Home / Browse projects / Thane, Maharashtra / VISHWAJEET PRECIOUS PHASE I

Completed No litigation declared Residential / Group Housing project

VISHWAJEET PRECIOUS PHASE I

By ABHIJEET PRIDE

RG-MH-03147 · RERA P51700020587 · Last updated on MahaRERA portal: 30 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

VISHWAJEET PRECIOUS PHASE I is a Residential / Group Housing project by ABHIJEET PRIDE in Thane, Maharashtra, registered with MahaRERA as P51700020587 on 26 Apr 2019. The registration is recorded completed; possession was promised by 2 Mar 2025.

At a glance

Project

  • NameVISHWAJEET PRECIOUS PHASE I
  • TypeResidential / Group Housing
  • Location
    • VARAP
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • RERA no.P51700020587
  • ReraGenie IDRG-MH-03147

Builder

  • NameABHIJEET PRIDE
  • Entity typePartnership
  • GSTIN27ABFFA9712M1Z3
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersGULABRAO BABURAO KARANJULE, ABHIJEET GULABRAO KARANJULE, SUNITA GULABRAO KARANJULE, DEEPAK MURLIDHAR MATTA, RAVI BHAJANLAL MATTA, KAILASH SHANKARLAL SONI, KAILASH SHANKARLAL SONI, RAVI BHAJANLAL MATTA, GULABRAO BABURAO KARANJULE, SUNITA GULABRAO KARANJULE, ABHIJEET GULABRAO KARANJULE, DEEPAK MURLIDHAR MATTA and 6 more
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2019PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Apr 2019
  • Promised completion2 Mar 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed101 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 3NA90000
BUILDING NO 4NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,453 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4620.28
Proposed, not sanctioned4,620 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAMBERNATH

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHENDRA SHARMA
EngineerJAI TALREJA
PartnerRole in project
ABHIJEET PRIDE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Nov 2022

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-AP-I.pdf30 Oct 2023
Certificates of CA (Form 3)File: AP-I-FORM -3-30-06-22.pdf14 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM 1-10-06-2022.pdf7 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-AP-1-10-06-22.pdf29 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-AP-1-10-06-22.pdf29 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5-AP-PH-I-21-22.pdf29 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-AP-I -30-06-22.pdf24 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC-AP-I.pdf19 Nov 2022
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4-AP-I.pdf19 Nov 2022
Disclosure of sold/ booked inventoryFile: VPRECIOUS I.pdf14 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-AP-I-31-03-22.pdf28 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-AP-I-31-03-22.pdf23 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-AP-I-31-03-22.pdf23 May 2022
Disclosure of sold/ booked inventoryFile: AP-PHASE I -31-03-22_compressed.pdf4 May 2022
Certificates of CA (Form 3)File: Form 3 1_compressed.pdf4 May 2022
Certificates of CA (Form 3)File: AP-I-FORM-3-31-12-21.pdf27 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM-1-31-12-2021.pdf29 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP-FORM-2-31-12-2021.pdf29 Mar 2022
Disclosure of sold/ booked inventoryFile: Unsold-AP-I-31-12-2021.pdf12 Mar 2022
Disclosure of sold/ booked inventoryFile: Unsold-AP-I-31-12-2021_compressed.pdf12 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: AP-I-FORM-2A-31-12-2021.pdf11 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5.pdf30 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM-1-30-09-2021.pdf25 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP-FORM-2-30-09-2021.pdf25 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AP-FORM 2A-30-09-2021.pdf12 Dec 2021
Certificates of CA (Form 3)File: AP-FORM 3 -30-09-2021.pdf12 Dec 2021
Certificates of CA (Form 3)File: abhijeet pride form3-c.pdf18 Nov 2021
Certificates of CA (Form 3)File: FORM-3 30062021.pdf16 Sep 2021
Disclosure of sold/ booked inventoryFile: AP-UNSOLD LIST-31-03-2021.pdf1 Sep 2021
Certificates of CA (Form 3)File: FORM 3 31032021.pdf31 Aug 2021
Certificates of CA (Form 3)File: form 3 30062021.pdf31 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM-1-30-06-2021.pdf20 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP-FORM-2-30-06-2021.pdf20 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: AP-FORM-2A-30-06-2021.pdf20 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM-1-30-06-2021.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP-FORM-2-30-06-2021-compressed.pdf14 Aug 2021
Declaration about Commencement CertificateFile: AP-PHASE I-FORM D.pdf13 Aug 2021
Certificates of CA (Form 3)File: ABHIJEET PRIDE FORM 3 31-03-2021.pdf12 Aug 2021
Certificates of CA (Form 3)File: ABHIJEET PRIDE FORM 3 31-03-2021.pdf12 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM-1-31-03-2021.pdf12 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM-1-31-03-2021.pdf12 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP-FORM-2-31-03-2021.pdf12 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP-FORM-2-31-03-2021.pdf12 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AP-FORM 2A-31-03-2021.pdf12 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AP-FORM 2A-31-03-2021.pdf12 Jun 2021
Certificates of CA (Form 3)File: AP-FORM 3 -31-03-2021.pdf12 Jun 2021
Certificates of CA (Form 3)File: AP-FORM 3 -31-03-2021.pdf12 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: AP.pdf14 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 DEC 2020.pdf5 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 DEC 2020.pdf5 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AP 31ST DEC 2020.pdf26 Mar 2021
Certificates of CA (Form 3)File: AP 31 DEC 2020.pdf26 Mar 2021
Certificates of CA (Form 3)File: AP 31 DEC 2020.pdf26 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM 1-30-06-2020.pdf12 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM 1-31-03-2020.pdf12 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM 1-30-09-2020.pdf12 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM 1-31-12-2019_compressed.pdf12 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP-FORM 1-30-06-2019_compressed.pdf12 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP-FORM 2-30-06-2020.pdf12 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP-FORM 2-30-09-2020.pdf12 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP-FORM 2-31-03-2020.pdf12 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP FORM 2-31-12-2019_compressed (1).pdf12 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AP-FORM 2A-31-12-2019.pdf12 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AP-FORM 2A-31-03-2020.pdf12 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AP-FORM 2A-30-06-2020.pdf12 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AP-FORM 2A-30-09-2020.pdf12 Nov 2020
Certificates of CA (Form 3)File: AP-FORM 3-31-12-2019.pdf12 Nov 2020
Certificates of CA (Form 3)File: AP-FORM 3-31-03-2020.pdf12 Nov 2020
Certificates of CA (Form 3)File: AB-FORM 3-30-06-2020_compressed.pdf12 Nov 2020
Certificates of CA (Form 3)File: AB-FORM 3-30-09-2020_compressed.pdf12 Nov 2020
Certificates of CA (Form 3)File: AB-FORM 3-30-09-2020_compressed.pdf12 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP Form I June_compressed.pdf22 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AP Form I Sep_compressed.pdf22 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP Form II June_compressed.pdf22 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AP Form II Sep_compressed.pdf22 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM2A June.pdf22 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM2A Sep.pdf22 Feb 2020
Certificates of CA (Form 3)File: FORM 3 June 19.pdf22 Feb 2020
Certificates of CA (Form 3)File: FORM 3 Sep 19.pdf22 Feb 2020
Proforma of Allotment letterFile: Rera Draft Agreement Revised.pdf30 Dec 2019

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
VISHWAJEET PRECIOUS PHASE IIP51700030793TALUKA KALYAN, ThaneSep 2021CompletedMay 2026Feb 2024
VISHWAJEET PRECIOUS PHASE IIIP51700031318VARAP, ThaneOct 2021CompletedMar 2024Feb 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VISHWAJEET PRECIOUS PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VARAP7,600+ in Thane

Builder: ABHIJEET PRIDE

ABHIJEET PRIDE has 4 registrations on MahaRERA, including VISHWAJEET PRECIOUS PHASE I and VISHWAJEET PRECIOUS PHASE II. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VISHWAJEET PRECIOUS PHASE I is delayed beyond 2 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VISHWAJEET PRECIOUS PHASE I?

The registered promoter entity is ABHIJEET PRIDE, a partnership as per the filing. Its GSTIN 27ABFFA9712M1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VISHWAJEET PRECIOUS PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VISHWAJEET PRECIOUS PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VISHWAJEET PRECIOUS PHASE I?

The professionals named in the filing: Architect: MAHENDRA SHARMA; Engineer: JAI TALREJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VISHWAJEET PRECIOUS PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VISHWAJEET PRECIOUS PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VISHWAJEET PRECIOUS PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.