ReraGenieLog inGet a buyer report

Home / Browse projects / VERONA

Registered Litigation declared Others project

VERONA

By ADRIANA CONSTRUCTIONS LLP

RG-MH-30956 · RERA P51900079290 · Last updated on MahaRERA portal: 17 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Rs 100.00 crore secured on the land, in favour of ICICI BANK LIMITED

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2029Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Plinth, 90%
157 of 157Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

VERONA is a Others project by ADRIANA CONSTRUCTIONS LLP in MAHIM, 400016, registered with MahaRERA as P51900079290 on 25 Feb 2025. Possession is promised by 31 Dec 2029. 0 of the 157 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameVERONA
  • TypeOthers
  • Location
    • Landmark SITUATED AT SITALADEVI TEMPLE ROAD
    • MAHIM
    • 400016
  • Pincode400016
  • RERA no.P51900079290
  • ReraGenie IDRG-MH-30956

Builder

  • NameADRIANA CONSTRUCTIONS LLP
  • Entity typePartnership

Key dates

this monthRegisteredFeb 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Feb 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Current status

0%0 of 157 units booked
23.4%Work done, per cost certificate

Figures as on 17 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING BNA2115621577
WING ANA211480080

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Plinth, at 90%.

WING B30%
ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)15%
Plinth90%
Stilt Floor20%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A30%
ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)15%
Plinth90%
Stilt Floor20%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed179

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots179
Closed/Covered179
BuildingClosed/CoveredTotal
WING B9090
WING A8989

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,009 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofICICI BANK LIMITED
Secured amountRs 100.00 crore
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
HOMESTEAD ESTATESAND PROPERTIES PRIVATE LIMITEDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI10134.96
Proposed, not sanctioned10,135 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Zehra Manzil, 91, Lady Jamshedji Road, Next To Paradise Cinema, Mahim, Mumbai.400016
Estimated costRs 79.00 cr
Cost incurredRs 18.50 cr
Work done23.42%
BuildingWingEstimatedIncurred
WING ANARs 48.00 crRs 11.10 cr
WING BNARs 28.00 crRs 7.40 cr
-NARs 3.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMEDHA GORE
EngineerVISHWAKARMA ENTERPRISES
Chartered AccountantMINAL ADHIKARI & CO
Chartered Accountantnaik danait&associates
PartnerRole in project
ADRIANA CONSTRUCTIONS LLP-

Litigation declared1

CaseCourtStatus
WP/11545/2024/2024high court bombaydisposed of as withdrawn

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: VERONA FORM 1 ARCHITECTS CERTIFICATE 04 04 26.pdf17 Apr 2026
Withdrawal Update Form 2File: VERONA FORM 2 ENGG.pdf17 Apr 2026
Withdrawal Update Form 3File: VERONA Form 3 CA yr end 31 03 2026.pdf17 Apr 2026
Form 2A (FY 2024-2025)File: form 2A 24-25.PDF2 Apr 2026
Withdrawal Update Form 1File: 08 01 26 Form 1 Architects Certificate.pdf19 Jan 2026
Withdrawal Update Form 2File: 15 01 26 Form 2 Adriana Const LLP Verona.pdf19 Jan 2026
Withdrawal Update Form 3File: 17 01 26 FORM 3 RERA Verona.pdf19 Jan 2026
Withdrawal Update Form 1File: form 1 verona.PDF17 Oct 2025
Withdrawal Update Form 1File: form 1 verona.PDF17 Oct 2025
Withdrawal Update Form 1File: form 1 verona.PDF17 Oct 2025
Withdrawal Update Form 2File: verona sept 25.PDF17 Oct 2025
Withdrawal Update Form 2File: verona sept 25.PDF17 Oct 2025
Withdrawal Update Form 2File: verona sept 25.PDF17 Oct 2025
Withdrawal Update Form 3File: VERONA FORM 3 SEPT25.PDF17 Oct 2025
Withdrawal Update Form 3File: VERONA FORM 3 SEPT25.PDF17 Oct 2025
Withdrawal Update Form 3File: VERONA FORM 3 SEPT25.PDF17 Oct 2025
Form 5 (FY 2024-2025)File: verona form 5.PDF20 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.PDF15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.PDF14 Apr 2025
Proforma of Agreement for saleFile: RERA AGRMT - ADRIANA CONSTRUCTIONS LLP.pdf9 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance self Declaration.PDF28 Feb 2025
CERSAI detailsFile: 400088313335.pdf28 Feb 2025
CERSAI detailsFile: 400088313276.pdf28 Feb 2025
CERSAI detailsFile: Cersai Declaration.PDF28 Feb 2025
CERSAI detailsFile: 400088313307.pdf28 Feb 2025
Details of encumbrances concerned to LegalFile: Encumbrance self Declaration.PDF28 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured.PDF28 Feb 2025
Details of encumbrances concerned to FinanceFile: Encumbrance self Declaration.PDF28 Feb 2025
CERSAI detailsFile: Cersai Declaration.PDF28 Feb 2025
CERSAI detailsFile: 400088313276.pdf28 Feb 2025
CERSAI detailsFile: 400088313307.pdf28 Feb 2025
CERSAI detailsFile: 400088313335.pdf28 Feb 2025
Details of encumbrances concerned to LegalFile: Encumbrance self Declaration.PDF28 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured.PDF28 Feb 2025
Other - TechnicalFile: FORM B (2).PDF18 Feb 2025
Other - FinanceFile: Adriana to Maharera.pdf7 Feb 2025
Deviation Report with respect to Allotment letterFile: Deviation - Allotment.pdf14 Jan 2025
Other - TechnicalFile: - Specimen format of Declaration - layout.pdf14 Jan 2025
Deviation Report with respect to model copy of AgreementFile: _ Deviation Report for Agreement for Sale-1.pdf14 Jan 2025
Deviation Report with respect to model copy of AgreementFile: _ Deviation Report for Agreement for Sale-2.pdf14 Jan 2025
Proforma of Agreement for saleFile: RERA AGMT - ADRIANA.pdf14 Jan 2025
Details of encumbrances concerned to FinanceFile: 13-01 - 25 Adriana - No encumbrance Self - Decl.PDF13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adriana CA - CERTIFICATE (2).pdf13 Jan 2025
Details of encumbrances concerned to LegalFile: 13-01 - 25 Adriana - No encumbrance Self - Decl.PDF13 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Adriana - Disclosure Sec Unsec Fin (1).PDF13 Jan 2025
Declaration about Commencement CertificateFile: - CC COVERING LETTER.pdf8 Jan 2025
Layout approvalFile: Drawing-8 (2)_1-7 (1).pdf7 Jan 2025
Layout approvalFile: Drawing-8 (2)_8-end.pdf7 Jan 2025
Copy of Layout Approval (in case of layout)File: Drawing-8 (2)_1-7 (1).pdf7 Jan 2025
Copy of Layout Approval (in case of layout)File: Drawing-8 (2)_8-end.pdf7 Jan 2025
Proforma of Allotment letterFile: MahaRERA Allotment Letter - ADRIANA MARKED IN BLUE ISCHANGES MADE BY US MARKED IN YELLOW I7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Annexure B - Form 2 -SIGNED.PDF7 Jan 2025
Building plan approvalFile: IOD SIGNED.pdf4 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD SIGNED.pdf4 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate - Adriana - Project - Verona.PDF31 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: First CC dt08 10 2024.pdf31 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B - ICICI BANK .PDF7 Nov 2024
PAN CardFile: 1 - ADRIANA CONSTRUCTIONS LLP - PAN CARD.pdf21 May 2024
Copy of the legal title reportFile: Verona - FP396A - Title Certificate.pdf21 May 2024
Details of encumbrances concerned to FinanceFile: No encumbrance self declaration Financial.pdf21 May 2024
Declaration in FORM BFile: Form B (27).PDF21 May 2024
CERSAI detailsFile: 08-01-2025 - CERSAI DECLARATION.PDF21 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (1).PDF21 May 2024
Details of encumbrances concerned to LegalFile: No encumbrance self declaration Financial.pdf21 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 - Disclosure of Interest in Other Real Estate Organizations - JF.pdf21 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 - Disclosure of Interest in Other Real Estate Organizations - DF.pdf21 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 - Disclosure of Interest in Other Real Estate Organizations - SJ.pdf21 May 2024

Keep VERONA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHIM

Builder: ADRIANA CONSTRUCTIONS LLP

ADRIANA CONSTRUCTIONS LLP has 1 registration on MahaRERA, including VERONA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if VERONA is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VERONA?

The registered promoter entity is ADRIANA CONSTRUCTIONS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VERONA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VERONA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VERONA?

The professionals named in the filing: Architect: SUMEDHA GORE; Engineer: VISHWAKARMA ENTERPRISES; Chartered Accountant: MINAL ADHIKARI & CO; Chartered Accountant: naik danait&associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VERONA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VERONA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VERONA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.