Registered No litigation declared Residential / Group Housing project

VIMAL SHANTI SHELTER

By ANIL SHANTILAL CHORDIYA

RG-MH-71015 · RERA P51500023715 · Last updated on MahaRERA portal: 3 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
28 of 55Construction stages doneacross 5 buildings; furthest along: Stilt Floor, 80%
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

VIMAL SHANTI SHELTER is a Residential / Group Housing project by ANIL SHANTILAL CHORDIYA in Aurangabad, Maharashtra, registered with MahaRERA as P51500023715 on 2 Jan 2020. Possession is promised by 30 Dec 2026.

At a glance

Project

  • NameVIMAL SHANTI SHELTER
  • TypeResidential / Group Housing
  • Location
    • -
    • WALUJ
    • Wadgaon Kh.
    • Aurangabad
    • 431136
  • Pincode431136
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500023715
  • ReraGenie IDRG-MH-71015

Builder

  • NameANIL SHANTILAL CHORDIYA
  • Entity typeIndividual

Key dates

this monthRegisteredJan 2020PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Jan 2020
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings5 building records
  • Documents filed111 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSE NO A 1 TO A 6NA50000
RO-HOUSE A7 TO A 10NA50000
RO-HOUSE A 11 TO A 14NA50000
RO-HOUSE NO A 15 TO A 18NA50000
RO-HOUSE A 19 TO 23NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 3 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Stilt Floor, at 80%.

ROW HOUSE NO A 1 TO A 627%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RO-HOUSE A7 TO A 1048%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RO-HOUSE A 11 TO A 1482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
RO-HOUSE NO A 15 TO A 1840%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure2%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RO-HOUSE A 19 TO 2382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure3%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes60%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered10
Open Space23
BuildingClosed/CoveredOpen SpaceTotal
ROW HOUSE NO A 1 TO A 6268
RO-HOUSE A7 TO A 10246
RO-HOUSE A 11 TO A 14246
RO-HOUSE NO A 15 TO A 18246
RO-HOUSE A 19 TO 23257

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCIDCO, WALUJ MAHANAGAR, AURANGABAD
Permissible FSI1477.56
Proposed, not sanctioned1,478 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMORE CHOWK, MIDC WALUJ, AURANGABAD

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantSABS and Associates
PartnerRole in project
ANIL SHANTILAL CHORDIYA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 22 Form-1 Sep 25.pdf3 Oct 2025
Form 2File: 23 Form-2 Sep 25.pdf3 Oct 2025
Form 3File: 24 Form-3 CA 30-09-25.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: 25 Sold Sep 25.pdf3 Oct 2025
Form 1File: 1 Form-1 March 20.pdf2 Oct 2025
Form 2File: 1 Form-2 March 20.pdf2 Oct 2025
Form 3File: 1 Form-3 March 20.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 1 Sold March 20.pdf2 Oct 2025
Form 1File: 2 Form-1 June 20.pdf2 Oct 2025
Form 2File: 2 Form-2 June 20.pdf2 Oct 2025
Form 3File: 2 Form-3 June 20.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 2 Sold June 20.pdf2 Oct 2025
Form 1File: 3 Form-1 Sep 20.pdf2 Oct 2025
Form 2File: 3 Form-2 Sep 20.pdf2 Oct 2025
Form 3File: 3 Form-3 Sep 20.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 3 Sold Sep 20.pdf2 Oct 2025
Form 1File: 4 Form-1 Dec 20.pdf2 Oct 2025
Form 2File: 4 Form-2 Dec 20.pdf2 Oct 2025
Form 3File: 4 Form-3 Dec 20.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold Dec 20.pdf2 Oct 2025
Form 1File: 5 Form-1 March 21.pdf2 Oct 2025
Form 2File: 5 Form-2 March 21.pdf2 Oct 2025
Form 3File: 5 Form-3 March 21.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 5 Sold March 21.pdf2 Oct 2025
Form 1File: 6 Form-1 June 21.pdf2 Oct 2025
Form 2File: 6 Form-2 June 21.pdf2 Oct 2025
Form 3File: 6 Form-3 June 21.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 6 Sold June 21.pdf2 Oct 2025
Form 1File: 7 Form-1 Sep 21.pdf2 Oct 2025
Form 2File: 7 Form-2 Sep 21.pdf2 Oct 2025
Form 3File: 7 Form-3 Sep 21.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 7 Sold Sep 21.pdf2 Oct 2025
Form 1File: 8 Form-1 Dec 21.pdf2 Oct 2025
Form 2File: 8 Form-2 Dec 21.pdf2 Oct 2025
Form 3File: 8 Form-3 Dec 21.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 8 Sold Dec 21.pdf2 Oct 2025
Form 1File: 9 Form-1 March 22.pdf2 Oct 2025
Form 2File: 9 Form-2 March 22.pdf2 Oct 2025
Form 3File: 9 Form-3 March 22.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 9 Sold March 22.pdf2 Oct 2025
Form 1File: 10 Form-1 June 22.pdf2 Oct 2025
Form 2File: 10 Form-2 June 22.pdf2 Oct 2025
Form 3File: 10 Form-3 June 22.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 10 Sold June 22.pdf2 Oct 2025
Form 1File: 11 Form-1 Sep 22.pdf2 Oct 2025
Form 2File: 11 Form-2 Sep 22.pdf2 Oct 2025
Form 3File: 11 Form-3 Sep 22.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 11 Sold Sep 22.pdf2 Oct 2025
Form 1File: 12 Form-1 Dec 22.pdf2 Oct 2025
Form 2File: 12 Form-2 Dec 22.pdf2 Oct 2025
Form 3File: 12 Form-3 Dec 22.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 12 Sold Dec 22.pdf2 Oct 2025
Form 1File: 13 Form-1 March 23.pdf2 Oct 2025
Form 2File: 13 Form-2 March 23.pdf2 Oct 2025
Form 3File: 13 Form-3 March 23.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 13 Sold March 23.pdf2 Oct 2025
Form 1File: 14 Form-1 June 23.pdf2 Oct 2025
Form 2File: 14 Form-2 June 23.pdf2 Oct 2025
Form 3File: 14 Form-3 June 23.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 14 Sold June 23.pdf2 Oct 2025
Form 1File: 15 Form-1 Sep 23.pdf2 Oct 2025
Form 2File: 15 Form-2 Sep 23.pdf2 Oct 2025
Form 3File: 15 Form-3 Sep 23.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 15 Sold Sep 23.pdf2 Oct 2025
Form 1File: 16 Form-1 Dec 23.pdf2 Oct 2025
Form 2File: 16 Form-2 Dec 23.pdf2 Oct 2025
Form 3File: 16 Form-3 Dec 23.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 16 Sold Dec 23.pdf2 Oct 2025
Form 1File: 17 Form-1 March 24.pdf2 Oct 2025
Form 2File: 17 Form-2 March 24.pdf2 Oct 2025
Form 3File: 17 Form-3 March 24.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 17 Sold March 24.pdf2 Oct 2025
Form 1File: 18 Form-1 June 24.pdf2 Oct 2025
Form 2File: 18 Form-2 June 24.pdf2 Oct 2025
Form 3File: 18 Form-3 June 24.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 18 Sold June 24.pdf2 Oct 2025
Form 1File: 19 Form-1 Sep 24.pdf2 Oct 2025
Form 2File: 19 Form-2 Sep 24.pdf2 Oct 2025
Form 3File: 19 Form-3 Sep 24.pdf2 Oct 2025
Disclosure of Sold and Booked InventoryFile: 19 Sold Sep 24.pdf2 Oct 2025

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep VIMAL SHANTI SHELTER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WALUJ1,400+ in Aurangabad

2 kmVIMAL SHANTI SHELTERCompleted 20Lapsed / revoked 8Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 47 registered projects within 2 km.

Builder: ANIL SHANTILAL CHORDIYA

ANIL SHANTILAL CHORDIYA has 1 registration on MahaRERA, including VIMAL SHANTI SHELTER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if VIMAL SHANTI SHELTER is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIMAL SHANTI SHELTER?

The registered promoter entity is ANIL SHANTILAL CHORDIYA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIMAL SHANTI SHELTER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIMAL SHANTI SHELTER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIMAL SHANTI SHELTER?

The professionals named in the filing: Chartered Accountant: SABS and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIMAL SHANTI SHELTER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIMAL SHANTI SHELTER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIMAL SHANTI SHELTER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.