Home / Browse projects / Nashik, Maharashtra / VIDA 56

Registered No litigation declared Residential / Group Housing project

VIDA 56

By Ananapurna Enterprises Partnership Firm & Other One

RG-MH-05092 · RERA P51600023370 · Last updated on MahaRERA portal: 30 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
45 of 57Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

VIDA 56 is a Residential / Group Housing project by Ananapurna Enterprises Partnership Firm & Other One in Nashik, Maharashtra, registered with MahaRERA as P51600023370 on 12 Dec 2019. Possession is promised by 6 Dec 2026. The completion date has moved by 12 months from the original filing. 12 of the 57 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameVIDA 56
  • TypeResidential / Group Housing
  • Location
    • Gangapur Road
    • Pandit Colony
    • Nashik (M Corp.)
    • Nashik
    • 422005
  • Pincode422005
  • RERA no.P51600023370
  • ReraGenie IDRG-MH-05092

Builder

  • NameAnanapurna Enterprises Partnership Firm & Other One
  • Entity typePartnership

Key dates

this monthRegisteredDec 2019First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Dec 2019
  • Promised completion6 Dec 2026
  • Revised completionRevised to 6 Dec 2026 (originally 7 Dec 2025)
  • Buildings2 building records
  • Documents filed143 files

Current status

21%12 of 57 units booked
92.3%Work done, per cost certificate

Figures as on 30 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA8840040
BUILDING BNA8817017

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

BUILDING A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
BUILDING B68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,534 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI8110.4
Proposed, not sanctioned8,110 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHAKKERS NEXUS POINT, GROUND FLOOR, COLLEGE ROAD NEAR BHONSALA MILITARY SCHOOL
Estimated costRs 19.71 cr
Cost incurredRs 18.18 cr
Work done92.26%
BuildingWingEstimatedIncurred
BUILDING ANARs 8.05 crRs 7.97 cr
-NARs 7.69 crRs 6.28 cr
BUILDING BNARs 3.97 crRs 3.93 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMORPHOSIS ARCH MORPHOSIS ARCHITECTS OLD
ArchitectMORPHOSIS ARCHITECTS
EngineerPRASHANT PATIL
EngineerSunil Ghodke
Chartered AccountantANAND RATHI & ASSOCIATES
Chartered AccountantPandit Bhandari & co.
PartnerRole in project
Annapurna Enterprises Partnership Firm & Other One-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04122518534Dec 2025 → Dec 2026

Reason as filed by the promoterRespected Sir We unable to complete the project till 07/12/2025. We request you to please grant us extension till 06/12/2026. We are in process of completion of project. The project is not completed within time specified in registration due to financial crunch and less booking response in the project we need additional time to complete the pending development works in the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 6 Dec 2026

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf30 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf30 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf30 Jul 2026
Form 2A (FY 2025-2026)File: Vida-56-Form2A-Engineering Certificate-dtd-31-03-2026.pdf6 Jul 2026
Withdrawal Update Form 1File: Form 1_11zon.pdf12 May 2026
Withdrawal Update Form 2File: Form 2_11zon.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 _11zon.pdf12 May 2026
Withdrawal Update Form 1File: Form 1.pdf10 Mar 2026
Withdrawal Update Form 2File: form 2.pdf10 Mar 2026
Withdrawal Update Form 3File: Form 3_final.pdf10 Mar 2026
Form 1File: Form 1.pdf4 Dec 2025
Form 2File: Form 2.pdf4 Dec 2025
Form 3File: Form 3.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: Vida 56-sold unsold.pdf4 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf4 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf4 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf4 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf4 Dec 2025
Withdrawal Update Form 3File: Form 3.pdf4 Dec 2025
Withdrawal Update Form 3File: Form 3.pdf4 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf4 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Final.pdf27 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03 VIDA 2025 03 31.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 VIDA ANNAPURNA 2024 03 31.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 VIDA THAKKER N M 2024 03 31.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VIDA 2024 12 31.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VIDA 2024 12 31.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VIDA CONSO 2024 12 31.pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VIDA CONSO 2024 09 30.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 30 9 24 VIDA.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vida 56-Aslam Kadri Architect Certificate -.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 30-6-2024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30 6 2024.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VIDA 2024 03 31_compressed.pdf3 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2-Form No 2A-Certificate No P51600023370 vida.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VIDA CONSO 2024 03 31.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC-2023.pdf14 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SNo655 Plot No389Architects Certificate DEC.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VIDA CONSO 2023 12 31.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vida 26 - Form 1 - Architect Certificate.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP-2023.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VIDA CONSO 2023 09 30.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 VIDA ANNAPURNA.pdf27 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 VIDA THAKKER N M.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June-23.pdf31 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June-23.pdf31 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 - Vida - 56.pdf31 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf13 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf13 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf13 Jun 2023
Declaration about Commencement CertificateFile: S No 655-Nashik-Declaration about commencemnt certificate VIDA 56.pdf15 Mar 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DISCLOSURE ANNAPURNA ENTERPRISES.pdf15 Mar 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DISCLOSURE NM THAKKAR.pdf15 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Vida-26-Form 2A-Engineer Certificate-June-2022.pdf16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jun 22.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC-2019.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR-2020.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUN-2020.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP-2020.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC-2020.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR-2021.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC-2021.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUN-2022.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP-2022.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC-2022.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annapurna-VIDA-26-Form -2-Engineer Certificate- March-2022.pdf15 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Annapurna-Engi Cetificate-Form 2A-DEC-2019.pdf15 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: VIDA-26-Annapurna-Form 2A-Engineer Certificate-Dec-2022.pdf15 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: VIDA-26-Annapurna-Form 2A-Engineer Certificate-SEPT-2022.pdf15 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIDA 26-DEC-2019.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC-2019.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MAR-2020.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIDA 26-MAR-2020.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIDA 26-JUN-2020.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE-2020.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT-2020.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIDA 26-SEPT-2020.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VIDA 26-DEC-2020.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC-2020.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MAR-2021.pdf14 Feb 2023

How this compares with Nashik

21%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 12 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VIDA 56 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pandit Colony4,100+ in Nashik

Builder: Ananapurna Enterprises Partnership Firm & Other One

Ananapurna Enterprises Partnership Firm & Other One has 1 registration on MahaRERA, including VIDA 56. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if VIDA 56 is delayed beyond 6 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIDA 56?

The registered promoter entity is Ananapurna Enterprises Partnership Firm & Other One, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIDA 56?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIDA 56?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIDA 56?

The professionals named in the filing: Architect: MORPHOSIS ARCH MORPHOSIS ARCHITECTS OLD; Architect: MORPHOSIS ARCHITECTS; Engineer: PRASHANT PATIL; Engineer: Sunil Ghodke; Chartered Accountant: ANAND RATHI & ASSOCIATES; Chartered Accountant: Pandit Bhandari & co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIDA 56?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIDA 56. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIDA 56 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.