ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / THARWANI PARKGLEN PHASE I

Registered No litigation declared Mixed project

THARWANI PARKGLEN PHASE I

RG-MH-42778 · RERA PM1331012601760 · Last updated on MahaRERA portal: 25 Aug 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • All 3 earlier projects delivered on promise
Jump to the 4 documents Report an error

THARWANI PARKGLEN PHASE I is a Mixed project by THARWANI REALTORS in Thane, Maharashtra, registered with MahaRERA as PM1331012601760 on 3 Sep 2026. Possession is promised by 30 Jun 2031.

At a glance

Project

  • NameTHARWANI PARKGLEN PHASE I
  • TypeMixed
  • Location
    • SURVEY NO.22/1/B
    • 20/1/A
    • 22/1/3
    • 22/1/D
    • 22/1/7/2A
    • 22/1/E
    • KOLIVALI
    • MOUJE
    • kolivali
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1331012601760
  • ReraGenie IDRG-MH-42778

Builder

  • NameTHARWANI REALTORS
  • Entity typePartnership
  • GSTIN 27AAJFT0677P1ZE
  • Track record7 past projects →

Key dates

todayRegisteredSep 2026PromisedJun 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Sep 2026
  • Promised completion30 Jun 2031
  • Revised completionNone
  • Buildings9 building records
  • Documents filed4 files

Current status

0%0 of 505 units booked

Figures as on 25 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA1817602787
BUILDING CNA4342630
BUILDING DNA292834927376
BUILDING ENA22202
BUILDING FNA22202
BUILDING GNA22202
ROW HOUSE A1NA11202
ROW HOUSE 11NA22202
ROW HOUSE 12NA22202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 25 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing.

BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING E0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING F0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING G0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE A10%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE 110%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE 120%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed685

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots685
Closed/Covered685
BuildingClosed/CoveredTotal
BUILDING A112112
BUILDING C5151
BUILDING D522522

Land and ownership178

MahaRERA does not publish landowner contact details.

Land area21,042 sq m
Promoter owns the landNo
Named landowners178
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 May 2026
LandownerVillageDistrict
SHWETA SANJAY KANKOSHE PROP VAIBHAVI DEVELOPERSMajiwadeThane
SANJAY SHANTARAM KANKOSHE PROP VAISHNAVI DEVELOPERSMajiwadeThane
RADMIN DEVELOPERS AND CONSULTANTS PVT LTDdhokaliThane
SANJAY CONSTRUCTIONSBaraveThane
Ram Gangaram Lokhande-Thane
Rohidas Kashinath Karbhari-Thane
Nitin Kashinath Karbhari-Thane
Datta Lakshman Lokhande-Thane
Vijaya Santosh Mhatre-Thane
Vandana Suresh Mhatre-Thane
Jayshree alias Jayabaee Chandrakant Karbhari-Thane
Hemangi Vishal Karbhari-Thane
Sandhya Ajit Karbhari-Thane
Ajit Baliram Karbhari-Thane
Nikesh Jeevan Karbhari-Thane
Nikita Jeevan Karbhari-Thane
Vandana Jeevan Karbhari-Thane
Jeevan Waman Karbhari-Thane
Vighnesh Vishwas Karbhari-Thane
Ganesh Vishwas Karbhari-Thane
Nilam Vishwas Karbhari-Thane
Vishwas Waman Karbhari-Thane
Jitesh Sharad Karbhari-Thane
Lavanya Sharad Karbhari-Thane
Manisha Sharad Karbhari-Thane
Sharad Waman Karbhari-Thane
Dailesh Rajendra Karbhari-Thane
Dipesh Rajendra Karbhari-Thane
Mamta Rajendra Karbhari-Thane
Ramdas Sukir Lokhande-Thane
Ramesh Balkrushna Lokhande-Thane
Suryakant Gajanan Lokhande-Thane
Ravindra alias Ravikant Pandurang Lokhande-Thane
Mukund Pundhalik Lokhande-Thane
Kishore Rajaram Lokhande-Thane
Sumanbai Laxman Bhoir-Thane
Pandit Lakshman Bhoir-Thane
Motiram Pandurang Patil-Thane
Dasharath Pandurang Patil-Thane
Rajendra Waman Karbhari-Thane
Nandkumar Ashok Karbhari-Thane
Vivek Ashok Karbhari-Thane
Kavita Hemant Kene-Thane
Gita Sudesh Patil-Thane
Laxmi Ashok Karbhari-Thane
Ashok Waman Karbhari-Thane
Droupadi Pandurang Patil-Thane
Kantabai Ashok Patil-Thane
Lalita Ashok Patil-Thane
Anita Varad Bhoir-Thane
Manisha Sushant Patil-Thane
Prasad Ashok Patil-Thane
Nakul Waman Lokhande-Thane
Fasubai Nakul Lokhande-Thane
Nita Sharad Bhoir-Thane
Anjanabai Govind Patil-Thane
Shobha Madan Patil-Thane
Darshana Vasudev Choudhari-Thane
Droupadibai Kundlik Lokhande-Thane
Lalita Vinayak Daki-Thane
Barkubai Mukund Lokhande-Thane
Subhash Kundlik Lokhande-Thane
Manjula Subhash Lokhande-Thane
Hiralal Kundlik Lokhande-Thane
Naresh Dilip Karbhari-Thane
Shakuntala Chandrakant Karbhari-Thane
Vamala Shivaji Patil-Thane
Bebibai Kathod Madhavi-Thane
Alka Ganesh Kapse-Thane
Lakshman Dadaji Lokhande-Thane
Surekha Datta Lokhande-Thane
Meena Lakshman Lokhande-Thane
Janta Dilip Karbhari-Thane
Dilip Waman Karbhari-Thane
Gulab Manik Pawas-Thane
Rohini Manik Choudhary-Thane
Bebi Jandey Fulore-Thane
Jay Gurunath Karbhari-Thane
Suman Rajaram Bhoir-Thane
Sita Bai Lakshman Kadu-Thane
Ranjana Navnath Patil-Thane
Sukir Dadaji Lokhande-Thane
Gadhubai Sukir Lokhande-Thane
Parvatibai Sukir Lokhande-Thane
Hira Ramdas Lokhande-Thane
Jayashree Ramdas Lokhande-Thane
Nilesh Ramdas Lokhande-Thane
Vikas Sukir Lokhande-Thane
Sandip Sukir Lokhande-Thane
Manish Gurunath Karbhari-Thane
Sulochana Gorkhanath Bhoir-Thane
Vandana Praful Mhatre-Thane
Aasha Subhash Karbhari-Thane
Balkrushana Dadaji Lokhande-Thane
Taibai Balkrushana Lokhande-Thane
Ganesh Balkrushana Lokhande-Thane
Dinesh Balkrushana Lokhande-Thane
Sunita Gurunath Karbhari-Thane
Vanita Balkrushana Lokhande-Thane
Shantabai Dinesh Mhaske-Thane
Gangaram Dadaji Lokhande-Thane
Lilabai Gangaram Lokhande-Thane
Shyam Gangaram Lokhande-Thane
Vaishali Shyam Lokhande-Thane
Bharti Ram Lokhande-Thane
Sunil Gangaram Lokhande-Thane
Usha Naresh Lokhande-Thane
Rajaram Dadaji Lokhande-Thane
Manubai Rajaram Lokhande-Thane
Prakash Rajaram Lokhande-Thane
Rohidas Rajaram Lokhande-Thane
Vilas Rajaram Lokhande-Thane
Sharad Rajaram Lokhande-Thane
Suvarna Mahesh Patil-Thane
Rekha Pandurang Lokhande-Thane
Pratibha Sunil Waghmare-Thane
Gajanan Dadaji Lokhande-Thane
Droupadabai Gajanan Lokhande-Thane
Archana Manohar Dudhkhar-Thane
Shardabai Pramod Madhavi-Thane
Pandurang Dadaji Lokhande-Thane
Gourubai Pandurang Lokhande-Thane
Jignu Pandurang Lokhande-Thane
Gangu Pandurang Lokhande-Thane
Gita Gurunath Lokhande-Thane
Sangita Fulaji Wakade-Thane
Ragho Undrya Karbhari-Thane
Manubai Ragho Karbhari-Thane
Vinod Ragho Karbhari-Thane
Sudhakar Ragho Karbhari-Thane
Kavita Ragho Karbhari alias Kavita Sambhaji Choudhari-Thane
Barkubai Ramesh Karbhari-Thane
Shivaji Ramesh Karbhari-Thane
Hanuman Ramesh Karbhari-Thane
Savita Ramesh Karbhari alias Savita Vijay Patil-Thane
Anita Ramesh Karbhari alias Anita Vasant Bhandari-Thane
Rakhamabai Pandit Karbhari-Thane
Rajesh Pandit Karbhari-Thane
Kishore Pandit Karbhari-Thane
Suvarna Pandit Karbhari alias Suvarna Hanuman Barshi-Thane
Pushpa Suresh Karbhari-Thane
Ishwer Suresh Karbhari-Thane
Pratiksha Ishwer Karbhari-Thane
Manoj Suresh Karbhari-Thane
Urmila Mukesh Patil-Thane
Prakash Nana Karbhari-Thane
Sugandha Prakash Karbhari-Thane
Punam Mohan Kene-Thane
Gurunath Nana Karbhari-Thane
Shobha Laxman Patil/Gode-Thane
Sanju Gajanan Lokhande-Thane
Suvarna Chetan Shelar-Thane
Tejas Mohan Bhandari-Thane
Vickey Mohan Bhandari-Thane
Priyanka Prakash Karbhari for self and natural guardian through Prakash Nana Karbhari-Thane
Prathmesh Prakash karbhari for self and natural guardian through Prakash Nana Karbhari-Thane
Dikshit Prakash Karbhari for self and natural guardian through Prakash Nana Karbhari-Thane
Aarti Somnath Patil-Thane
Yash Ajit Karbhari for self and natural guardian through Ajit Baliram Karbhari-Thane
Harsh Ajit Karbhari for self and natural guardian through Ajit Baliram Karbhari-Thane
Sandhya Ajit Karbhari for self and natural guardian through Ajit Baliram Karbhari-Thane
Dhananjay Vishal Karbhari for self and natural guardian through Hemangi Vishal Karbhari-Thane
Vaishnavi Vishal Karbhari for self and natural guardian through Hemangi Vishal Karbhari-Thane
Raghubai Kundalik Karbhari-Thane
Droupadibai Nana Karbhari-Thane
Pranita Dilip Karbhari-Thane
Anita Bajrang Mahale-Thane
Vanita Subhash Bhoir-Thane
Suresh Tulshiram Gaikar-Thane
Harishchandra Tulshiram Gaikar-Thane
Sunil Tulshiram Gaikar-Thane
Nitin Rajaram Bhoir-Thane
Samadhan Rajaram Bhoir-Thane
Kavita Janardan Mhatre-Thane
Savita Madhukar Meher-Thane
Avita Vasant Bhandari-Thane
Devyani Ramesh Karbhari-Thane
Aryan Gurunath Karbhari-Thane

Approvals and building plan

Permissible FSI32727.84
Proposed, not sanctioned31,436 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA.

Separate project accountDeclared
Bank branchSHOP NO 3,NEERAJ PARK,  NR MOHAN PRIDE, KALYAN WEST,MUMBAI           

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVITAN CONSULTANTS
EngineerASSOCIATED STRUCTURAL ENGINEERS LLP
Chartered AccountantVINOD SANTOSHKUMAR Dhankani
Chartered AccountantSUNNY GOPICHAND BHAGIA
PartnerRole in project
THARWANI REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

Documents filed4

As listed on the registration. The files themselves are on the MahaRERA portal.

DocumentUploaded
Revised Annexure A - Order No 5025 Aug 2026
Sanction Plan pages 1 to 326 Jun 2026
Sanction Plan pages 4 to 626 Jun 2026
Sanction Plan pages 7 to 926 Jun 2026

Promoter's earlier projects3

As disclosed by the promoter in this filing.

3 delivered on promise
ProjectStatusPromisedDeliveredLitigation
THARWANI MILLENNIUM CITY PHASE ICompletedJul 2023Aug 2022No
THARWANI MILLENNIUM CITY PHASE IICompletedJun 2025Mar 2025No
THARWANI MILLENNIUM ARCADECompletedApr 2025Jan 2025No

How this compares with Thane

0%of this project is bookeddistrict median 27%
23%of Thane projects moved their completion datethis one has not
24%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,576 Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THARWANI PARKGLEN PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUJE7,576 in Thane

Builder: THARWANI REALTORS

THARWANI REALTORS has 7 registrations on MahaRERA, including THARWANI MILLENNIUM CITY PHASE I and THARWANI MILLENNIUM CITY PHASE II. Its filings disclose 7 earlier MahaRERA projects: 6 of 7 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if THARWANI PARKGLEN PHASE I is delayed beyond 30 Jun 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THARWANI PARKGLEN PHASE I?

The registered promoter entity is THARWANI REALTORS, a partnership as per the filing. Its GSTIN 27AAJFT0677P1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THARWANI PARKGLEN PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THARWANI PARKGLEN PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THARWANI PARKGLEN PHASE I?

The professionals named in the filing: Architect: VITAN CONSULTANTS; Engineer: ASSOCIATED STRUCTURAL ENGINEERS LLP; Chartered Accountant: VINOD SANTOSHKUMAR Dhankani; Chartered Accountant: SUNNY GOPICHAND BHAGIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THARWANI PARKGLEN PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Planning to buy here? The Rs 499 buyer report adds red flags, the progress-versus-promise read, this promoter's other registrations and what the filed documents say, plus a ZIP of every document on the filing. It includes the Rs 299 project watch free for 90 days: an email in plain words every time this project's filing changes. See a real sample report before you buy. Get the buyer report · Rs 499
Studying this micro-market? The developer project analysis maps every registration within 5 km of this project from filed coordinates, reads what the market absorbs and what competes, prices the parcel, and takes the promoter's whole book apart, facts with their N, never a verdict. See a complete sample first. Get the developer analysis · Rs 2,999

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THARWANI PARKGLEN PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TULJAI TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.