Home / Browse projects / Pune, Maharashtra / NYATI ERA IV

Registered Litigation declared Residential / Group Housing project

NYATI ERA IV

By NYATI CONSTRUCTION PRIVATE LIMITED

RG-MH-31853 · RERA PR1263032500175 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 1 complaint at MahaRERA
  • Rs 75.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
0 of 60Construction stages doneacross 6 buildings; furthest along: Excavation, 95%
268 of 312Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

NYATI ERA IV is a Residential / Group Housing project by NYATI CONSTRUCTION PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as PR1263032500175 on 1 Jul 2025. Possession is promised by 30 Jun 2029. 44 of the 312 units on this registration are recorded sold or booked, and 0 of 60 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNYATI ERA IV
  • TypeResidential / Group Housing
  • Location
    • DHANORI LOHEGAON ROAD
    • DHANORI
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411015
  • Pincode411015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1263032500175
  • ReraGenie IDRG-MH-31853

Builder

  • NameNYATI CONSTRUCTION PRIVATE LIMITED
  • Entity typeCompany
  • CINU45202MH1996PTC102517
  • GSTIN27AAACN6421D1ZU
  • DirectorsPRANAV NITIN NYATI, NITIN DWARKADAS NYATI
  • Other registrations5 more →
  • Completed2 of 6

Key dates

this monthRegisteredJul 2025PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jul 2025
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings6 building records
  • Documents filed55 files

Current status

14%44 of 312 units booked
6.6%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING-JNA151352052
WING-KNA151352052
WING-LNA151352052
WING-MNA151352052
WING-NNA151352052
WING-ONA151352052

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 60 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 95%.

WING-J15%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING-K15%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING-L15%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure2%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING-M15%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure2%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING-N13%
ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure2%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING-O15%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth50%
Stilt Floor0%
Slabs of Super Structure2%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed996

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots996
Stilt / Ground455
Basement541
BuildingStilt / GroundBasementTotal
WING-J81100181
WING-K81100181
WING-L7481155
WING-M7290162
WING-N7290162
WING-O7580155

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area31,400 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 75.00 crore
CERSAI search filedYes
Declared on13 Aug 2025
LandownerVillageDistrict
COOJI ALIAS COOVERJI DADY KATRAKPune (CB)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI34590.68
Proposed, not sanctioned34,591 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., G.01/B, World Trade Center, Tower 1, Kharadi, Opp EAON Free Zone, Pune, Maharashtra.411014
Estimated costRs 106.92 cr
Cost incurredRs 7.04 cr
Work done6.59%
BuildingWingEstimatedIncurred
WING-JNARs 18.59 crRs 1.72 cr
WING-KNARs 18.59 crRs 1.56 cr
WING-MNARs 15.26 crRs 98.61 lakh
WING-NNARs 15.26 crRs 92.35 lakh
WING-LNARs 14.11 crRs 1.01 cr
WING-ONARs 14.11 crRs 84.63 lakh
-NARs 11.01 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJEEV MUKUND MEHTA
ArchitectSHIRISH DASNURKAR
EngineerAMOL SHITOLE
EngineerSUBHASH BHANDIGARE
EngineerVishwanath Dhande
EngineerACHYUT WATVE
Chartered AccountantNICKY HIRANAND MILANI
PartnerRole in project
NYATI CONSTRUCTION PRIVATE LIMITED-

Litigation declared4

CaseCourtStatus
1046/2023CVIL JUDGE SENIOR DIVISIONOngoing
608/2020CIVIL JUDGE SENIOR DIVISIONOngoing
721/2024CIVIL JUDGE SENIOR DIVISIONOngoing
1867/2024CIVIL JUDGE SENIOR DIVISONOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600451Ram GawaliNYATI CONSTRUCTION PRIVATE LIMITED29/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Nyati Era IV Form 2A 2025-2026.pdf23 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Era IV Q4.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf19 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf19 Feb 2026
Withdrawal Update Form 3File: Form 3 Q3 Era IV.pdf19 Feb 2026
Layout approvalFile: Sanction BP Layout.pdf3 Dec 2025
Building plan approvalFile: Parking Layout.pdf3 Dec 2025
Building plan approvalFile: WING J ELEVATION.pdf3 Dec 2025
Building plan approvalFile: WING J SECTION AA.pdf3 Dec 2025
Building plan approvalFile: WING J TYP FLR PLAN.pdf3 Dec 2025
Building plan approvalFile: WING K ELEVATION.pdf3 Dec 2025
Building plan approvalFile: WING K SECTION AA.pdf3 Dec 2025
Building plan approvalFile: WING K TYP FLR PLAN.pdf3 Dec 2025
Building plan approvalFile: WING L SECTION AA.pdf3 Dec 2025
Building plan approvalFile: WING L TYP FLR PLAN.pdf3 Dec 2025
Building plan approvalFile: WING M SECTION AA.pdf3 Dec 2025
Building plan approvalFile: WING M TYP FLR PLAN.pdf3 Dec 2025
Building plan approvalFile: WING N ELEVATION SECTION.pdf3 Dec 2025
Building plan approvalFile: WING N TYP FLR PLAN.pdf3 Dec 2025
Building plan approvalFile: WING O ELEVATION SECTION.pdf3 Dec 2025
Building plan approvalFile: WING O TYP FLR PLAN.pdf3 Dec 2025
Layout approvalFile: Parking Layout.pdf25 Nov 2025
Building plan approvalFile: WING J ELEVATION.pdf25 Nov 2025
Building plan approvalFile: WING J SECTION AA.pdf25 Nov 2025
Building plan approvalFile: WING J TYP FLR PLAN.pdf25 Nov 2025
Building plan approvalFile: WING K ELEVATION.pdf25 Nov 2025
Building plan approvalFile: WING K SECTION AA.pdf25 Nov 2025
Building plan approvalFile: WING K TYP FLR PLAN.pdf25 Nov 2025
Building plan approvalFile: WING L SECTION AA.pdf25 Nov 2025
Building plan approvalFile: WING L TYP FLR PLAN.pdf25 Nov 2025
Building plan approvalFile: WING M SECTION AA.pdf25 Nov 2025
Building plan approvalFile: WING M TYP FLR PLAN.pdf25 Nov 2025
Building plan approvalFile: WING N ELEVATION SECTION.pdf25 Nov 2025
Building plan approvalFile: WING N TYP FLR PLAN.pdf25 Nov 2025
Building plan approvalFile: WING O ELEVATION SECTION.pdf25 Nov 2025
Building plan approvalFile: WING O TYP FLR PLAN.pdf25 Nov 2025
Layout approvalFile: Sanction BP Layout.pdf20 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf30 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf30 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf30 Oct 2025
Declaration and undertaking (Annexure A)File: ORDER 50 DECLARATION.pdf7 May 2025
Layout approvalFile: Sanction Layout Phase Marking.pdf5 May 2025
Building plan approvalFile: J TYP FLOOR PLANS.pdf5 May 2025
Building plan approvalFile: J SECTION.pdf5 May 2025
Building plan approvalFile: J ELEVATION.pdf5 May 2025
Building plan approvalFile: K PLANS ELEVATION SECTION.pdf5 May 2025
Building plan approvalFile: L PLAN ELEVATION SECTION.pdf5 May 2025
Building plan approvalFile: M PLAN ELEVATION SECTION.pdf5 May 2025
Building plan approvalFile: N TYP 1ST TO 7TH FLR PLANS.pdf5 May 2025
Building plan approvalFile: N ELEVATION SECTION.pdf5 May 2025
Building plan approvalFile: O TYP 1ST TO 7TH FLR PLANS.pdf5 May 2025
Layout approvalFile: Parking Layout.pdf5 May 2025
Building plan approvalFile: O ELEVATION SECTION.pdf5 May 2025

How this compares with Pune

14%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NYATI ERA IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANORI13,700+ in Pune

2 kmNYATI ERA IVCompleted 88Lapsed / revoked 26Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 162 registered projects within 2 km.

Builder: NYATI CONSTRUCTION PRIVATE LIMITED

NYATI CONSTRUCTION PRIVATE LIMITED has 6 registrations on MahaRERA, including NYATI ERA I and NYATI ERA II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NYATI ERA IV is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI ERA IV?

The registered promoter entity is NYATI CONSTRUCTION PRIVATE LIMITED, a company as per the filing. Its CIN U45202MH1996PTC102517 and GSTIN 27AAACN6421D1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI ERA IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NYATI ERA IV?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NYATI ERA IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NYATI ERA IV?

The professionals named in the filing: Architect: SANJEEV MUKUND MEHTA; Architect: SHIRISH DASNURKAR; Engineer: AMOL SHITOLE; Engineer: SUBHASH BHANDIGARE; Engineer: Vishwanath Dhande; Engineer: ACHYUT WATVE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NYATI ERA IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI ERA IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI ERA IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.