Registered No litigation declared Residential / Group Housing project

PODDAR RIVIERA PHASE - III

By Poddar Housing and Development Limited

RG-MH-21726 · RERA P51700023296 · Last updated on MahaRERA portal: 28 Apr 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 21 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 21 months from the original
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
622 of 675Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

PODDAR RIVIERA PHASE - III is a Residential / Group Housing project by Poddar Housing and Development Limited in Thane, Maharashtra, registered with MahaRERA as P51700023296 on 9 Dec 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 21 months from the original filing. 53 of the 675 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePODDAR RIVIERA PHASE - III
  • TypeResidential / Group Housing
  • Location
    • KALYAN MURBAD ROAD
    • MHARAL
    • Mharal Kh. (N.V)
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700023296
  • ReraGenie IDRG-MH-21726

Builder

  • NamePoddar Housing and Development Limited
  • Entity typeCompany
  • ChairpersonDipak Kumar Poddar
  • Managing DirectorRohitashwa Poddar
  • Other registrations12 more →
  • Completed2 of 13
  • No longer live9 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

this monthRegisteredDec 2019First promiseMar 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Dec 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Mar 2025)
  • Buildings3 building records
  • Documents filed100 files

Current status

8%53 of 675 units booked

Figures as on 28 Apr 2023, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B7NA25232250225
B8NA25232250225
B9NA25232250225

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

B70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities25

As on 28 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Club Gym, Open crècheYes0%
Indoor games Pool, Table tennis, Chess, CaromYes0%
Banquet, Party LawnYes0%
Swimming pool Adult pool, Kids pool, JacuzziYes0%
Kids play area, Barbeque areaYes0%
Multipurpose ground, Tennis court, Cricket pitchYes0%
Senior citizens’ corner, Jogging / walking trackYes0%
Fishing, Amphitheatre, Outdoor organic farm patchYes0%
Open air gym, Giant Jenga, Giant chess play areaYes0%
Terrace party area on clubYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,120 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI32790.0
Proposed, not sanctioned32,790 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAMALA MILLS COMPOUND, SENAPATI BAPAT MARG LOWER PAREL, MUMBAI - 400013

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHITECT HAFEEZ CONTRACTOR
Architectubarchitects
EngineerChetan Kubal
Chartered AccountantBansal Bansal & Company
Chartered AccountantM. S. Bajaj & Co.
Chartered AccountantV A SHIMPI & ASSOCIATES
PartnerRole in project
Poddar Housing and Development Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700011264Mar 2025 → Dec 2026

Reason as filed by the promoterDear Sir, We write in reference to our ongoing real estate project “Poddar Wondercity Phase III” with MahaRERA under registration number P51700023296 registration valid till 30-Mar-2025. Kindly note that till date construction of the said Real Estate Project has not started (a) Revised layout approval from ADTP vide reference no. 2833 dated 31-Dec-2021 (attached as Annexure B) (b) The Completion date of the Real Estate Project to be revised to 31-December-2026. (c) Building No.3 consisting Wing B4 and Wing B5, further added one Wing and now the revised Building No.3 consisting Wing B7, B8 and

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000408555Manish Vinodrai MehtaPoddar Housing and Development Ltd.19/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase III - FORM 1 - ARCHITECT'S CERTIFICATE 30-9-22.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase III - FORM 1 - ARCHITECT'S CERTIFICATE 31-12-22.pdf28 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase III - FORM 1 - ARCHITECT'S CERTIFICATE 31-3-23.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engin Riviera III Sept 22.pdf28 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Rivera PH III 22-23.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA Sept 22 Phase III.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Riviera PH III Form V 2021-22.pdf13 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera III Engineer June 22.PDF13 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineer Certificate_Riviera Phase-III_June 22.pdf22 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Riviera Phase-III_June 22.pdf22 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA June 22 Phase III.pdf22 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera PH III Mar 22.pdf8 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera PH III June 22.pdf8 Aug 2022
Proforma of Allotment letterFile: Draft Sale Agreement B7,B8 and B9.pdf4 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form_1_RERA_Certificates_Architect completion_signed_Architect Letter head.pdf11 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form_2A_Poddar Riviera_III_Form_2A Quality of work_letter head.pdf11 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Poddar Riviera_III_Form_3A_CA certificate_Cost Incurred_CA letter head.pdf11 Apr 2022
Declaration about Commencement CertificateFile: Circular 32_Final_signed.pdf6 Apr 2022
Layout approvalFile: 1 Copy of Layout_RERA_Mharal Layout.pdf1 Apr 2022
Building plan approvalFile: 2 Building Plan Approval_NA order_RERA_Mharal_Collector order for Building permission.pdf1 Apr 2022
Building plan approvalFile: 3 RERA_23_Gr, Typ B7,B8,B9.pdf1 Apr 2022
Building plan approvalFile: 4 RERA_24_Refuge B7,B8,B9.pdf1 Apr 2022
Building plan approvalFile: 5 RERA_25_Section B7,B8,B9.pdf1 Apr 2022
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout_RERA_Mharal Layout.pdf1 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval_NA order_RERA_Mharal_Collector order for Building permission.pdf1 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 3 RERA_23_Gr, Typ B7,B8,B9.pdf1 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 4 RERA_24_Refuge B7,B8,B9.pdf1 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 5 RERA_25_Section B7,B8,B9.pdf1 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: 6 CC_NA order_RERA_Mharal_Collector order for Building permission.pdf1 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase III - FORM 1 - ARCHITECT'S CERTIFICATE 30-12-2021 (1).pdf1 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1021_220401160347_001.pdf1 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 RERA_Poddar Riviera_III_Form_2_Cost Incurred_signed.pdf1 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Riviera PH III Qualtity.pdf1 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 10 RERA_Poddar Riviera_III_Form_2A Quality of work_signed.pdf1 Apr 2022
CERSAI detailsFile: RERA_CERSAI_Mharal_100 Cr_VISTRA.pdf1 Apr 2022
CERSAI detailsFile: RERA_CERSAI_Mharal_50 Cr_VISTRA.pdf1 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera RERA PH III Dec21.pdf1 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 RERA_Poddar Riviera_III_Form_3A_CA certificate_Cost Incurred_signed.pdf1 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase III - FORM 1 - ARCHITECT'S CERTIFICATE 30-06-2021 (2).pdf7 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase III - FORM 1 - ARCHITECT'S CERTIFICATE 30-09-2021 (1).pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera Phase III.pdf7 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 0285_220104182309_001.pdf5 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 0295_220105165057_001.pdf5 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Riviera PH III RERA Sept 2021.pdf5 Jan 2022
Layout approvalFile: Poddar Riviera_Layout_Phase_III_highlighted_Compressed_1MB.pdf4 Jan 2022
Building plan approvalFile: Poddar Riviera_Layout_Phase_III_highlighted_Compressed_1MB.pdf4 Jan 2022
Copy of Layout Approval (in case of layout)File: Poddar Riviera_Layout_Phase_III_highlighted_Compressed_1MB.pdf4 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: Poddar Riviera_Layout_Phase_III_highlighted_Compressed_1MB.pdf4 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate_PHASE - III.pdf4 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera Mharal Phase III - FORM 1 - ARCHITECT'S CERTIFICATE 30-06-2021 (1) (1).pdf4 Jan 2022
OtherFile: Application_.pdf4 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 10 14 PG PHDL RIVIERA RERA JUNE 2021 PHASE III.pdf9 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Rivera III_Compressed.pdf28 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase III - FORM 1 - ARCHITECT'S CERTIFICATE 31-03-2021.pdf14 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form-2_Engineers Certificate_Poddar Riviera - III_Mar-21.pdf14 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Poddar Riviera Phase_III_Form 2A Quality Mar-21.pdf14 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 07 13 PG PHDL RIVIERA PH III RERA MARCH 2021.pdf14 Jul 2021
Layout approvalFile: Layout Approval.pdf23 Mar 2021
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf23 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera - Phase 3-compressed.pdf4 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality certificate - all RERA project - PHDL-10 - Riv 2.pdf4 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality certificate - all RERA project - PHDL-11 - Riv 3.pdf4 Mar 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHDL Riviera Ph III FORM3.pdf3 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase III - FORM 1 - ARCHITECT'S CERTIFICATE 31-12-2020-compressed.pdf2 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Mharal Phase III.pdf4 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Riviera Ph3.pdf4 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rivera Ph3.pdf4 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVIERA PHASE III SEPT.pdf4 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Poddar Riviera PH-II Form 2 A_Certificate_March-20 ending.pdf7 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Poddar Riviera PH-III Form 2 A_Certificate_March-20 ending.pdf7 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ph 3 uploaded.pdf7 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rivera Ph 3.pdf1 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rivera Ph3.pdf1 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2020 09 15 PHDL RIVIERA RERA JUNE 2020 PHASE III DS.pdf1 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Riviera Ph III.pdf30 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rivera Ph III.pdf30 Sep 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2020 09 08 PHDL RIVIERA RERA MARCH 2020 PHASE III DS.pdf30 Sep 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Certificate Riveria Phase 3-min.pdf30 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Poddar Riviera PH-III Form 2 A_Certificate_March-20 ending.pdf17 Aug 2020
Details of Restarting of Construction work post lockdownFile: PODDAR RIVIERA PHASE - III.pdf26 Jun 2020

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise1 delivered late2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PODDAR RIVIERA PHASE - IP51700023508MHARAL, Thane720Dec 2019OngoingSep 2025Not delivered
PODDAR WONDERCITY PHASE - IIP51700020028JOVELI VILLAGE, Thane-Mar 2019Certificate SignedJun 2022Not delivered
SAMRUDDHI EVERGREENS-PHASE-4BBADLAPUR178-CompletedMar 2019Aug 2018
SAMRUDDHI EVERGREENS-PHASE-4ABADLAPUR160-CompletedMar 2018Mar 2018
PODDAR EVERGREEN PHASE 3BADLAPUR796-CompletedDec 2015Late, Mar 2016
PODDAR BRIO INTERNATIONAL SCHOOLBADLAPUR--CompletedAug 2015Aug 2015
CENTRAL HOSPITALBADLAPUR--CompletedMar 2015Mar 2015
PODDAR EVERGREEN PHASE 2BADLAPUR672-CompletedDec 2014Dec 2014
SAMRUDDHI COMPLEXBHIVPURI KARJAT1,264-CompletedApr 2014Apr 2014
SAMRUDDHI COMMERCIAL COMPLEXBHIVPURI KARJAT45-CompletedApr 2014Apr 2014
PODDAR EVERGREEN PHASE 1BADLAPUR516-CompletedAug 2013Aug 2013

How this compares with Thane

8%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 21 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PODDAR RIVIERA PHASE - III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MHARAL7,600+ in Thane

2 kmPODDAR RIVIERA PHASE - ICompleted 14Lapsed / revoked 5Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: Poddar Housing and Development Limited

Poddar Housing and Development Limited has 13 registrations on MahaRERA, including PODDAR SPRAHA DIAMOND PHASE-I and SAMRUDDHI EVERGREENS-PHASE-4A. Its filings disclose 11 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PODDAR RIVIERA PHASE - III is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PODDAR RIVIERA PHASE - III?

The registered promoter entity is Poddar Housing and Development Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PODDAR RIVIERA PHASE - III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PODDAR RIVIERA PHASE - III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PODDAR RIVIERA PHASE - III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PODDAR RIVIERA PHASE - III?

The professionals named in the filing: Architect: ARCHITECT HAFEEZ CONTRACTOR; Architect: ubarchitects; Engineer: Chetan Kubal; Chartered Accountant: Bansal Bansal & Company; Chartered Accountant: M. S. Bajaj & Co.; Chartered Accountant: V A SHIMPI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PODDAR RIVIERA PHASE - III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PODDAR RIVIERA PHASE - III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PODDAR RIVIERA PHASE - III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.