RG-MH-30188 · RERA P51800029888 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • Completion date moved by 23 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 23 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
8 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

Veridian at Emerald Isle 12C is a Residential / Group Housing project by Larsen & Toubro Ltd. (Realty Division) in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029888 on 12 Jul 2021. Possession is promised by 31 May 2027. The completion date has moved by 23 months from the original filing. 70 of the 78 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameVeridian at Emerald Isle 12C
  • TypeResidential / Group Housing
  • Location
    • Saki Vihar Road
    • Powai
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800029888
  • ReraGenie IDRG-MH-30188

Builder

  • NameLarsen & Toubro Ltd. (Realty Division)
  • Entity typeCompany
  • CINL99999MH1946PLC004768
  • GSTIN27AAACL0140P5ZF
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Chairman & Managing DirectorSekharipuram Narayanan Subrahmanyan
  • President, Whole-time Director & CFORamamurthi Shankar Raman
  • Whole-time Director & President (Energy)Subramanian Sudarsanam Sarma
  • Whole time Director and Senior ExecutivesSudhindra Vasantrao Desai, Tharayil Madhava Das
  • Whole-time Director & Senior ExecutiveAnil Vithal Parab
  • Other registrations24 more →
  • Completed7 of 25
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects30 →

Key dates

this monthRegisteredJul 2021First promiseJun 2025Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Jul 2021
  • Promised completion31 May 2027
  • Revised completionRevised to 31 May 2027 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed141 files

Current status

90%70 of 78 units booked
98.8%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Veridian at Emerald Isle 12CNA221878078

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Veridian at Emerald Isle 12C: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered60

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area361 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jun 2026

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI5123.52
Proposed, not sanctioned722 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAndheri East, Mumbai - 400093
Estimated costRs 51.63 cr
Cost incurredRs 51.00 cr
Work done98.78%
BuildingWingEstimatedIncurred
Veridian at Emerald Isle 12CNARs 33.67 crRs 36.94 cr
-NARs 17.96 crRs 14.06 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHITEN SETHI
EngineerSwapnil Joshi
Chartered AccountantUrmit Shah
PartnerRole in project
Larsen & Toubro Ltd. (Realty Division)-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02062621205Jun 2025 → May 2027

Reason as filed by the promoterI state that the completion work of the said project was delayed due to certain common infrastructure work, which is being executed, pending regulatory approvals and certain mitigating circumstances. The promoter has completed the balance project work. Pert Chart is enclosed herewith.

Litigation declared3

CaseCourtStatus
2755/2011/2011HIGH COURT OF JUDICATURE AT BOMBAYFor Framing of Issues
2593/2012/2012HIGH COURT OF JUDICATURE AT BOMBAYFor Framing of Issues
2755 of 2011/2011HIGH COURT OF JUDICATURE AT BOMBAYOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: T12C.pdf18 Jul 2026
Withdrawal Update Form 2File: Form-2-12C_Q1(26-27).pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3 with Table C_Q1_FY 26-27_12C.pdf18 Jul 2026
Withdrawal Update Form 1File: RERA Form 1 Tower 12C_EI.pdf18 Jun 2026
Withdrawal Update Form 1File: EI - T12C Bldg 02.pdf18 Jun 2026
Withdrawal Update Form 2File: Form-2-12C.pdf18 Jun 2026
Withdrawal Update Form 2File: RERA Form-2-12C.pdf18 Jun 2026
Withdrawal Update Form 3File: Form 3 with Table C_Q3_FY 25-26_12C_EI.pdf18 Jun 2026
Withdrawal Update Form 3File: Form 3 with table C_Q4_FY 25-26_T12C.pdf18 Jun 2026
Withdrawal Update Form 1File: Form-1-12C.pdf15 Jun 2026
Withdrawal Update Form 1File: RERA Form 1 Tower 12C_EI.pdf15 Jun 2026
Withdrawal Update Form 2File: Form-2-12C.pdf15 Jun 2026
Withdrawal Update Form 2File: Form-2-12C.pdf15 Jun 2026
Withdrawal Update Form 3File: Form-3-12C.pdf15 Jun 2026
Withdrawal Update Form 3File: Form 3 with Table C_Q3_FY 25-26_12C_EI.pdf15 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A-12C f.pdf20 Apr 2026
Withdrawal Update Form 1File: Form-1-12C.pdf18 Oct 2025
Withdrawal Update Form 2File: Form-2-12C.pdf18 Oct 2025
Withdrawal Update Form 3File: Form-3-12C.pdf18 Oct 2025
Form 2A (FY 2024-2025)File: 12c-signed.pdf4 Oct 2025
Form 5 (FY 2024-2025)File: L&T - RERA Certificate -12C-signed.pdf16 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-12C.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-12C.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-12C.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory-12C.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-12C.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-12C.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-12C.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-12C.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory-12C.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-12C.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-12C.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-12C.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-12C.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory-12C.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-12C.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1-12C.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-12C.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-12C.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory-12C.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-12C.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-12C.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2-T12C-Q2-FY 24-25.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA-Form-2A-T12C-Q2-FY 24-25.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2-FY 24-25-T12C.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory-EI-12C.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-12C.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2-T12C-Q2-FY 24-25.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA-Form-2A-T12C-Q2-FY 24-25.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2-FY 24-25-T12C.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory-EI-12C.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-12C.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Q2-FY 24-25-T12C.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA-Form-2-T12C-Q2-FY 24-25.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory-EI-12C.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA-Form-2A-T12C-Q2-FY 24-25.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tower 12C.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tower 12C.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Tower 12C.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 RERA Form 1 Tower 12C.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 T12C Q1 24-25.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 T12C Q1 24-25.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 4 Form 2A T12C Q1 24-25.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: EI 12C.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q1_FY 24-25_Tower 12C.pdf19 Jul 2024
Details of encumbrances concerned to FinanceFile: EI Tower 12 C.pdf25 Apr 2024
Details of encumbrances concerned to LegalFile: EI Tower 12 C.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - EI T12C.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 T12C Q4 FY 23-24.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A T12C Q4 FY 23-24.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Q4_FY 2324_12C.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_12C.pdf26 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 T12C.pdf27 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Tower T12C.pdf27 Jan 2024
Disclosure of sold/ booked inventoryFile: Veridian_12C.pdf27 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_12C.pdf27 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 Tower 12C.PDF20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 T12C.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: 12C_sold unsold.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with Table C_Q2_FY 23-24_Tower 12C.pdf20 Oct 2023

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Emerald Isle - T16P51800013504Kurla, Mumbai Suburban127Oct 2017OngoingDec 2024Registered original: Dec 2023Not delivered
TestTest1-OngoingNov 2024Not delivered
Emerald Isle - T15Saki Vihar Road Powai208-CompletedJun 2023Jun 2023
Emerald Isle - T10Saki Vihar Road Powai203-CompletedJun 2023Jun 2023
Emerald Isle - T9Saki Vihar Road Powai150-CompletedJun 2021Apr 2021
Emerald Isle - T8Saki Vihar Road Powai72-CompletedDec 2018Dec 2018
Emerald Isle - T7Saki Vihar Road Powai72-CompletedJun 2018Apr 2018
Emerald Isle - T4, T5, T6Saki Vihar Road Powai371-CompletedJun 2018Sep 2017
EMERALD ISLE TOWER 3LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 400072139-CompletedAug 2016Jul 2016
EMERALD ISLE TOWER 2LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 40007293-CompletedAug 2016Jul 2016
EMERALD ISLE TOWER 1LT Emerald Isle Near LT Business Park Saki Vihar Road Powai 40007242-CompletedAug 2016Jul 2016
SanofiSanofi House No 117B Near L&T Business Park Saki Vihar Road Mumbai 4000721-CompletedMar 2015Mar 2015

How this compares with Mumbai Suburban

90%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 23 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Veridian at Emerald Isle 12C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Powai6,700+ in Mumbai Suburban

2 kmVeridian at Emerald IsleCompleted 56Lapsed / revoked 24Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 118 registered projects within 2 km.

Builder: Larsen & Toubro Ltd. (Realty Division)

Larsen & Toubro Ltd. (Realty Division) has 25 registrations on MahaRERA, including Emerald Isle - T7 and Emerald Isle - T8. Its filings disclose 30 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Veridian at Emerald Isle 12C is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Veridian at Emerald Isle 12C?

The registered promoter entity is Larsen & Toubro Ltd. (Realty Division), a company as per the filing. Its CIN L99999MH1946PLC004768 and GSTIN 27AAACL0140P5ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Veridian at Emerald Isle 12C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Veridian at Emerald Isle 12C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Veridian at Emerald Isle 12C?

The professionals named in the filing: Architect: HITEN SETHI; Engineer: Swapnil Joshi; Chartered Accountant: Urmit Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Veridian at Emerald Isle 12C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Veridian at Emerald Isle 12C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Veridian at Emerald Isle 12C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.