Home / Browse projects / Pune, Maharashtra / VISION BOULEVARD - Phase II
VISION BOULEVARD - Phase II
RG-MH-70961 · RERA P52100018670 · Last updated on MahaRERA portal: 17 Feb 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VISION BOULEVARD - Phase II is a Others project by VISION HOME PROJECT in Pune, Maharashtra, registered with MahaRERA as P52100018670 on 27 Nov 2018. The registration is recorded completed; possession was promised by 30 Jun 2022. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameVISION BOULEVARD - Phase II
- TypeOthers
- Location
- Pimpale Saudagar
- Pimple Saudagar
- Haveli
- Pune
- 411027
- Pincode411027
- RERA no.P52100018670
- ReraGenie IDRG-MH-70961
Builder
- NameVISION HOME PROJECT
- Entity typePartnership
- PartnerBHAUSAHEB SOPANRAO BHOIR
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Nov 2018
- Promised completion30 Jun 2022
- Revised completionRevised to 30 Jun 2022 (originally 30 Jun 2021)
- Buildings2 building records
- Documents filed68 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| F WING | NA | 7 | 0 | 0 | 0 | 0 |
| E WING | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 80%.
F WING63%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
E WING28%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 13% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership16
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAJARAM ABAJI KUNJIR | Pimpale Saudagar | Pune |
| BALASAHEB PRADHAN KUNJIR | Pimpale Saudagar | Pune |
| KAILASH PRADHAN KUNJIR | Pimpale Saudagar | Pune |
| GULAB ABAJI KUNJIR | Pimpale Saudagar | Pune |
| RAMCHANDRA ABAJI KUNJIR | Pimpale Saudagar | Pune |
| LAXMAN ABAJI KUNJIR | Pimpale Saudagar | Pune |
| BHARAT ABAJI KUNJIR | Pimpale Saudagar | Pune |
| VIJAY ABAJI KUNJIR | Pimpale Saudagar | Pune |
| KUNJIR RAJARAM ABAJI | Pimpale Saudagar | Pune |
| KUNJIR BALASAHEB PRADHAN | Pimpale Saudagar | Pune |
| KUNJIR KAILASH PRADHAN | Pimpale Saudagar | Pune |
| KUNJIR GULAB ABAJI | Pimpale Saudagar | Pune |
| KUNJIR RAMCHANDRA ABAJI | Pimpale Saudagar | Pune |
| KUNJIR LAXMAN ABAJI | Pimpale Saudagar | Pune |
| KUNJIR BHARAT ABAJI | Pimpale Saudagar | Pune |
| KUNJIR VIJAY ABAJI | Pimpale Saudagar | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK-A - AR BANDU FUKE / AR TRUPTA JOSHI |
| Architect | VISHWAS KULKARNI |
| Engineer | STRUDCON CONSULTANT PVT LTD |
| Engineer | VISHAL THORAT |
| Chartered Accountant | CA MAHAVIR CHANODIYA |
| Partner | Role in project |
|---|---|
| VISION HOME PROJECT | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject is almost complete but we require 12 months extension to get OC/CC, Kindly grant us extension.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Nov 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Nov 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Nov 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 9 Jan 2024
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: FY 2024-25 Q3 S S VENTURES AOP ( R ) FORM 3.pdf | 17 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2023-24 Form 5 VHP.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 2024-25 Q 2 - VISION HOMES PROJECT - FORM 3 2.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: 2024-25 Q 2 - VISION HOMES PROJECT - FORM 3 2.pdf | 16 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2023-24 Form 5 VHP.pdf | 16 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3 JUN 24_0001_0001.pdf | 22 Jul 2024 |
| Certificates of CA (Form 3)File: form 3 signed mar 2024 vision boulevard.pdf | 3 Jul 2024 |
| Certificates of CA (Form 3)File: Dec 18_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Mar 19_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Jun 19_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Sep 19_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Dec 19_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Mar 20_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Jun 20_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Sep 20_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Dec 20_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Mar 21_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Jun 21_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Sep 21_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Dec 21_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Mar 22_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Jun 22_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Sep 22_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Dec 22_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Mar 23_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Jun 23_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Sep 23_compressed.pdf | 1 Jun 2024 |
| Certificates of CA (Form 3)File: Dec 23_compressed.pdf | 1 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: VHP (DECLARATION) AXIS BANK.pdf | 10 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration of encumbrances concered to legal.pdf | 9 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Declaration of encumbrances concered to legal.pdf | 9 Jan 2024 |
| CERSAI detailsFile: Undertaking for No charge.pdf | 9 Jan 2024 |
| Proforma of Agreement for saleFile: Agreement for sale_merged-1.pdf | 9 Jan 2024 |
| Proforma of Agreement for saleFile: Agreement for sale_merged-2_11zon.pdf | 9 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 11zon_JPEG-to-PDF.pdf | 9 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report in respect to Allotment letter.pdf | 9 Jan 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report in respect to ATS.pdf | 9 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Vision Boulevard Phase II 22-23.pdf | 4 Jan 2024 |
| Declaration about Commencement CertificateFile: Decl About Commencement Vision Boulward Phase 2.pdf | 30 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Vision Boulvard Phase 2 30 06 2021.pdf | 30 Sep 2021 |
| Declaration about Commencement CertificateFile: Rera format D.pdf | 6 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: download.pdf | 29 Jun 2021 |
| Form 2AFile: 2A 31032021.pdf | 28 Jun 2021 |
| Form 2AFile: 2a 31032020.pdf | 28 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Discloser of inventory of Building E.pdf | 28 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Discloser of inventory of Building F.pdf | 28 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 -2019 VIION HOMES PROJECT PHASE 2_compressed.pdf | 28 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2020 Vision Homes Project Phase II 31032020_compressed.pdf | 28 Jun 2021 |
| Form 2AFile: VISION BOULEVARD March.pdf | 5 Jul 2019 |
| Form 2AFile: VISION BOULEVARD June.pdf | 5 Jul 2019 |
| Building plan approvalFile: IOD.pdf | 22 Nov 2018 |
| Layout approvalFile: layout.pdf | 22 Nov 2018 |
| PAN CardFile: PAN CARD.pdf | 22 Nov 2018 |
| Copy of the legal title reportFile: Title Report.pdf | 22 Nov 2018 |
| Details of encumbrancesFile: encumbrance.pdf | 22 Nov 2018 |
| Copy of Layout Approval (in case of layout)File: layout.pdf | 22 Nov 2018 |
| Building Plan Approval (IOD)File: IOD.pdf | 22 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 22 Nov 2018 |
| Declaration in FORM BFile: formb.pdf | 22 Nov 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 22 Nov 2018 |
| Proforma of Allotment letterFile: allottment letter.pdf | 22 Nov 2018 |
| Proforma of Allotment letterFile: agreement.pdf | 22 Nov 2018 |
| Proforma of Allotment letterFile: agreement1.pdf | 22 Nov 2018 |
| Proforma of Allotment letterFile: agreement2.pdf | 22 Nov 2018 |
| Proforma of Allotment letterFile: agreement3.pdf | 22 Nov 2018 |
| Proforma of Allotment letterFile: agreement4.pdf | 22 Nov 2018 |
| Proforma of Allotment letterFile: agreement6.pdf | 22 Nov 2018 |
| OtherFile: Sheet No 11-11.pdf | 22 Nov 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VISION BOULEVARD - Phase I | vision boulevard 1 | 74 | Completed | Aug 2017 | Late, Mar 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 68 filed documents as one ZIP, foldered, with a manifest
Keep VISION BOULEVARD - Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pimple Saudagar13,700+ in Pune
VANTAGE TWENTY ONE
VIVANTA REALTY
SHAKTI GARDENS
Grandwell Properties and Leasing Private L
24K OPULA
KOLTE-PATIL DEVELOPERS LIMITED
Sukhwani Minerva
Sukhwani Ramchandani LLP
MIDORI TOWER PHASE 4
VIKRAM DEVELOPERS AND PROMOTERS
Sai Aura
WJV LANDMARKS LLP
Builder: VISION HOME PROJECT
VISION HOME PROJECT has 1 registration on MahaRERA, including VISION BOULEVARD - Phase II. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VISION BOULEVARD - Phase II is delayed beyond 30 Jun 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VISION BOULEVARD - Phase II?
The registered promoter entity is VISION HOME PROJECT, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VISION BOULEVARD - Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VISION BOULEVARD - Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VISION BOULEVARD - Phase II?
The professionals named in the filing: Architect: VK-A - AR BANDU FUKE / AR TRUPTA JOSHI; Architect: VISHWAS KULKARNI; Engineer: STRUDCON CONSULTANT PVT LTD; Engineer: VISHAL THORAT; Chartered Accountant: CA MAHAVIR CHANODIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VISION BOULEVARD - Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback