Home / Browse projects / Pune, Maharashtra / VISION FLORA

Completed No litigation declared Commercial project

VISION FLORA

By SIDDHIVINAYAK NAMRATA DEVELOPERS

RG-MH-17507 · RERA P52100029188 · Last updated on MahaRERA portal: 27 Feb 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2026Possession promisedregistration recorded completed
6 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
29 of 102Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

VISION FLORA is a Commercial project by SIDDHIVINAYAK NAMRATA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100029188 on 3 May 2021. The registration is recorded completed; possession was promised by 30 Apr 2026. The completion date has moved by 24 months from the original filing. 73 of the 102 units on this registration are recorded sold or booked, and 6 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameVISION FLORA
  • TypeCommercial
  • Location
    • Opp Rose Icon hsg. society
    • Pimple Saudagar
    • Pimpale Saudagar
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • RERA no.P52100029188
  • ReraGenie IDRG-MH-17507

Builder

  • NameSIDDHIVINAYAK NAMRATA DEVELOPERS
  • Entity typePartnership
  • PartnersDEEPAK KANTILAL SHAH, RAMESH YUGRAJ KAVEDIYA
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredMay 2021First promiseApr 2024Revised toApr 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 May 2021
  • Promised completion30 Apr 2026
  • Revised completionRevised to 30 Apr 2026 (originally 30 Apr 2024)
  • Buildings3 building records
  • Documents filed118 files

Current status

72%73 of 102 units booked
99.1%Work done, per cost certificate

Figures as on 27 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C1NA980102102
C2NA40000
C3NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

C155%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,091 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI16865.0
Proposed, not sanctioned7,554 sq m
Buildings approved3
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAshoka Gallary Bund Garden Road 411001
Estimated costRs 21.15 cr
Cost incurredRs 20.95 cr
Work done99.06%
BuildingWingEstimatedIncurred
C1NARs 20.73 crRs 20.57 cr
-NARs 41.46 lakhRs 37.46 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK A Architecture
EngineerStrudcom Consultants Pvt. Ltd.
EngineerSanjivani Ade
Chartered AccountantR K Gandhi & Co
Chartered AccountantSSAP & Associates
PartnerRole in project
Siddhivinayak Namrata Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019203Apr 2024 → Apr 2025

Reason as filed by the promoterThis is regarding our project “VISION FLORA” [Maharera Number-P52100029188]. The construction of our project is 100% completed as per sanction plan but due to unforeseen circumstances beyond our control, the process of obtaining the occupancy certificate has been delayed. We are currently working diligently to address any outstanding issues and ensure compliance with all regulatory requirements. Nevertheless, the additional time is necessary to expedite the final stages of the certification process effectively. We understand the importance of obtaining the occupancy certificate promptly and as

EA11082502350Apr 2024 → Apr 2026

Reason as filed by the promoterDespite full completion, obtaining the Occupancy Certificate (OC) has been delayed due to unforeseen administrative and procedural complications beyond our control. We continue to engage with relevant authorities and resolve all issues to expedite certification.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12601398Siddhivinayak Namrata DevelopersMrs Sunayana Jaiswal13/03/2026
CC12601693Siddhivinayak Namrata DevelopersMrs Sunayana Jaiswal25/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Part Occupancy Certificate_C1_C2_C3 Wing_2019.pdf27 Feb 2026
Occupational CertificateFile: Vision Flora_Part Occupancy_10062025.pdf16 Feb 2026
Occupational CertificateFile: Vision Flora_Part Occupancy_17072025.pdf16 Feb 2026
Withdrawal Update Form 1File: Vision Flora_Form 1_Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 2File: Vision Flora_Form 2_Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 3File: Vision Flora_Form 3_Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 1File: Form 1 Sep 2025.pdf20 Nov 2025
Withdrawal Update Form 2File: Form 2 Sep 2025.pdf20 Nov 2025
Withdrawal Update Form 3File: Form 3 Sep 2025.pdf20 Nov 2025
Form 5 (FY 2023-2024)File: Form 5_FY 2023-24.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Vision Flora_Form 5_FY 2024_25.pdf9 Oct 2025
Form 1File: Vision Flora_Form 1_30062025.pdf18 Jul 2025
Form 2File: Vision Flora_Form 2_30062025.pdf18 Jul 2025
Form 3File: Vision Flora_Form 3_30062025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Vision Flora_Disclosure of sold_unsold inventory_30062025.pdf18 Jul 2025
Form 124 Jun 2025
Form 224 Jun 2025
Form 3File: 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)_March 2025.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory_March 2025.pdf24 Jun 2025
Form 124 Jun 2025
Form 224 Jun 2025
Form 3File: 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)_Dec 2024.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory_March 2025.pdf24 Jun 2025
Form 124 Jun 2025
Form 224 Jun 2025
Form 3File: 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)_Sept 2024.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory_March 2025.pdf24 Jun 2025
Form 124 Jun 2025
Form 224 Jun 2025
Form 3File: 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)_June 2024.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory_March 2025.pdf24 Jun 2025
Form 124 Jun 2025
Form 224 Jun 2025
Form 3File: 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)_March 2024.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory_March 2024.pdf24 Jun 2025
Form 2A (FY 2024-2025)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)_March 2025.pdf24 Jun 2025
Form 2A (FY 2023-2024)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)_March 2024.pdf24 Jun 2025
Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)_MArch 2023.pdf24 Jun 2025
Disclosure of sold/ booked inventoryFile: Vision Flora_Declaration of sold unsold inventory_31032025.pdf5 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Vision Flora_C1 _Form 2A_2024-25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora_Form 1_March 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_Form 3_March 2025.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Form 2_March 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_CA Cert_Dec 2024.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Engg Cert_Dec 2024.pdf21 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora C1 BLDG_Architect Cert_Dec 2024.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Vision Flora_Form 5_FY 2023-24.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_Form 3_Signed_30092024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_Form 3_Signed_30092024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Form 2_Signed_30092024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora_Form 1_Sept 2024 Signed.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Form 2_Signed_30062024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_Form 3_Signed_30062024.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora_Form1_June 2024_Signed.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora_Arch Cert_MArch 2024_Signed.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Engg Cert_March 2024_Signed.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Vision Flora March 2024_Signed.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality assurance certificate VISION FLORA.pdf5 Apr 2024
Disclosure of sold/ booked inventoryFile: quality assurance certificate VISION FLORA.pdf5 Apr 2024
Declaration in FORM BFile: Form B Latest_12032024.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_unsold inventory_04032024.pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora_Form1_Dec 2023_Signed.pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Form 2_Dec 2023.pdf6 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Vision Flora_Form 2A_2021-22.pdf6 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vision Flora_Form 2A_2022-23.pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Engg Certificate_Dec 2023.pdf20 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 231231-RERA Certificate form 1.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_CA Certificate_Dec 2023.pdf6 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Vision Flora 21-22.pdf6 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vision Flora 22-23.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Engg certificate_Nov 2023.pdf24 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_CA Certificate_Nov 2023.pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Architect Form 1 Sept 2023.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate_June 2023.pdf11 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora Architect Certificate_Sept 2022.pdf12 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora Engg Certificate_June 2022.pdf2 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora Rera Arch_June 2022.pdf25 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora Rera Certificate_June 2022.pdf14 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora Rera Certificate_MArch 2022.pdf14 Apr 2022

How this compares with Pune

72%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISION FLORA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimple Saudagar13,700+ in Pune

Builder: SIDDHIVINAYAK NAMRATA DEVELOPERS

SIDDHIVINAYAK NAMRATA DEVELOPERS has 2 registrations on MahaRERA, including VISION FLORA and VISION FLORA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VISION FLORA is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISION FLORA?

The registered promoter entity is SIDDHIVINAYAK NAMRATA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISION FLORA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VISION FLORA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VISION FLORA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISION FLORA?

The professionals named in the filing: Architect: VK A Architecture; Engineer: Strudcom Consultants Pvt. Ltd.; Engineer: Sanjivani Ade; Chartered Accountant: R K Gandhi & Co; Chartered Accountant: SSAP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISION FLORA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISION FLORA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISION FLORA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.