VISION FLORA
By SIDDHIVINAYAK NAMRATA DEVELOPERS
RG-MH-17507 · RERA P52100029188 · Last updated on MahaRERA portal: 27 Feb 2026
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VISION FLORA is a Commercial project by SIDDHIVINAYAK NAMRATA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100029188 on 3 May 2021. The registration is recorded completed; possession was promised by 30 Apr 2026. The completion date has moved by 24 months from the original filing. 73 of the 102 units on this registration are recorded sold or booked, and 6 of 33 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameVISION FLORA
- TypeCommercial
- Location
- Opp Rose Icon hsg. society
- Pimple Saudagar
- Pimpale Saudagar
- Haveli
- Pune
- 411027
- Pincode411027
- RERA no.P52100029188
- ReraGenie IDRG-MH-17507
Builder
- NameSIDDHIVINAYAK NAMRATA DEVELOPERS
- Entity typePartnership
- PartnersDEEPAK KANTILAL SHAH, RAMESH YUGRAJ KAVEDIYA
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 May 2021
- Promised completion30 Apr 2026
- Revised completionRevised to 30 Apr 2026 (originally 30 Apr 2024)
- Buildings3 building records
- Documents filed118 files
Current status
Figures as on 27 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C1 | NA | 9 | 8 | 0 | 102 | 102 |
| C2 | NA | 4 | 0 | 0 | 0 | 0 |
| C3 | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 27 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.
C155%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C1 | NA | Rs 20.73 cr | Rs 20.57 cr |
| - | NA | Rs 41.46 lakh | Rs 37.46 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK A Architecture |
| Engineer | Strudcom Consultants Pvt. Ltd. |
| Engineer | Sanjivani Ade |
| Chartered Accountant | R K Gandhi & Co |
| Chartered Accountant | SSAP & Associates |
| Partner | Role in project |
|---|---|
| Siddhivinayak Namrata Developers | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThis is regarding our project “VISION FLORA” [Maharera Number-P52100029188]. The construction of our project is 100% completed as per sanction plan but due to unforeseen circumstances beyond our control, the process of obtaining the occupancy certificate has been delayed. We are currently working diligently to address any outstanding issues and ensure compliance with all regulatory requirements. Nevertheless, the additional time is necessary to expedite the final stages of the certification process effectively. We understand the importance of obtaining the occupancy certificate promptly and as
Reason as filed by the promoterDespite full completion, obtaining the Occupancy Certificate (OC) has been delayed due to unforeseen administrative and procedural complications beyond our control. We continue to engage with relevant authorities and resolve all issues to expedite certification.
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601398 | Siddhivinayak Namrata Developers | Mrs Sunayana Jaiswal | 13/03/2026 |
| CC12601693 | Siddhivinayak Namrata Developers | Mrs Sunayana Jaiswal | 25/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Apr 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Apr 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Apr 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed118
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Part Occupancy Certificate_C1_C2_C3 Wing_2019.pdf | 27 Feb 2026 |
| Occupational CertificateFile: Vision Flora_Part Occupancy_10062025.pdf | 16 Feb 2026 |
| Occupational CertificateFile: Vision Flora_Part Occupancy_17072025.pdf | 16 Feb 2026 |
| Withdrawal Update Form 1File: Vision Flora_Form 1_Dec 2025.pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: Vision Flora_Form 2_Dec 2025.pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: Vision Flora_Form 3_Dec 2025.pdf | 15 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Sep 2025.pdf | 20 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 2025.pdf | 20 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Sep 2025.pdf | 20 Nov 2025 |
| Form 5 (FY 2023-2024)File: Form 5_FY 2023-24.pdf | 17 Oct 2025 |
| Form 5 (FY 2024-2025)File: Vision Flora_Form 5_FY 2024_25.pdf | 9 Oct 2025 |
| Form 1File: Vision Flora_Form 1_30062025.pdf | 18 Jul 2025 |
| Form 2File: Vision Flora_Form 2_30062025.pdf | 18 Jul 2025 |
| Form 3File: Vision Flora_Form 3_30062025.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Vision Flora_Disclosure of sold_unsold inventory_30062025.pdf | 18 Jul 2025 |
| Form 1 | 24 Jun 2025 |
| Form 2 | 24 Jun 2025 |
| Form 3File: 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)_March 2025.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory_March 2025.pdf | 24 Jun 2025 |
| Form 1 | 24 Jun 2025 |
| Form 2 | 24 Jun 2025 |
| Form 3File: 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)_Dec 2024.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory_March 2025.pdf | 24 Jun 2025 |
| Form 1 | 24 Jun 2025 |
| Form 2 | 24 Jun 2025 |
| Form 3File: 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)_Sept 2024.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory_March 2025.pdf | 24 Jun 2025 |
| Form 1 | 24 Jun 2025 |
| Form 2 | 24 Jun 2025 |
| Form 3File: 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)_June 2024.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory_March 2025.pdf | 24 Jun 2025 |
| Form 1 | 24 Jun 2025 |
| Form 2 | 24 Jun 2025 |
| Form 3File: 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)_March 2024.pdf | 24 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory_March 2024.pdf | 24 Jun 2025 |
| Form 2A (FY 2024-2025)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)_March 2025.pdf | 24 Jun 2025 |
| Form 2A (FY 2023-2024)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)_March 2024.pdf | 24 Jun 2025 |
| Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)_MArch 2023.pdf | 24 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Vision Flora_Declaration of sold unsold inventory_31032025.pdf | 5 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Vision Flora_C1 _Form 2A_2024-25.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora_Form 1_March 2025.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_Form 3_March 2025.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Form 2_March 2025.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_CA Cert_Dec 2024.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Engg Cert_Dec 2024.pdf | 21 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora C1 BLDG_Architect Cert_Dec 2024.pdf | 13 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Vision Flora_Form 5_FY 2023-24.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_Form 3_Signed_30092024.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_Form 3_Signed_30092024.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Form 2_Signed_30092024.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora_Form 1_Sept 2024 Signed.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Form 2_Signed_30062024.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_Form 3_Signed_30062024.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora_Form1_June 2024_Signed.pdf | 10 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora_Arch Cert_MArch 2024_Signed.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Engg Cert_March 2024_Signed.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Vision Flora March 2024_Signed.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality assurance certificate VISION FLORA.pdf | 5 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: quality assurance certificate VISION FLORA.pdf | 5 Apr 2024 |
| Declaration in FORM BFile: Form B Latest_12032024.pdf | 12 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold_unsold inventory_04032024.pdf | 12 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora_Form1_Dec 2023_Signed.pdf | 6 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Form 2_Dec 2023.pdf | 6 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Vision Flora_Form 2A_2021-22.pdf | 6 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Vision Flora_Form 2A_2022-23.pdf | 6 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Engg Certificate_Dec 2023.pdf | 20 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 231231-RERA Certificate form 1.pdf | 10 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_CA Certificate_Dec 2023.pdf | 6 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Vision Flora 21-22.pdf | 6 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vision Flora 22-23.pdf | 6 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora_Engg certificate_Nov 2023.pdf | 24 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vision Flora_CA Certificate_Nov 2023.pdf | 24 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Architect Form 1 Sept 2023.pdf | 6 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate_June 2023.pdf | 11 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora Architect Certificate_Sept 2022.pdf | 12 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Flora Engg Certificate_June 2022.pdf | 2 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora Rera Arch_June 2022.pdf | 25 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora Rera Certificate_June 2022.pdf | 14 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Flora Rera Certificate_MArch 2022.pdf | 14 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 118 filed documents as one ZIP, foldered, with a manifest
Keep VISION FLORA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pimple Saudagar13,700+ in Pune
VANTAGE TWENTY ONE
VIVANTA REALTY
SHAKTI GARDENS
Grandwell Properties and Leasing Private L
24K OPULA
KOLTE-PATIL DEVELOPERS LIMITED
Sukhwani Minerva
Sukhwani Ramchandani LLP
MIDORI TOWER PHASE 4
VIKRAM DEVELOPERS AND PROMOTERS
Sai Aura
WJV LANDMARKS LLP
Builder: SIDDHIVINAYAK NAMRATA DEVELOPERS
SIDDHIVINAYAK NAMRATA DEVELOPERS has 2 registrations on MahaRERA, including VISION FLORA and VISION FLORA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VISION FLORA is delayed beyond 30 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VISION FLORA?
The registered promoter entity is SIDDHIVINAYAK NAMRATA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VISION FLORA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VISION FLORA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VISION FLORA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VISION FLORA?
The professionals named in the filing: Architect: VK A Architecture; Engineer: Strudcom Consultants Pvt. Ltd.; Engineer: Sanjivani Ade; Chartered Accountant: R K Gandhi & Co; Chartered Accountant: SSAP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VISION FLORA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback