Home / Browse projects / Pune, Maharashtra / Vertical Oriana Phase V

Registered No litigation declared Commercial project

Vertical Oriana Phase V

By Vertical Infra

RG-MH-12910 · RERA P52100021565 · Last updated on MahaRERA portal: 10 Dec 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 51 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 51 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 85%
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Vertical Oriana Phase V is a Commercial project by Vertical Infra in Pune, Maharashtra, registered with MahaRERA as P52100021565 on 8 Jul 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 51 months from the original filing.

At a glance

Project

  • NameVertical Oriana Phase V
  • TypeCommercial
  • Location
    • Keshavnagar
    • Mundhwa
    • Keshavnagar-Mundwa
    • Pune City
    • Pune
    • 411036
  • Pincode411036
  • RERA no.P52100021565
  • ReraGenie IDRG-MH-12910

Builder

  • NameVertical Infra
  • Entity typePartnership
  • PartnersJayesh Kundankumar Jain, Kumarpal Mohanlal Sanghvi, Manoj Premchand Rathod, Nilesh Bansilal Lunkad, Samir Rafiq Shaikh, Vikram Achaldas Palesha, Vipul Sardarmal Bagrecha, Mukesh Kesrimal Oswal, Hasmukh Kundanmal Parmar, Nirmala Dilip Jain, Chandan Hirachand Gandhi, Lazarus Francis Adhav and 1 more
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2019First promiseSep 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jul 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Sep 2022)
  • Buildings1 building record
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vertical Oriana Phase VNA1010000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

Vertical Oriana Phase V: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 10 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes25%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,486 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
Krishna Lala PawarPune (M Corp.)Pune
Sunny Krishna PawarPune (M Corp.)Pune
Mangal Krishna PawarPune (M Corp.)Pune
Ambika Balkrishna MantriPune (M Corp.)Pune
Pawar Krishna LalaPune (M Corp.)Pune
Pawar Sunny KrishnaPune (M Corp.)Pune
Pawar Mangal KrishnaPune (M Corp.)Pune
Mantri Ambika BalkrishnaPune (M Corp.)Pune

Approvals and building plan

Permissible FSI3044.44
Proposed, not sanctioned3,044 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCommercial Branch, Tilakroad, Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDilip G Kale & Associates
EngineerSaurav R Mantri
EngineerSunil Mutalik & Associates
Chartered AccountantDilip Kundankumar Jain
PartnerRole in project
Vertical Infra-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017912Sep 2022 → Dec 2026

Reason as filed by the promoterWe request you to kindly consider our plea for extension of RERA registration for a further period of 15 months i.e upto 31/12/2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Jun 2022

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3_compressed.pdf10 Dec 2024
Certificates of CA (Form 3)File: Form 3_compressed-1.pdf10 Dec 2024
Certificates of CA (Form 3)File: Form 3_Quarter 2 Phase 5 _compressed.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Digitally Digitally Signed.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: E wing rera certificate.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sno7 e wing mundhawa.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vertical infra E wing mundhava (1).pdf9 Dec 2024
Certificates of CA (Form 3)File: Form3_signed_q3_compressed.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Quarter 2 Phase 5 Vertical Oriana_compressed.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf3 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure dsc.pdf3 Nov 2023
Certificates of CA (Form 3)File: Form 3 - CA Certificate_Q2 FY 2023-24 DSC.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Q4 FY 2022-23.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Q1 FY 23-24.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Q2 FY 23-24.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate Q4.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate Q1 FY 23-24.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate Q2 FY 23-24.pdf2 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2223.pdf2 Nov 2023
Certificates of CA (Form 3)File: Form 3 - CA Certificate_Q4 FY 2022-23 DSC.pdf2 Nov 2023
Certificates of CA (Form 3)File: Form 3 - CA Certificate_Q1 FY 2023-24 DSC.pdf2 Nov 2023
Certificates of CA (Form 3)File: Form 3 - CA Certificate_Q2 FY 2023-24 DSC.pdf2 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold.pdf13 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Phase V.pdf12 Apr 2023
Details of encumbrances concerned to LegalFile: Encumbrance Phase V.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 FY 21-22.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 FY 22-23.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 FY 22-23.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 FY 22-23.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 FY 21-22.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 FY 22-23.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 FY 22-23.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 FY 22-23.pdf12 Apr 2023
Certificates of CA (Form 3)File: Form 3 Q4 FY 21-22 phase V_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: Form 3 Q1 FY 22-23_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: Form 3 Q2 FY 22-23_compressed.pdf12 Apr 2023
Certificates of CA (Form 3)File: Form 3 Q3 FY 22-23_compressed.pdf12 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 phase V.pdf12 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A PHASE V.pdf12 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: E wing completion certificate.pdf25 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: E wing completion certificate.pdf23 May 2022
Details of encumbrancesFile: Non Encumbrance Certificate.pdf8 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Feb 2022
Certificates of CA (Form 3)File: Form 3.pdf3 Feb 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration Association of allottee.pdf3 Feb 2022
Status of ConveyanceFile: Declaration Conveyance Deed.pdf3 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf20 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: E Building Architect Certificate.pdf13 Oct 2021
Details of encumbrancesFile: Encumbarance Certificate.pdf9 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf9 Oct 2021
Certificates of CA (Form 3)File: Form 3.pdf9 Oct 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration Association Allottee.pdf9 Oct 2021
Status of ConveyanceFile: Declaration Conveyance Deed.pdf9 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Sep 2021
Details of encumbrancesFile: Encumrance Certificate.pdf8 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf8 Sep 2021
Certificates of CA (Form 3)File: Form 3.pdf8 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: status of association of alloree- v.pdf8 Sep 2021
Status of ConveyanceFile: status of conveyance deed - V.pdf8 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: VI PHASE 5.pdf12 Apr 2021
Building plan approvalFile: 14-17.pdf26 Feb 2020
Building plan approvalFile: 15-17.pdf26 Feb 2020
Building plan approvalFile: 16-17.pdf26 Feb 2020
Building plan approvalFile: 17-17.pdf26 Feb 2020
Building Plan Approval (IOD)File: 14-17.pdf26 Feb 2020
Building Plan Approval (IOD)File: 15-17.pdf26 Feb 2020
Building Plan Approval (IOD)File: 16-17.pdf26 Feb 2020
Building Plan Approval (IOD)File: 17-17.pdf26 Feb 2020
Building plan approvalFile: 14-17.pdf23 Jan 2020
Building plan approvalFile: 15-17.pdf23 Jan 2020
Building plan approvalFile: 16-17.pdf23 Jan 2020
Building Plan Approval (IOD)File: 14-17.pdf23 Jan 2020
Building Plan Approval (IOD)File: 15-17.pdf23 Jan 2020
Building Plan Approval (IOD)File: 16-17.pdf23 Jan 2020
Declaration in FORM BFile: Form B Promoter_compressed.pdf4 Jul 2019
Proforma of Allotment letterFile: DRAFT AGREEMENT - E - BUILDING.pdf4 Jul 2019
Building plan approvalFile: plan 0005_compressed.pdf28 Jun 2019
Building plan approvalFile: plan 0006_compressed.pdf28 Jun 2019
Building plan approvalFile: plan 0007_compressed.pdf28 Jun 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 51 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vertical Oriana Phase V on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhwa13,700+ in Pune

Builder: Vertical Infra

Vertical Infra has 5 registrations on MahaRERA, including Vertical Oriana Phase I and Vertical Oriana Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vertical Oriana Phase V is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vertical Oriana Phase V?

The registered promoter entity is Vertical Infra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vertical Oriana Phase V?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vertical Oriana Phase V?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vertical Oriana Phase V?

The professionals named in the filing: Architect: Dilip G Kale & Associates; Engineer: Saurav R Mantri; Engineer: Sunil Mutalik & Associates; Chartered Accountant: Dilip Kundankumar Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vertical Oriana Phase V?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vertical Oriana Phase V. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vertical Oriana Phase V to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.