Red flags
- Litigation declared, 3 cases
- 1 complaint at MahaRERA
- Completion date moved by 30 months
- 2 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Veridian at Emerald Isle 13A and 13B is a Residential / Group Housing project by Larsen & Toubro Ltd. (Realty Division) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029893 on 12 Jul 2021. Possession is promised by 30 Sep 2027. The completion date has moved by 30 months from the original filing. 153 of the 154 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameVeridian at Emerald Isle 13A and 13B
- TypeResidential / Group Housing
- Location
- Saki Vihar Road
- Powai
- Kurla
- Mumbai Suburban
- 400072
- Pincode400072
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800029893
- ReraGenie IDRG-MH-30185
Builder
- NameLarsen & Toubro Ltd. (Realty Division)
- Entity typeCompany
- CINL99999MH1946PLC004768
- GSTIN27AAACL0140P5ZF
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Chairman & Managing DirectorSekharipuram Narayanan Subrahmanyan
- President, Whole-time Director & CFORamamurthi Shankar Raman
- Whole-time Director & President (Energy)Subramanian Sudarsanam Sarma
- Whole time Director and Senior ExecutivesSudhindra Vasantrao Desai, Tharayil Madhava Das
- Whole-time Director & Senior ExecutiveAnil Vithal Parab
- Other registrations24 more →
- Completed7 of 25
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects30 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Jul 2021
- Promised completion30 Sep 2027
- Revised completionRevised to 30 Sep 2027 (originally 31 Mar 2025)
- Buildings2 building records
- Documents filed143 files
Current status
Figures as on 24 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Veridian at Emerald Isle 13A | NA | 22 | 20 | 78 | 0 | 78 |
| Veridian at Emerald Isle 13B | NA | 23 | 20 | 76 | 0 | 76 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 24 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
Veridian at Emerald Isle 13A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Veridian at Emerald Isle 13B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed72
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Veridian at Emerald Isle 13A | 24 | 24 |
| Veridian at Emerald Isle 13B | 48 | 48 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Veridian at Emerald Isle 13B | NA | Rs 35.77 cr | Rs 32.08 cr |
| Veridian at Emerald Isle 13A | NA | Rs 27.01 cr | Rs 26.28 cr |
| - | NA | Rs 24.91 cr | Rs 19.08 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | HITEN SETHI |
| Engineer | Swapnil Joshi |
| Engineer | Pankaj More |
| Chartered Accountant | Urmit Shah |
| Chartered Accountant | M S K A & Associates |
| Partner | Role in project |
|---|---|
| Larsen & Toubro Ltd. (Realty Division) | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterI, Mr. Ankur Jadhav, duly authorised by Larsen & Toubro Ltd. (Realty Division), Promoter of the project ‘Veridian at Emerald Isle 13A and 13B’ registered with MahaRERA under project registration number - P51800029893 (hereinafter referred to as the said project), here by state that the project registration validity of the said project is expired on March 31, 2025. I state that the Promoter has already obtained PART Occupation Certificate ‘CHE/ES/1010/L/337(NEW)/OCC/13/New’ dated 24 September 2024 from MUNICIPAL CORPORATION OF GREATER MUMBAI for 16/18 floors registered with MahaRERA. I further
Reason as filed by the promoterNA
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 2755/2011/2011 | HIGH COURT OF JUDICATURE AT BOMBAY | For Framing of Issues |
| 2593/2012/2012 | HIGH COURT OF JUDICATURE AT BOMBAY | For Framing of Issues |
| 2755 of 2011/2011 | HIGH COURT OF JUDICATURE AT BOMBAY | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504395 | BHAVIN ASHER | Larsen & Toubro Ltd. (Realty Division) | 10/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jun 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Sep 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2027
Documents filed143
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: EI 13AB.pdf | 24 Sep 2026 |
| Commencement certificateFile: Emerald isle CC.pdf | 18 Sep 2026 |
| Withdrawal Update Form 1File: Form-1-13AB.pdf | 18 Sep 2026 |
| Withdrawal Update Form 1File: Form-1-13AB.pdf | 18 Sep 2026 |
| Withdrawal Update Form 1File: RERA Form 1 Tower 13A and13B_EI.pdf | 18 Sep 2026 |
| Withdrawal Update Form 1File: EI - T13A n T13B Bldg 02.pdf | 18 Sep 2026 |
| Withdrawal Update Form 1File: T13A B.pdf | 18 Sep 2026 |
| Withdrawal Update Form 1File: T13A B.pdf | 18 Sep 2026 |
| Withdrawal Update Form 2File: Form-2-13AB.pdf | 18 Sep 2026 |
| Withdrawal Update Form 2File: Form-2-13AB.pdf | 18 Sep 2026 |
| Withdrawal Update Form 2File: Form-2-13AB.pdf | 18 Sep 2026 |
| Withdrawal Update Form 2File: RERA Form-2-13AB.pdf | 18 Sep 2026 |
| Withdrawal Update Form 2File: Form-2-13AB_Q1(26-27).pdf | 18 Sep 2026 |
| Withdrawal Update Form 2File: Form-2-13AB_Q1(26-27).pdf | 18 Sep 2026 |
| Withdrawal Update Form 3File: Form-3-13AB.pdf | 18 Sep 2026 |
| Withdrawal Update Form 3File: Form-3-13AB.pdf | 18 Sep 2026 |
| Withdrawal Update Form 3File: Form 3 with table C_Q3_FY 25-26_13AB_EI.pdf | 18 Sep 2026 |
| Withdrawal Update Form 3File: Form 3 with Table C_Q4_FY 25-26_T13AB.pdf | 18 Sep 2026 |
| Withdrawal Update Form 3File: Form 3 with Table C_Q1_FY 26-27_13AB.pdf | 18 Sep 2026 |
| Withdrawal Update Form 3File: Form 3 with Table C_Q1_FY 26-27_13AB.pdf | 18 Sep 2026 |
| Form 2A (FY 2025-2026)File: Form 2A-13AB f.pdf | 18 Sep 2026 |
| Withdrawal Update Form 1File: Form-1-13AB.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form-2-13AB.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form-3-13AB.pdf | 18 Oct 2025 |
| Form 2A (FY 2024-2025)File: 13ab.pdf | 4 Oct 2025 |
| Form 5 (FY 2024-2025)File: L&T - RERA Certificate -13AB-signed.pdf | 30 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-13AB.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-13AB.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-13AB.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory-13AB.pdf | 20 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-13AB.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-13AB.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-13AB.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-13AB.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory-13AB.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-13AB.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-13AB.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-13AB.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-13AB.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory-13AB.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-13AB.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-13AB.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-13AB.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-13AB.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory-13AB.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-13AB.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-13AB.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2-T13AB-Q2-FY 24-25.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA-Form-2A-T13AB-Q2-FY 24-25.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2-FY 24-25-T13AB.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory-EI-13AB.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-13AB.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2-T13AB-Q2-FY 24-25.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA-Form-2A-T13AB-Q2-FY 24-25.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2-FY 24-25-T13AB.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory-EI-13AB.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-13AB.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2-FY 24-25-T13AB.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2-T13AB-Q2-FY 24-25.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory-EI-13AB.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA-Form-2A-T13AB-Q2-FY 24-25.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tower 13AB.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tower 13AB.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tower 13AB.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 RERA Form 1 Tower 13A 13B.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 T13A-B Q1 24-25.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 T13A-B Q1 24-25.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3 Form 2A T13-B Q1 24-25.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: EI 13A and 13B.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q1_FY 24-25_Tower 13AB.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: EI Tower 13 A and 13 B.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - EI T13A and T13B.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 T13A and T13B Q4 FY 23-24.pdf | 20 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A T13A and T13B Q4 FY 23-24.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Q4_FY 2324_13AB.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_13AB.pdf | 26 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 T13A T13B.pdf | 27 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Tower T13A T13B.pdf | 27 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Veridian_13AB.pdf | 27 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_13AB.pdf | 27 Jan 2024 |
Promoter's earlier projects12
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Emerald Isle - T16P51800013504 | Kurla, Mumbai Suburban | 127 | Oct 2017 | Ongoing | Dec 2024Registered original: Dec 2023 | Not delivered |
| Test | Test | 1 | - | Ongoing | Nov 2024 | Not delivered |
| Emerald Isle - T15 | Saki Vihar Road Powai | 208 | - | Completed | Jun 2023 | Jun 2023 |
| Emerald Isle - T10 | Saki Vihar Road Powai | 203 | - | Completed | Jun 2023 | Jun 2023 |
| Emerald Isle - T9 | Saki Vihar Road Powai | 150 | - | Completed | Jun 2021 | Apr 2021 |
| Emerald Isle - T8 | Saki Vihar Road Powai | 72 | - | Completed | Dec 2018 | Dec 2018 |
| Emerald Isle - T7 | Saki Vihar Road Powai | 72 | - | Completed | Jun 2018 | Apr 2018 |
| Emerald Isle - T4, T5, T6 | Saki Vihar Road Powai | 371 | - | Completed | Jun 2018 | Sep 2017 |
| EMERALD ISLE TOWER 3 | LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 400072 | 139 | - | Completed | Aug 2016 | Jul 2016 |
| EMERALD ISLE TOWER 2 | LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 400072 | 93 | - | Completed | Aug 2016 | Jul 2016 |
| EMERALD ISLE TOWER 1 | LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 400072 | 42 | - | Completed | Aug 2016 | Jul 2016 |
| Sanofi | Sanofi House No 117B Near L&T Business Park Saki Vihar Road Mumbai 400072 | 1 | - | Completed | Mar 2015 | Mar 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 24 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 143 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Veridian at Emerald Isle 13A and 13B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Powai6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 118 registered projects within 2 km.
AMARYLLIS TOWERS AND PLAZA
NAHAR BUILDERS LTD.
JANGID MEADOWS
JANGID HOME PVT LTD
NAHAR'S CHANDI VALLEY - PHASE I
NAHAR BUILDERS LIMITED
KABRA RESIDENCY PARK
AHINSA BUILDTECH PVT LTD
IBIS at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
BARBET at L and T Realty Elixir Reserve
Larsen & Toubro Ltd. (Realty Division)
See every Mumbai Suburban project, with the district possession charts
Builder: Larsen & Toubro Ltd. (Realty Division)
Larsen & Toubro Ltd. (Realty Division) has 25 registrations on MahaRERA, including Emerald Isle - T7 and Emerald Isle - T8. Its filings disclose 30 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Veridian at Emerald Isle 13A and 13B is delayed beyond 30 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Veridian at Emerald Isle 13A and 13B?
The registered promoter entity is Larsen & Toubro Ltd. (Realty Division), a company as per the filing. Its CIN L99999MH1946PLC004768 and GSTIN 27AAACL0140P5ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Veridian at Emerald Isle 13A and 13B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Veridian at Emerald Isle 13A and 13B?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Veridian at Emerald Isle 13A and 13B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Veridian at Emerald Isle 13A and 13B?
The professionals named in the filing: Architect: HITEN SETHI; Engineer: Swapnil Joshi; Engineer: Pankaj More; Chartered Accountant: Urmit Shah; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Veridian at Emerald Isle 13A and 13B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback