VINAYAK PRERANA

By NAKSHATRA GROUP

RG-MH-06736 · RERA P51700053644 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
5 of 11Construction stages donefurthest along: Internal walls, 70%
36 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

VINAYAK PRERANA is a Residential / Group Housing project by NAKSHATRA GROUP in Thane, Maharashtra, registered with MahaRERA as P51700053644 on 21 Nov 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 20 of the 56 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameVINAYAK PRERANA
  • TypeResidential / Group Housing
  • Location
    • KHAMBALPADA
    • DOMBIVLI KALYAN ROAD
    • KANCHANGAON
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700053644
  • ReraGenie IDRG-MH-06736

Builder

  • NameNAKSHATRA GROUP
  • Entity typePartnership
  • PartnersVIPUL DUNGARSHI MALDE, JITENDRA BALKRISHNA BHOIR, MOHIT PRAKASH BHOIR, JEET SHIRISH SHETHIA, CHETAN DUNGARSHI MALDE

Key dates

1 months past promisethis monthRegisteredNov 2023PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Nov 2023
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

36%20 of 56 units booked
49.4%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VINAYAK PRERANANA8856056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

VINAYAK PRERANA: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered46

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area984 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 May 2026
LandownerVillageDistrict
VINAYAK PRERNA CO-OPHSG SOCIETY LTDKalyan-Dombivali (M Corp.)Thane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI3907.41
Proposed, not sanctioned3,795 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAXIS BANK LTD BHASKARA SURVEY NO 20 and 26 YOGVAIBHAV CO OP SOCIETY KATRAP ROAD BADLAPUR 421503
Estimated costRs 12.45 cr
Cost incurredRs 6.15 cr
Work done49.42%
BuildingWingEstimatedIncurred
VINAYAK PRERANANARs 11.19 crRs 6.15 cr
-NARs 1.26 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHANASHRI R BHOSALE R BHOSALE
EngineerAMODH MADHAV LUMAN MADHAV LUMAN
EngineerRAKESH SHARAD PATIL
Chartered AccountantLALIT M SHARMA M SHARMA
PartnerRole in project
NAKSHATRA GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Nakshatra Group Architect Certificate Dt - 08-10-2025.pdf13 May 2026
Withdrawal Update Form 1File: Nakshatra Group Architect Certificate Dt - 10-01-2026.pdf13 May 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate Nakshatra Group Dt-11-10-2025.pdf13 May 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate Nakshatra Group Dt-15-01-2026.pdf13 May 2026
Withdrawal Update Form 3File: FORM-3NAKSHATRA GROUP 30092025.pdf13 May 2026
Withdrawal Update Form 3File: Form-3 Nakshatra Group 31122025.pdf13 May 2026
Form 1File: FORM - 1 Architect certificate _Nakshatra Group.pdf24 Jul 2025
Form 2File: Nakshatra Group _Engineering Certificate.pdf24 Jul 2025
Form 3File: Nakshatra Group Form - 3.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Nakshatra Group Disclosure.pdf24 Jul 2025
Self-declaration of Quarterly ProgressFile: NakshatrabGroup Declaration.pdf24 Jul 2025
Form 2A (FY 2024-2025)File: FROM 2A QUALITY ASSURANCE CERTIFICATE NAKSHATRA GROUP.pdf24 Jul 2025
Form 1File: NAKSHATRA GROUP ARCHITECT CERTIFICATE.pdf31 May 2025
Form 2File: NAKSHATRA GROUP RCC ENGINEERING CERTIFICATE.pdf31 May 2025
Form 3File: Nakshatra Group FORM 3.pdf31 May 2025
Disclosure of Sold and Booked InventoryFile: NAKSHATRA GROUP BOOKING.pdf31 May 2025
Self-declaration of Quarterly ProgressFile: NAKSHATRA GROUP DECLARATION.pdf31 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 05-01-2024.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 06-04-2024.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 10-07-2024.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 04-10-2024.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Firm-1 Q3 OF 24-25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- DEC-24.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2-31122023.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 31032024.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 30062024.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2- 31092024.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2-31122024.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1Q3-2324.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1Q4-2324.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1Q1-2425.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1Q2-2425.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-DEC23.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-MAR24.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-JUNE24.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-SEP24.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form -2 , 31th December 2023.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form -2 Dt 31 March 2024.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form -2 Dt 30th June 2024.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form -2 Dt 30th September 2024.pdf25 Mar 2025
Other - TechnicalFile: SS KDMC TO RERA.pdf25 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate FORM2A-23-24.pdf25 Mar 2025
Layout approvalFile: BLUEPRINT OF VINAYAKPRERNA -FULL CC_11zon.pdf13 Mar 2025
Building plan approvalFile: BLUEPRINT OF VINAYAKPRERNA -FULL CC_11zon.pdf13 Mar 2025
Copy of Layout Approval (in case of layout)File: BLUEPRINT OF VINAYAKPRERNA -FULL CC_11zon.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- NAKSHATRA GROUP.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCC Consultant-Form 2.pdf13 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: SANCTION ORDER-FULL CC.pdf13 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: BLUEPRINT OF VINAYAKPRERNA -FULL CC_11zon.pdf13 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Vinayak Prerana.pdf13 Mar 2025
Declaration about Commencement CertificateFile: Declaration - Commencement cert.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Nakshatra Group-23-24.pdf13 Mar 2025
Declaration in FORM BFile: Form B -PROMOTER AFDVT.pdf4 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE-A-DISCLOSOURE OF INT.pdf27 Oct 2023
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER.pdf27 Oct 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION SALE AGREEMENT.pdf27 Oct 2023
Details of encumbrances concerned to FinanceFile: DECLARATION ENCUMBRANCES.pdf10 Oct 2023
Details of encumbrances concerned to FinanceFile: DECLARATION NO ENCUMBRANCE ON RERA ACC.pdf10 Oct 2023
Details of encumbrances concerned to LegalFile: DECLARATION ENCUMBRANCES.pdf10 Oct 2023
Details of encumbrances concerned to LegalFile: DECLARATION NO ENCUMBRANCE ON RERA ACC.pdf10 Oct 2023
CERSAI detailsFile: CERSAI DECLARATION.pdf10 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION NO ENCUMBRANCE ON RERA ACC.pdf4 Oct 2023
Layout approvalFile: Blue Print of Vinayak Prerana Soc_1 of 2.pdf3 Oct 2023
Building plan approvalFile: Blue Print of Vinayak Prerana Soc_1 of 2.pdf3 Oct 2023
Building plan approvalFile: Blue Print of Vinayak Prerana Soc_2 of 2.pdf3 Oct 2023
PAN CardFile: PAN CARD.pdf3 Oct 2023
Copy of the legal title reportFile: Title Report of Vinayak Prerana.pdf3 Oct 2023
Copy of Layout Approval (in case of layout)File: Blue Print of Vinayak Prerana Soc_1 of 2.pdf3 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Blue Print of Vinayak Prerana Soc_1 of 2.pdf3 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Blue Print of Vinayak Prerana Soc_2 of 2.pdf3 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE SANCTION.pdf3 Oct 2023
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate .pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate of Rera.pdf3 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCC RERA CERTIFICATE .pdf3 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3 FINAL.pdf3 Oct 2023
Proforma of Agreement for saleFile: SALE AGREEMENT VINAYAK PRERANA RERA FORMAT.pdf3 Oct 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf3 Oct 2023

How this compares with Thane

36%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VINAYAK PRERANA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANCHANGAON7,600+ in Thane

2 kmVINAYAK PRERANACompleted 48Lapsed / revoked 43Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 171 registered projects within 2 km.

Builder: NAKSHATRA GROUP

NAKSHATRA GROUP has 1 registration on MahaRERA, including VINAYAK PRERANA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VINAYAK PRERANA is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VINAYAK PRERANA?

The registered promoter entity is NAKSHATRA GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VINAYAK PRERANA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VINAYAK PRERANA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VINAYAK PRERANA?

The professionals named in the filing: Architect: DHANASHRI R BHOSALE R BHOSALE; Engineer: AMODH MADHAV LUMAN MADHAV LUMAN; Engineer: RAKESH SHARAD PATIL; Chartered Accountant: LALIT M SHARMA M SHARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VINAYAK PRERANA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VINAYAK PRERANA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VINAYAK PRERANA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.