ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / VIVA HARITARA

Registered No litigation declared Residential / Group Housing project

VIVA HARITARA

By M/S.SAI SAMRAT REALTORS

RG-MH-28849 · RERA P99000027321 · Last updated on MahaRERA portal: 8 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
11 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 94%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

VIVA HARITARA is a Residential / Group Housing project by M/S.SAI SAMRAT REALTORS in Palghar, Maharashtra, registered with MahaRERA as P99000027321 on 2 Dec 2020. Possession is promised by 30 Jun 2029.

At a glance

Project

  • NameVIVA HARITARA
  • TypeResidential / Group Housing
  • Location
    • PRAGATI NAGAR
    • NALLASOPARA
    • Vasai
    • Palghar
    • 401209
  • Pincode401209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000027321
  • ReraGenie IDRG-MH-28849

Builder

  • NameM/S.SAI SAMRAT REALTORS
  • Entity typePartnership
  • PartnersPANNALAL RAMACHARYA MISHRA, RAMSURAT RAMACHARJ MISHRA, VIRENDRAKUMAR RAMSURAT MISHRA, VINIT PANNALAL MISHRA, INDU PANNALAL MISHRA

Key dates

this monthRegisteredDec 2020PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Dec 2020
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIVANSH HEIGHTS WING -MNA1616000
SHIVANSH HEIGHTS WING-NNA1717000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 94%.

SHIVANSH HEIGHTS WING -M62%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.22%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHIVANSH HEIGHTS WING-N62%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure94%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.22%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered2
Open Space18
BuildingClosed/CoveredOpen SpaceTotal
SHIVANSH HEIGHTS WING -M1910
SHIVANSH HEIGHTS WING-N1910

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,174 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SAI SAMRAT REALTORSVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityvvcmc
Permissible FSI7937.84
Proposed, not sanctioned6,007 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAI KIRAN NARAYAN NAGAR NALLASOPARA EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE
EngineerPARESH UNNARKAR
Chartered AccountantK M A & CO CHAUBEY
PartnerRole in project
M/S.SAI SAMRAT REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Aug 2021

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR ARCHITECT 31-3-2025.pdf8 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM -3 31-3-2025.pdf8 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR G R ENGINEER 31-3-2025.pdf8 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: CA FORM -5 31-3-2025.pdf8 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR ARCHITECT 31-12-2024.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSR CA FORM 3 31-12-2024 1 MB.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR ENGINEER 31-12-2024.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 30-06-24.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FROM3 30-09-24.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR ARCHITECT 30-6-2024.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HIMGIRI G R ENG 30-9-2024.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR G R ENG 30-6-2024.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR G R ENG 30-9-2024.pdf26 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SSR QUALITY ASSURANCE CERTI FICATE.pdf9 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSR CA FORM- 3 23-5-2024.pdf9 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SSR CA FORM -5 23-5-2024.pdf9 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR ARCHITECT 30-3-2024.pdf20 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ssr enginear 31-3-2024.pdf20 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SSR FORM 5 31-3-2023.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR ARCHITECT 31-3-2023.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR AJAY WADE 27-10-2023.pdf4 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR G R CONSULTANT FORM 227-10-2023.pdf4 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR FORM -2 G R ENGINEERS 31-1-2024.pdf4 Mar 2024
Details of encumbrances concerned to FinanceFile: SSR ENCUMBRANCE OTHER FINANCE.pdf9 Feb 2024
Details of encumbrances concerned to FinanceFile: SSR ENCUMBRANCE LAND LEGAL.pdf9 Feb 2024
Details of encumbrances concerned to LegalFile: SSR ENCUMBRANCE OTHER FINANCE.pdf9 Feb 2024
Details of encumbrances concerned to LegalFile: SSR ENCUMBRANCE LAND LEGAL.pdf9 Feb 2024
Declaration about Commencement CertificateFile: SSR DECLERATION COMMENCEMENT CERTIFICATE.pdf9 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SSR G R CONSULTANT FORM 227-10-2023.pdf24 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SSR DISCLOSER OTHER REALESTATE.pdf24 Nov 2023
Details of encumbrances concerned to FinanceFile: SSR SELF DECLERATION.pdf26 Feb 2023
Details of encumbrances concerned to LegalFile: SSR SELF DECLERATION.pdf26 Feb 2023
CERSAI detailsFile: SSR CREDIA DETAIL.pdf26 Feb 2023
Proforma of Agreement for saleFile: SSR RERA NEW SALE AGREEMENT RERA FORMAT PDF.pdf26 Feb 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf26 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SSR ANUAL AUDIT REPORT 2020-2021.pdf13 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SSR ESSCROW ACCOUNT DETAIL.pdf13 Feb 2023
Deviation Report with respect to Allotment letterFile: NO DEVEATION FOR ALLOTMENT.pdf13 Feb 2023
Deviation Report with respect to model copy of AgreementFile: NO DEVEATION BY AGRREMENT.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SSR FORM 5 ANNUAL REPORT.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR ARCHITECT CERTIFICATE 12-12-2022.pdf14 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SSR GR ENGINEEAR 1-11-2022.pdf14 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA FORM - 3.pdf16 Jul 2022
Declaration about Commencement CertificateFile: SSR FORM D.pdf14 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SSR ENGINEEAR 2A QUALITY CERTIFICATE.pdf19 Aug 2021
Disclosure of sold/ booked inventoryFile: SSR SOLD DETAIL.pdf19 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SSR CA FORM 5 1MB.pdf19 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SSR PLINT CERTIFICAT FOR ARCHITECT.pdf19 Aug 2021
Proforma of Allotment letterFile: RERA ALLOTMENT LETTER.pdf1 Dec 2020
OtherFile: CLERIFICATION AND POWERcompressed.pdf1 Dec 2020
OtherFile: CLERIFICATION LETTER.pdf26 Nov 2020
OtherFile: SSR DEVELOPEMENT PART 2.pdf26 Nov 2020
Proforma of Allotment letterFile: SSR SALE AGREEMENT.pdf23 Nov 2020
Layout approvalFile: SSR LAYOUT.pdf10 Nov 2020
Building plan approvalFile: SSR N TYPICAL FLOOR PLAN.pdf10 Nov 2020
PAN CardFile: SSR PAN PDF.pdf10 Nov 2020
Copy of the legal title reportFile: SSR TITAL SEARCH REPORT 2.pdf10 Nov 2020
Details of encumbrancesFile: encumbrance.pdf10 Nov 2020
Copy of Layout Approval (in case of layout)File: SSR LAYOUT.pdf10 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: SSR N TYPICAL FLOOR PLAN.pdf10 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: ssr cc revised.pdf10 Nov 2020
Declaration in FORM BFile: form b.pdf10 Nov 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf10 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engeneears certificate b1.pdf10 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGEENEAR FORM 2.pdf10 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM - 3 1mb.pdf10 Nov 2020
Proforma of Allotment letterFile: SSR ALLOTMENT LETTER.pdf10 Nov 2020

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIVA HARITARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALLASOPARA3,200+ in Palghar

2 kmVIVA HARITARACompleted 36Lapsed / revoked 27Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 136 registered projects within 2 km.

Builder: M/S.SAI SAMRAT REALTORS

M/S.SAI SAMRAT REALTORS has 1 registration on MahaRERA, including VIVA HARITARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if VIVA HARITARA is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIVA HARITARA?

The registered promoter entity is M/S.SAI SAMRAT REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIVA HARITARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIVA HARITARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIVA HARITARA?

The professionals named in the filing: Architect: AJAY WADE; Engineer: PARESH UNNARKAR; Chartered Accountant: K M A & CO CHAUBEY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIVA HARITARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIVA HARITARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIVA HARITARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.