Completed No litigation declared Others project

Vermont

By SIA Developers

RG-MH-09625 · RERA P52100001456 · Last updated on MahaRERA portal: 25 Jan 2023

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
24 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 90%
3Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

Vermont is a Others project by SIA Developers in Pune, Maharashtra, registered with MahaRERA as P52100001456 on 28 Jul 2017. The registration is recorded completed; possession was promised by 29 Dec 2020. The completion date has moved by 18 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameVermont
  • TypeOthers
  • Location
    • BIAF ROAD
    • Moze Engineering College
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001456
  • ReraGenie IDRG-MH-09625

Builder

  • NameSIA Developers
  • Entity typePartnership
  • PartnerSagar Rikhablal Bhandari
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseJun 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jul 2017
  • Promised completion29 Dec 2020
  • Revised completionRevised to 29 Dec 2020 (originally 30 Jun 2019)
  • Buildings3 building records
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BNA130000
CNA120000
CommercialNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 25 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

B87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Commercial91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes100%
Street LightingYes50%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed188

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots188
Closed/Covered178
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
B761086
C79079
Commercial23023

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,209 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
Ashwini GaikwadPune (M Corp.)Pune
Kamal GaikwadPune (M Corp.)Pune
Kaustubh Jadhav-Pune
Ranghnath GaikwadPune (M Corp.)Pune
Vivek GaikwadPune (M Corp.)Pune

Approvals and building plan

Permissible FSI12404.43
Proposed, not sanctioned12,404 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCamp Branch, Moledina Road, Pune 411001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Vikas Achalkar
EngineerM/s. G. A. Bhilare Consultants Pvt. Ltd.
EngineerSachin Maruti Yadav
PartnerRole in project
SIA Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100002074Jun 2019 → Jun 2020

Reason as filed by the promoter1. When we initiated sale of said project there was substantial quantum of new flat bookings on regular basis. During last one year there was significant reduction in number of bookings which in turn affected cash flow of the project causing delay in completing construction activities. 2.These are compelling circumstances and reasons which are beyond our control because of which we were unable complete the project during stipulated time frame.

Litigation declared1

CaseCourtStatus
PDF CC NO 359/2015State Forum Consumer CourtEvidence

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC005000000023170Praful Pandurang GhagiSia Developers03/07/2019
CC005000000033469Nishnat MathaisSia Developers26/09/2019
CC005000000033585Amol Nivratirao JadhavSia Developers31/10/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jun 2020

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate - BA Vermont.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Sia Developers - B A Vermont.pdf12 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Sia Developers.pdf13 Jul 2021
Details of Restarting of Construction work post lockdownFile: vermont.pdf18 Jun 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Vermont C Hub.pdf4 Jun 2020
Certificates of CA (Form 5)File: Form 5 Sia Developers.pdf1 Oct 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Vemont B-compressed.pdf30 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Vermont Comm-compressed.pdf30 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Vemont B-compressed.pdf30 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Vermont B Form 04.pdf30 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Vermont Comm Form 04.pdf30 Sep 2019
OtherFile: Completion Certificate min.pdf14 Jan 2019
Certificates of CA (Form 5)File: Form 5 ( UT ) - Sia Developers.pdf29 Sep 2018
Building plan approvalFile: Layout R1.pdf6 Dec 2017
Layout approvalFile: C Bldg R1.pdf6 Dec 2017
Layout approvalFile: Commercial A R1.pdf6 Dec 2017
Copy of Layout Approval (in case of layout)File: C Bldg R1.pdf6 Dec 2017
Copy of Layout Approval (in case of layout)File: Commercial A R1.pdf6 Dec 2017
Building Plan Approval (IOD)File: Layout R1.pdf6 Dec 2017
Proforma of Allotment letterFile: BA VERMONT - FLAT AGREEMENT.pdf19 Aug 2017
Layout approvalFile: Comm 1A.pdf25 Jul 2017
Layout approvalFile: Comm 2.pdf25 Jul 2017
Building plan approvalFile: Layout Plan 02.pdf25 Jul 2017
Layout approvalFile: Vermont Layout Phase dwg.pdf25 Jul 2017
Layout approvalFile: B Bldg 01.pdf25 Jul 2017
Layout approvalFile: C Bldg.pdf25 Jul 2017
Layout approvalFile: C Bldg02.pdf25 Jul 2017
PAN CardFile: sia developers.pdf25 Jul 2017
Copy of the legal title reportFile: Final Seach Title Reeport 2017.pdf25 Jul 2017
Details of encumbrancesFile: Sia Developers Encumbrance.pdf25 Jul 2017
Details of encumbrancesFile: Index II Mortgage Deed - Patel - Sia Developers - June 2015-2-4.pdf25 Jul 2017
Details of encumbrancesFile: Index II MORTGAGE DEED MUSLIM BANK-2-3.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Vermont Layout Phase dwg.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: B Bldg 01.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: C Bldg.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: C Bldg02.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Comm 1A.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Comm 2.pdf25 Jul 2017
Building Plan Approval (IOD)File: Layout Plan 02.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Vemont_Commencement Certificate.pdf25 Jul 2017
Declaration in FORM BFile: Affiavit cum declation Sia Developers Final.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Vermont Architect Certificate.pdf25 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Vermont Engineer Certificate01.pdf25 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Vermont.pdf25 Jul 2017
Proforma of Allotment letterFile: BA VERMONT - RERA.pdf25 Jul 2017
Proforma of Allotment letterFile: BA HUB - Flat agreement RERA.pdf25 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Vermont PH-IWagholi Pune236CompletedMay 2017Late, Jul 2017
IvoryWagholi Pune150CompletedDec 2015Oct 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vermont on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moze Engineering College13,700+ in Pune

2 kmVermontCompleted 54Lapsed / revoked 26Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 118 registered projects within 2 km.

Builder: SIA Developers

SIA Developers has 1 registration on MahaRERA, including Vermont. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vermont is delayed beyond 29 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vermont?

The registered promoter entity is SIA Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vermont?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Vermont?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Vermont?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vermont?

The professionals named in the filing: Architect: Ar. Vikas Achalkar; Engineer: M/s. G. A. Bhilare Consultants Pvt. Ltd.; Engineer: Sachin Maruti Yadav. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vermont?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vermont. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vermont to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.