Completed No litigation declared Residential / Group Housing project

VISHWARAJ RESIDENCY

By M/S. ANAND DEVELOPERS

RG-MH-26707 · RERA P52100014591 · Last updated on MahaRERA portal: 7 Apr 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 33 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
17 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

VISHWARAJ RESIDENCY is a Residential / Group Housing project by M/S. ANAND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100014591 on 15 Dec 2017. The registration is recorded completed; possession was promised by 31 Mar 2023. The completion date has moved by 33 months from the original filing.

At a glance

Project

  • NameVISHWARAJ RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • GAT NO 1403/ HISSA 12 WAGHOLI
    • NEAR JADE RESIDENCY
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014591
  • ReraGenie IDRG-MH-26707

Builder

  • NameM/S. ANAND DEVELOPERS
  • Entity typePartnership
  • PartnersSANTOSHKUMAR SHIMRATMAL SHINGAVI, AJITKUMAR SHIMRATMAL SHINGAVI, ASHISHKUMAR SANTOSHKUMAR SHINGAVI, SUNILKUMAR SHIMRATMAL SHINGAVI
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredDec 2017First promiseJun 2020Revised toMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Dec 2017
  • Promised completion31 Mar 2023
  • Revised completionRevised to 31 Mar 2023 (originally 29 Jun 2020)
  • Buildings3 building records
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B BUILDINGNA90000
C BUILDINGNA150000
Amenity BuildingNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 7 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

B BUILDING64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C BUILDING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Amenity Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Closed/Covered117
BuildingClosed/CoveredTotal
B BUILDING3535
C BUILDING8181
Amenity Building11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,503 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
CHITRALEKHA JAYKUMAR JADHAVRAOWAGHOLIPune

Approvals and building plan

Permissible FSI5176.41
Proposed, not sanctioned4,513 sq m
Buildings approved3
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIMANNAGAR PUNE 411014

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAGAR MEHTA
EngineerSANTOSH PATIL
PartnerRole in project
M/S. ANAND DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012114Jun 2020 → Mar 2023

Reason as filed by the promoterDear Sir, Since Wagholi was included in PMC ( Pune Municipal Corporation Limits in the month of July 2021, Airport / Aviation NOC had become mandatory which was erstwhile not required under PMDRA, hence PMRDA was not in position to issue full completion certificate for the project, in spite of the project being 100 Percent complete in the month of July 2021, hence PMRDA issued Part Completion certificate for C wing up to 5th Floor for total 30 apartments out of 65 apartments in C-WING on 09/09/2021, post that the file for Airport / Aviation NOC was being inward by us, on 08/10/2021 FOR FINAL O

EXT52100009121Jun 2020 → Dec 2021

Reason as filed by the promoterDear Sir, Due to the Force Majeure and effects of CORONA, payments from flats sold have not yet been received in entirety based on completion stage, also due to CORONA the vendors and contractors have delayed work due to shortage of Labor, the current status of completion is around 93-95% complete, please find enclosed the photos of the site for your kind reference, the extension hereby is being sought since the agreements in pipeline are to be registered, which shall be able in Sub-Registrars office on extension or Completion of Project only as per new norms, the files have already being proc

EXT52100000259Jun 2020 → Jun 2020

Reason as filed by the promoterWe would like to seek project extension due to slowdown in the market, and we are yet to sale any unit in the project, so we would like to extend it as of now, so that we do not end up paying interest because of default, instead we would like to complete the project before extended duration and handover the same to the society / flat owners.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Dec 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Dec 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Mar 2023

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: ArchCertificate (1).pdf7 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B-BUILDING.pdf26 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C -BUILDING.pdf26 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building B Eng Certificate_compressed.pdf26 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building C Eng Certificate_compressed.pdf26 Mar 2023
Certificates of CA (Form 3)File: CA CERTIFICATE FORM 3 - QUARTERLY UPDATE MAHARERA- ANAND DEVELOPERS_compressed.pdf26 Mar 2023
Certificates of CA (Form 3)File: CA CERTIFICATE FORM 3 - QUARTERLY UPDATE MAHARERA- VISHWARAJ LANDOWNER_compressed.pdf26 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form_5_Final_18-19.pdf26 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form_5_Final_19-20.pdf26 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BHOGAWATA PATRA_VISHWARAJ RESIDENCY.pdf26 Mar 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-BOOKED UNITS_Signed_RERA.pdf2 Aug 2022
Disclosure of sold/ booked inventoryFile: Circular28_Consents_Signed_RERA.pdf2 Aug 2022
Certificates of CA (Form 3)File: FORM-3 SCAN.pdf2 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A_2019_2020_Signed.pdf27 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A_2020_2021_Signed.pdf27 Jul 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-BOOKED UNITS_Signed_compressed.pdf27 Jul 2022
Disclosure of sold/ booked inventoryFile: Circular28_Consents_compressed.pdf27 Jul 2022
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 FORMAT ANAND DEVELOPERS.pdf26 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B-BUILDING.pdf24 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C -BUILDING.pdf24 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building B Eng Certificate_compressed.pdf24 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building C Eng Certificate_compressed.pdf24 Jul 2022
Disclosure of sold/ booked inventoryFile: ANAND DEVELOPERS FORMAT B_compressed.pdf24 Jul 2022
Certificates of CA (Form 3)File: From 3 And Annxure scan_compressed.pdf24 Jul 2022
Certificates of CA (Form 5)File: Anand Developers FORM 5 21-22.pdf24 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Anand Developers FORM 5 20-21.pdf24 Jul 2022
Disclosure of sold/ booked inventoryFile: ANAND DEVELOPERS FORMAT B_compressed.pdf7 Jul 2022
Certificates of CA (Form 5)File: FORM_5_ANAND DEVELOPERS.pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE C BUILDING ANAND DEVELOPERS QUARTERLY UPDATE -2 APR 18 TO JUNE 18.pd26 Jun 2018
PAN CardFile: PAN Card.pdf5 Dec 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencemnet Certificate and NA Order_Compressed.pdf5 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B BUILDING_MAHARERA ARCHITECT CERTIFICATE_FINAL.pdf5 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: C BUILDING_MAHARERA ARCHITECT CERTIFICATE_FINAL.pdf5 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - B BUILDING_ANAND DEVELOPERS_VISHWARAJ RESIDENCY_ENGINEER.pdf5 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - C BUILDING_ANAND DEVELOPERS_VISHWARAJ RESIDENCY_ENGINEER.pdf5 Dec 2017
Certificates of CA (Form 3)File: FORM 3_CA CERTIFICATE ANAND DEVELOPERS_PROJECT REGISTRATION.pdf5 Dec 2017
Certificates of CA (Form 3)File: FORM 3_ANNEXURE A_CA CERTIFICATE ANAND DEVELOPERS_PROJECT REGISTRATION.pdf5 Dec 2017
Certificates of CA (Form 3)File: FORM 3_CA CERTIFICATE CHITRALEKHA JADHAVRAO_PROJECT REGISTRATION.pdf5 Dec 2017
Certificates of CA (Form 3)File: FORM 3_ANNEXURE A_CA CERTIFICATE CHITRALEKHA JADHAVRAO_PROJECT REGISTRATION.pdf5 Dec 2017
Proforma of Allotment letterFile: PROFORMA AGREEEMENT_Anand Developers_ Vishwaraj Residency.pdf5 Dec 2017
Layout approvalFile: SANCTION LAYOUT_ANAND DEVELOPERS.pdf4 Dec 2017
Building plan approvalFile: B BUILDING SANCTION PLAN.pdf4 Dec 2017
Building plan approvalFile: C BUILDING SANCTION PLAN.pdf4 Dec 2017
Building plan approvalFile: C BUILDING SANCTION PLAN_DETAIL.pdf4 Dec 2017
Building plan approvalFile: CLUB HOUSE SANCTION PLAN.pdf4 Dec 2017
Copy of the legal title reportFile: Legal Title Report -Search Report - Anand Developers Vishwaraj Residency.PDF4 Dec 2017
Details of encumbrancesFile: Encumbrance Certificate- Anand Developers.PDF4 Dec 2017
Copy of Layout Approval (in case of layout)File: SANCTION LAYOUT_ANAND DEVELOPERS.pdf4 Dec 2017
Building Plan Approval (IOD)File: B BUILDING SANCTION PLAN.pdf4 Dec 2017
Building Plan Approval (IOD)File: C BUILDING SANCTION PLAN.pdf4 Dec 2017
Building Plan Approval (IOD)File: C BUILDING SANCTION PLAN_DETAIL.pdf4 Dec 2017
Building Plan Approval (IOD)File: CLUB HOUSE SANCTION PLAN.pdf4 Dec 2017
Declaration in FORM BFile: Anand Developers Form-B.PDF4 Dec 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 33 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISHWARAJ RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

2 kmVISHWARAJ RESIDENCYCompleted 62Lapsed / revoked 27Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 131 registered projects within 2 km.

Builder: M/S. ANAND DEVELOPERS

M/s. Anand Developers has 3 registrations on MahaRERA, including Rise Alta and VISHWARAJ RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VISHWARAJ RESIDENCY is delayed beyond 31 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHWARAJ RESIDENCY?

The registered promoter entity is M/S. ANAND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHWARAJ RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISHWARAJ RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHWARAJ RESIDENCY?

The professionals named in the filing: Architect: SAGAR MEHTA; Engineer: SANTOSH PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHWARAJ RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHWARAJ RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHWARAJ RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.