAIR 31122024.pdf7 May 2025
Disclosure of Sold and Booked InventoryFile: FORM 3 ALTAIR 31122024.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ALTAIR 31122024.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Altair 31032025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 VTP Altair 31032025.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: ALTAIR 31032025.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ALTAIR 31122024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ALTAIR 31122024.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: ALTAIR 30092024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: ALTAIR 31122024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ALTAIR 31122024.pdf10 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 ALTAIR MARCH 2024.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ALTAIR 30092024.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ALTAIR 30092024.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ALTAIR 19102024.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Altair.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: ALTAIRE 30062024.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vtp Altair 300624.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ALTAIR.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ALTAIR 31032024.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: INVENTORY ALTAIR 31032024.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ALTAIR 31032024.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ALTAIR 31032024.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ALTAIR 31032024.pdf4 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ALTAIR 30092022.pdf29 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY ALTAIR 31122023.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ALTAIR 24112023.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ALTAIR 21122023.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ALTAIR 31122023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ALTAIR 23112023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ALTAIR 22122023.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ALTAIR 31122023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ALTAIR 23112023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ALTAIR 20122023.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ALTAIR 31122023.pdf22 Jan 2024

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VTP ALTAIR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

2 kmVTP ALTAIRCompleted 63Lapsed / revoked 30Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 130 registered projects within 2 km.

Builder: Integrated Business Ecosystem Private Limited

Integrated Business Ecosystem Private Limited has 3 registrations on MahaRERA, including VTP ALTAIR and FLAMANTE BY VTP LUXE PHASE 1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that VTP ALTAIR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if VTP ALTAIR is delayed beyond 29 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VTP ALTAIR?

The registered promoter entity is Integrated Business Ecosystem Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VTP ALTAIR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VTP ALTAIR?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VTP ALTAIR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VTP ALTAIR?

The professionals named in the filing: Architect: ANA Consortium Pvt Ltd; Architect: VK design & projects Pvt. Ltd.; Architect: VK ARCH; Engineer: Girish Awinashe; Engineer: Strudcom Consultants Private Limited; Engineer: himmat lad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VTP ALTAIR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VTP ALTAIR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VTP ALTAIR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.